Exhibit F Quality Control Plan Sample.pdf
PDF 109 KB Posted
- Solicitation number
- W912QR-Q-24-0115
About this file
This document is a sample Quality Control Plan for a federal contract opportunity. The plan outlines the contractor's procedures for ensuring contract specifications are met, including employee training, inspection schedules, quality control reports, and corrective actions.
The related federal contract opportunity is for the replacement of life safety signs at the McAlpine Lock and Dam. The government will furnish the signs, and the contractor will provide all other personnel, equipment, and materials necessary for installation. The work is 100% set aside for small businesses under NAICS code 561210. Quotes are due by 10 September 2024, and a site visit is scheduled for 29 August 2024. The contract award will be made to the lowest priced offeror. Technical questions must be submitted by 3 September 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit K
Quality Control Plan Sample
Quality Control Plan Sample
Prior to beginning work, each employee will be trained to perform the task he or she has been hired to perform.
This training will consist of a review and thorough explanation of the contract specifications and requirements, followed by ‘on-the-job’ training to ensure that the contract requirements are understood. All members of a crew will be cross-trained, so that they understand all aspects of a particular type of work. Following training, each employee will be provided with a checklist of work that they are required to perform, which will serve to ensure that all aspects of a particular job are completed on time. The employee will mark each item as it is completed (with completion time) and will sign and date each sheet to ensure accountability for completed work.
Prior to start of the contract, the Contractor will designate a Quality Control Inspector (QCI) in writing. The designated QCI will perform inspections of completed work as soon as possible to ensure that the work meets contract specifications. The inspection schedule will depend on the type of work being completed; items of a routine nature will be inspected based on a random or planned sampling schedule. 100% of unusual items, items which are more important, or highly visible items will be inspected.
Allowable reject levels for all items of work will be zero.
Upon discovery of any deficiency, corrective action will be initiated immediately. The QCI will immediately either correct the deficiency personally, direct another employee to correct the deficiency, or direct the employee who marked the item as ‘complete’ to correct the deficiency. The QCI will meet with the employee who was responsible for initial completion of the work and review contract specifications for the work which was inadequately performed.
The QCI will determine what actions caused the inadequate work and take immediate steps to ensure that the work is correctly performed the next time it is scheduled.
A Quality Control Inspection Report will be completed by the QCI for each day’s work. This report will document what work was completed, what facilities were inspected, the time the inspections were performed, and the results of these inspections. This report will also document any deficiencies noted during inspections and corrective actions taken on deficiencies. This report will be provided to the Corps of Engineers the same day the work is scheduled, or the next morning prior to 9:00 a.m. by e-mail, fax, or in person.
If a Contract Discrepancy Report (CDR) is issued by the government, the Contractor will review the CDR with the QCI within one day of receipt of the CDR and will meet with the Corps of Engineers representative as soon as possible. Prior to meeting with the Corps representative, the Contractor will meet with the QCI and the individual/crew responsible for completing the work to determine the cause of the contract discrepancy and what actions will be required to prevent any reoccurrence. The Contractor will document these actions on the CDR for submittal to the government.
The contractor will modify these procedures as required to ensure that contract specifications are met.
File details come from the government source that posted it. Updated .