Exhibit_E-_ITB_20-2025_Excel_Price_Submission_Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Emergency Pump Connection State and local contract opportunity
- Solicitation number
- 20-25
- Issued by
- Volusia County, Florida
About this file
This document is an Excel Price Submission Sheet (Exhibit E) for Invitation to Bid (ITB) 20-25 issued by the City of DeBary, Florida, for an Emergency Pump Connection project located at Benson Junction Road and Highway 17/92. The bid encompasses a comprehensive set of construction and infrastructure tasks, including mobilization, maintenance of traffic, sediment barrier installation, clearing and grubbing, concrete sidewalk construction, turf restoration, and a specialized portable pump connection installation. The project involves core drilling an existing drainage concrete inlet structure, installing ductile iron pipes, implementing control valves, and preparing utility coordination for the emergency pump connection.
The bid price sheet includes eight distinct pay items with zero-dollar unit prices at the time of document creation, covering activities such as portable pump connection (which involves multiple sub-tasks like pipe installation, coupling preparation, and painting) and utility coordination (including soft dig investigations and utility location confirmation). The bid requires detailed submittals for materials, pipe specifications, and coordination with the City Engineer to finalize horizontal and vertical alignments of proposed infrastructure components. While specific pricing is not yet populated, the document provides a structured framework for contractors to propose their pricing for each required task and component of the emergency pump connection project.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 20-25_-_Emergency_Pump_Notice_of_Cancellation.pdf | ||
| 20-25_-_Emergency_Pump_Connection.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Exhibit E City of DeBary Bid Price Sheet
| Bid Title: | ITB 20-25 - Emergency Pump Connection | ||||
| Contractor Name: | |||||
| Directions - REFER TO PAY ITEM NOTES BELOW for BENSON JUNCTION ROAD AT HIGHWAY 17/92 | |||||
| Pay Item # | Description | Unit of Measure | Estimated Quantity | Unit Price | Extended Price |
| 101-1 | Mobilization | LS | 1 | $ - 0 | |
| 102-1 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 104-13 | Sediment Barrier - Staked Silt Fence | LF | 100 | $ - 0 | |
| 110-1 | Clearing and Grubbing - Includes removal of concrete sidewalk and disposal | LS | 1 | $ - 0 | |
| 522-2 | 6" Concrete Sidewalk | SY | 12 | $ - 0 | |
| 570-1-2 | Performance Turf, Sod - Bahia | SY | 24 | $ - 0 | |
| U-1 | Portable Pump Connection - Complete - Pay Item Note No. 1 | LS | 1 | $ - 0 | |
| U-2 | Utility Coordination - Pay Item Note No. 2 | LS | 1 | $ - 0 | |
| Total Bid | |||||
| PAY ITEM NOTES U-1 - PORTABLE PUMP CONNECTION | |||||
| Pay Item Note No. 1 - Portable Pump Connection includes the following work items; | |||||
| 1 | Core Drill opening in exsiting drainage concrete inlet structure for insertion of 12" Ductile Iron Pipe into drainage inlet. | ||||
| 2 | Install 20 LF of 12" Diameter Ductile Iron Pipe as shown. | ||||
| 3 | Submit material proposed for closure and sealing of the annular space in the wall of the inlet for approval. | ||||
| 4 | Install Control Valve according to Valve and Box Detail | ||||
| 5 | Submittals Required for Pipe, Fittings, Connectors, Valves | ||||
| 6 | Install 10" Diameter Ductile Iron Pipe Riser | ||||
| 7 | Install Portable Pump Connection - manifold with two pump connections - south end 8" Bauer Coupling with dust plug - north end 6" Camlock coupling with dust plug. Submittals are required. | ||||
| 8 | All exposed ductile iron pipe shall be painted white. | ||||
| PAY ITEM NOTES U-2 - UTILITY COORDINATION | |||||
| Pay Item Note No. 2 - Utility Coordination includes the following work items; | |||||
| 9 | Soft Digs shall be completed prior to all Submittals. Locate all existing utilities within proposed pipe alignment. Prior to core drilling - confirm with City Engineer the final horizontal and vertical alignment of the proposed 12" diameter Ductile Iron Pipe, the manifold and the location of the control valve and valve box. |