This document is an Exhibit D containing the revised Special Requirements for the DCAA Hawaii Sub Office. The key details are:
The document outlines the agency's specific space and technical requirements for the DCAA Hawaii Sub Office, including the need for 1 private office, 4 open area workstations, a telecom closet, conference rooms, break room, file storage, and other support spaces. It details the required specifications for security systems, telecommunications, electrical, and finishes. The document also specifies the furniture and equipment to be provided by DCAA. The related federal contract opportunity is Solicitation Number 9HI2119-2 issued by the General Services Administration's Public Buildings Service Region 9 for approximately 1,800 USF of office space in Honolulu, HI.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CMF 110.4 April 25, 2024
MEMORANDUM FOR ROY OSHITA – 9PRC
SUBJECT: Revised Special Requirements for DCAA Hawaii Sub Office
PROJECT TEAM
DCAA Name Email Phone
Project Manager: Stewart C. Niblack stewart.c.niblack.civ@mail.mil 1-571-448-4602
Branch Manager: Terry Allen terry.l.allen44.civ@mail.mil 1-571-448-3904
Admin Supervisor: Laura Nunez laura.e.nunez2.civ@mail.mil 1-571-448-3905
IT POC: Steve Mosonyi stephen.k.mosonyi.civ@mail.mil 1-571-448-8114
HQ Property Zone: Richard Griego richard.r.griego.civ@mail.mil 1-571-448-7782
Office Property POC: Tim Lee timothy.s.lee32.civ@mail.mil, 1-571-448-4364
GSA
Realty Specialist: Cheryl Nolting cheryl.nolting@gsa.gov 1-808-551-8347
Leasing Specialist: Roy Oshita roy.oshita@gsa.gov 1-412-419-1567
A. GENERAL OFFICE REQUIREMENTS
QUANTITY
1. Private Offices: 1 @ 140 Sq. Ft.
2. Open Area System Furniture: 4 @ (6’x8’) 48 Sq. Ft.
3. Telecom Closet 1 @ 100 Sq. Ft.
4. Small Conference Rooms 1 @ 150 Sq. Ft.
5. Break Room 1 @ 300 Sq. Ft.
**Includes Paper Towel and Soap Dispensers and Lessor fills daily
6. Touch Down Room 1 @ 100 Sq. Ft.
7. Wellness Room 1 @ 80 Sq. Ft.
**Includes Paper Towel and Soap Dispensers and Lessor fills daily
8. File Storage 1 @ 200 Sq. Ft.
9. Reception Area 1 @ 100 Sq. Ft.
10. Additional Information on Private Office Areas and Conference/Training Rooms:
▪ Sound Transmission Class (STC) 45-50 sound-proof Insulation to be installed above all private offices and conference rooms.
▪ All demising walls will be slab to slab.
▪ Janitorial Service Time: Between 8:30 am and 3:00 pm.
▪ Handicap Door Openers need to be installed on bathroom entrances and the DCAA front entrance door or similar.
▪ The planning guidelines emphasize the importance of bringing natural light into the space and providing open spaces by placing workstations on the building perimeter; office and
DEFENSE CONTRACT AUDIT AGENCY
DEPARTMENT OF DEFENSE
8725 JOHN J. KINGMAN ROAD, SUITE 2135
FORT BELVOIR, VA 22060-6219
I N R E P L Y
Exhibit D mailto:stewart.c.niblack.civ@mail.mil mailto:terry.l.allen44.civ@mail.mil mailto:laura.e.nunez2.civ@mail.mil mailto:stephen.k.mosonyi.civ@mail.mil mailto:richard.r.griego.civ@mail.mil mailto:timothy.s.lee32.civ@mail.mil mailto:cheryl.nolting@gsa.gov mailto:roy.oshita@gsa.gov
Requirements for DCAA Hawaii Sub-Office support workstations on the interior; and allowing for a clear circulation path. The planning guidelines provide a simple methodology to organize space.
▪ If overtime utilities are required, they will be included in the lease.
B. ENTRANCE DOORS
1. GSA General Contractor will install ADA door opener on main entrance door, electric strike and anti-pry plate on all doors that enter into the common area of the building. (All electric strikes will be the Power Fail-Secure type).
2. DCAA Contractor will install a Card Reader Access System (Locations TBD at DID).
3. Dead bolt to be installed on main entrance door.
C. SECURITY REQUIREMENTS
1. Total Door Locks: Schlage Mortise type lock, not cylindrical. Small format interchangeable core
SFIC. Restricted keyway. TBD after DID Workshop. Each room keyed different with four (4) master keys for all doors:
• Telco/Security Closet
• Private offices
• One (1) Large, medium, or small conference (Locations TBD at DID)
• Wellness room with occupancy lock indicator
• Add peephole to the back door and conference room with lock that are City ADA compliant.
• Main entrance door with bolt lock
2. DCAA Contractor will purchase and install AiPhone that will be installed at entrance to suite. Ai phone will provide an intercom and monitor at two (2) different locations in the office with a release button to let visitors into the suite. One (1) monitor at reception desk and one (1) secondary in location (TBD at DID)
3. Lessor Contractor to install electric strike and anti-pry plate compatible with the Ai phone System.
Electric strike recommended is RCI Rutherford Fail Secure F21649 (fire rated).
4. Lessor Contractor responsible for 1.25-inch conduit and pull strings for all low voltage requirements which includes, but not limited to security, Ai phone, network, and Card Readers.
5. DCAA Contractor will install an alarm system with motion detectors and to be monitored by Federal
Protective Service (FPS) Mega Center. Recommend: Most up-to-date model Honeywell/Ademco, Bosch/Radionics, or Digital Monitoring Products (DMP) are to be used to meet Federal Protective
Requirements in FPS MAR Document. (TBD at DID)
6. Lessor Contractor responsible for the electrical for security in telco closet. Four (4) dedicated quad outlet near backer board and two (2) duplexes on other walls.
D. TELCO CLOSET CONSTRUCTION
1. DCAA heat load is 3078.5 BTU. Separate zone and own thermostat that maintains temperatures between 68 - 75 degrees, not to exceed 60% humidity. The door to this space will have a louver to accommodate air circulation.
2. Plywood board 1/2” fire retardant, between 4 to 8 feet (installed vertically).
Exhibit D
3. Lessor Contractor responsible for the electrical for security in telco closet. Four (4) dedicated quad outlets installed near backer board installed at 72” above finished floor (AFF) near backer board.
and two (2) duplexes on opposite walls.
4. Entrance to room will have Card Access System
5. Card Access System will require pull strings and 1.25-inch conduit will be required by Lessor
Contractor inside Telco Closet and entry door and install electrical strike.
6. Commercial Grade Antistatic Vinyl Composite Tile (VCT) flooring required Tarkett Microtone
Rainstorm LB9 or alike.
7. DCAA will supply rack for equipment.
E. MULTIFUNCTION / CONFERENCE ROOMS
One (1) SMALL CONFERENCE TRAINING / BREAK OUT ROOMS
1. Reinforce wall for up to 65” HDMI TV in conference wall.
2. Lessor Contractor to provide stubbing and strikes as required for audio visual requirements and provide all electrical 1.25-inch conduit needed.
3. Lessor Contractor to Core drill for Conference Room table or provide OFR (Over Floor Raceway)
4. Lessor Contractor provides ridged sealed 1.25-inch conduit below floor core into floor mount monument.
5. 1.25-inch continuous conduit from TV HDMI outlet 66” AFF to HDMI floor core with pull strings.
6. Commercial Grade carpet tiles
F. BREAK ROOM
1. Luxury vinyl tiled floor
2. Deep bowl double sink
3. Hot and cold running water with a goose neck retractable sprayer faucet
4. Kitchen cabinets length (between 6’ to 8’) are required above and below.
5. One (1) upper cabinet to be height adjusted for coffee pot.
6. Counter is solid surface material (such as Corian) with white subway tiled backsplash (3x6) to upper cabinet with white grout.
7. Waterline hookups for DCAA furnished refrigerators with ice maker.
8. Opening for refrigerator must be minimum of 40” wide (no upper cabinet above)
9. Microwave, refrigerator, and coffee pot provided by DCAA.
10. Lessor Contractor to install dedicated 110V Outlets for microwave, coffee pot and refrigerator.
11. Entrance door(s) to break room should be half glass.
G. FILE STORAGE ROOM
1. One (1) – Dedicated duplex for 2’ Shredder
2. One (1) – Dedicated duplex for 6’ Copier
3. Commercial vinyl tiled floor same as breakroom
H. TOUCH DOWN ROOM
1. Electrical outlet – 1 at 18” AFF and 1 at 32” AFF where table will be placed.
2. Commercial Grade carpet tiles
I. WELLNESS ROOM
1. Solid surface counter (such as Corian), same as breakroom, with intergraded 4” backsplash with lower cabinets. Cabinet and countertops stop at mini refrigerator.
2. Hot and Cold Running Water
3. Small Sink with retractable goose neck faucet
4. Electrical duplex for mini refrigerator
5. Opening for mini refrigerator should be 24” wide and 34” height.
6. Lower cabinets and counter should be at least 4’ – 6’ in length.
7. Commercial vinyl tiled floor same as breakroom
8. One (1) duplex outlet above countertop and two (2) additional electrical outlets on opposite walls
J. MULTI-FUNCATION PRINTER/COPIER REQUIREMENTS
1. One (1) 110v, 20 Amp outlets for Multi-Function Devices (MFDs).
2. Lessor Contractor to provide 1.25-inch conduit and pull strings for MFD locations.
3. Location based on final Floor Plan during DID Workshop
K. HDMI REQUIREMENTS
1. HDMI Drops are CAT 6 plenum or better with 25” of extra cable above wireless access points.
2. Low Voltage wiring for HDMI cabling will be discussed during DID.
3. Lessor Contractor will install all required 1.25-inch conduit and pull strings for all low voltage wiring locations for HDMI cabling.
4. DCAA Contractor will install Wi-Fi access points in ceiling (Locations TBD at DID)
5. DCAA Contractor will install low voltage lines in suite: phone lines one (1) security, and one (1)
MFPs. (locations TBD at DID)
6. DCAA IT Contractor will have the Service Provider run the lines from the building demarcation room to DCAA suite.
L. ELECTRICAL REQUIREMENTS:
1. System Furniture – install electrical whips provided by furniture vendor – placement based on
Furniture Vendor’s drawings. Lessor contractor to be on site to connect whips to furniture during furniture installation.
2. Power requirement for System Furniture: 4-Circuit (2+2, 3+1) 8-wire system
3. Private Offices – QUAD OUTLET – 110V outlets on wall of furniture and additional duplexes based on DID and Furniture Vendor’s drawings.
4. Conference table – provide electrical to conference tables – Based on final furniture layout.
5. One (1) Shredder: in Supply room – dedicated 110V outlets
6. Telco Closet – four (4) or more dedicated quad outlets and two (2) dedicated duplex outlets based on attached layout, one (1) for LAN/UPS, and Security Requirements (DCAA will provide standard layout)
7. One (1) MFD Copiers – dedicated 110V duplex.
8. Electric outlets for TV/Monitor in conference rooms are at 66” Above Finished Floor (AFF)
9. Electric outlets are at 18” AFF or unless otherwise specified.
10. Thermostats should not be placed behind system furniture.
11. All electrical outlets, switches and face plates should be white.
12. Convenience outlets throughout common area
13. Light switches to have dimming capability.
M. DOORS
▪ Perimeter and Interior Doors: Solid Core with Metal Frame (no pre-hung door). No window in door unless otherwise specified. Door color to match Sedona Cherry
Laminate.
N. MISCELLANEOUS:
Warehouse Storage: None
Generator: None
Janitorial Service Time: Between 8:30 am and 3:00 pm (M-F).
Window Blinds: Building standard required on all windows.
Main Door Signage: Yes
Outdoor Signage: None
Carpet: Carpet Tile (included one (1) box of carpet tile left at completion of project)
O. FURNITURE REQUIREMENTS
1. Provided by DCAA through purchase order.
2. Lessor Contractor responsible for installing furnished electrical whips for system furniture.
3. Lessor Contractor provides any flooring cores that may be required or power poles, depending on the specifics of the project and the building DCAA will occupy.