EXHIBIT-CDRL.pdf

PDF 205 KB Posted

Attached to
Remanufacture of B-52, KC-135, E-3, E-6 and E-8 Fuel Pumps
Solicitation number
FD20301903054
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision oflaw, no person shall be subject to any penalty for failing to comply with a collection of information ifit does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001-0004, 1001-1004, 2001-2004, 3001-3004, 4001-4004

B.EXHIBIT

A, B, C, D and E

C.CATEGORY

TDP TM OTHER X

D. SYSTEM I ITEM E. CONTRACT I PR NO. F. CONTRACTOR

Multiple Systems / Multiple Items FD20301903054

1.DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A00l, B001, C001, D001 and E001 Commercial Asset Visibility (CA V) Reporting CFM End Item Reporting

4. AUT HORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81838 See Block 16 423 SCMS/GUMC

7.DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQUIRED SUBMISSION

LT NIA See Block 16 Seee Block 16 b. COPIES

8.APP CODE 11.AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE

SUBMISSION Final Draft

A See Block 16 See Block 16 Reg Repro

16.REMARKS See Block 16 0 1 0

NAME: Zilar, Dale N DATE: 01 JUN 2020 15. TOTAL 0 1 0

TIDS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS and CA V AF Reporting Requirements Document.

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CA V AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IA W the CA V AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CA V AF using the CA V AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WA WF) website address: https://wawfeb.mil, using DODAAC F A8251. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: Mychael.Holford@us.af.mil

COORDINATORS:

Holford, Mychael A 423 SCMS / GUMC 405-734-8284 / 884-8284 01 JUN 2020

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

Zilar, Dale N 01 JUN 2020 //DIGITALLY SIGNED// 01 JUN 2020

424 SCMS I GUBAB ZILAR.DALE.N.1221047407

405-736-7976 424 SCMS I GUBAB 405-736-7976 I 336-7976

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001 Generated by PRPS using Jasper Reports on 04 Jun 2020 Version 1 Page 1 of4

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

0MB No. 0704-0188

A. CONTRACT LINE ITEM NO.

0001- 0004, 1001-1004, 2001-2004, 3001-3004, 4001- 4004

D. SYSTEM I ITEM

Multiple Systems / Multiple Items

1. DATA ITEM NO.

A002, B002, C002, D002 and E002

4. AUTHORITY (Data Acquisition Document No.)

DI-PSSS-81995

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

B. EXHIBIT

A, B, C, D and E

C. CATEGORY

IDP TM

E. CONTRACT I PR NO.

FD20301903054

F. CONTRACTOR

2. TITLE OF DATA ITEM 3. SUBTITLE

OTHER X

Contract Depot Maintenance (CDM) Production Report CDM Production Monthly Status Report

6. REQUIRING OFFICE5. CONTRACT REFERENCE

SOW 423 SCMS/GUMC

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT D

10. FREQUENCY

MTHLY See Block 16 b. COPIES

8. APP CODE

NIA

16. REMARKS

NAME: Zilar, Dale N

11. AS OF DATE

See Block 16

DATE: 01 JUN 2020

TIDS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CA V AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. (5 May 2020) Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IA W provisions ofDoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

Mychael.Holford@us.af.mil

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001 Generated by PRPS using Jasper Reports on 04 Jun 2020

a. ADDRESSEE

Final Draft

Reg Repro

See Block 16 0 1 0

15. TOTAL 0 1 0

Version 1 Page 2 of4

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

0MB No. 0704-0188

COORDINATORS:

Holford, Mychael A

G. PREPARED BY

Zilar, Dale N

424 SCMS I GUBAB

405-736-7976

A. CONTRACT LINE ITEM NO.

0001- 0004, 1001-1004, 2001-2004, 3001-3004, 4001- 4004

D. SYSTEM I ITEM

Multiple Systems / Multiple Items

423 SCMS / GUMC 405-734-8284 / 884-8284 01 JUN 2020

H. DATE

01 JUN 2020

B. EXHIBIT

A, B, C, D and E

E. CONTRACT I PR NO.

FD20301903054

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS I GUBAB 405-736-7976 I 336-7976

C. CATEGORY

TDP TM

F. CONTRACTOR

3. SUBTITLE

J. DATE

01 JUN 2020

OTHER X

1. DATA ITEM NO.

A003, B003, C003, D003 and E003

2. TITLE OF DATA ITEM

Government Property Inventory Report Annual Government Property Physical Inventory Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441C

5. CONTRACT REFERENCE

SOW

6. REQUIRING OFFICE

423 SCMS/GUMC

7. DD 250 REQ

LT

8. APP CODE

NIA

16. REMARKS

NAME: Zilar, Dale N

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

DATE: 01 JUN 2020

TIDS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4: All reports shall be submitted in the English Language.

2. Blocks 10, 11, 12, 13:

a. This report will be provided annually. Reporting Period is one year.

b. The data is representative of the Contractor's Internal Property Control

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

System and shall be current as of the last day of the annual reporting period. Ifrequested outside of an annual cadence, the data shall be current as of the date requested.

c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

3. Block 9:

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. (18 May 2020) Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties. Disseminate IA W provisions ofDoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter Vl. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:

Mychael.Holford@us.af.mil

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1, FEB 2001 Generated by PRPS using Jasper Reports on 04 Jun 2020

14. DISTRIBUTION

a. ADDRESSEE

See Block 16

15. TOTAL

Version 1

b. COPIES

Final Draft

Reg Repro

0 0

0 0

Page 3 of4

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

COORDINATORS:

Holford, Mychael A 423 SCMS / GUMC 405-734-8284 / 884-8284 01 JUN2020

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

Zilar, Dale N 01 JUN2020 //DIGITALLY SIGNED// 01 JUN2020

424 SCMS I GUBAB ZILAR.DALE.N.1221047407

405-736-7976 424 SCMS I GUBAB 405-736-7976 I 336-7976

A. CONTRACT LINE ITEM NO.

0001- 0004 ,1001-1004 ,2001-2004 , 3001-3004 and4001- 4004

B.EXHIBIT

A, B, C, D, and E

C.CATEGORY

TDP TM OTHER X

D. SYSTEM I ITEM E. CONTRACT I PR NO. F. CONTRACTOR

Multiple Systems / Multiple Items FD20301903054

1 .DATA ITEM NO. 2 . TITLE OF DATA ITEM 3 . SUBTITLE

A004 , B004 , C004 , D004 , and E004

Production Surge Plan Capability Analysis Plan (CAP)

4 . AUTHORITY (Data Acquisition Document No.) 6 . REQUIRING OFFICE

DI- MGMT-80969

5 . CONTRACT REFERENCE

SOW 423 SCMS/GUMC

7 .DD250 REQ 9 . DIST STATEMENT 10 . FREQUENCY 12 . DATE OF FIRST 14 . DISTRIBUTION

REQUIRED SUBMISSION

LT A See Block 16 See Block 16 b. COPIES

8 .APP CODE 11 .AS OF DATE 13 . DATE OF SUBSEQUENT a. ADDRESSEE

SUBMISSION Final Draft

A See Block 16 See Block 16 Reg Repro

16 .REMARKS 423 SCMS/GUMC 0 1 0

NAME: Zilar, Dale N DATE: 01 JUN2020 3001 Staff Drive, Annex 4 , Suite 1 AC4 l00 B

TIDS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS. Tinker Air Force Base, Oklahoma 73145-3033

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or Attention : Mychael A.

a national emergency (also known as surge, reference DF ARs 217 .208-70 and DF ARs 252 .217 .7001 ), and invokes Holford surge: The Contractor is willing to work to meet and sustain this demand for 15 . TOTAL 0 1 0 quantity levels above and beyond normal peacetime requirements.

Block 9 : Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

(9 March 2020 )

Block 10 , 11 , 12 , 13 : The Capability Analysis Plan (CAP) shall be prepared IA W DI- MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

COORDINATORS:

Holford, Mychael A 423 SCMS / GUMC 405-734-8284 / 884-8284 01 JUN2020

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

Zilar, Dale N 01 JUN2020 //DIGITALLY SIGNED// 01 JUN2020

424 SCMS I GUBAB ZILAR.DALE.N.1221047407

405-736-7976 424 SCMS I GUBAB 405-736-7976 I 336-7976

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1 , FEB 2001 Generated by PRPS using Jasper Reports on 04 Jun 2020 Version 1 Page4 of4

File details come from the government source that posted it. Updated .