EXHIBIT C Geotechnical Report.pdf
PDF 6 MB Posted
- Solicitation number
- PE-63100-NONST-2027-000000105
- Issued by
- Clayton County, Georgia
About this file
This is a Geotechnical Engineering and Subsurface Investigation Report prepared by Accura Engineering and Consulting Services, Inc. for the Clayton County Administration Center Building Relocation project located in Jonesboro, Clayton County, Georgia. The project involves the development of approximately 19 acres of undeveloped wooded land at the intersection of Tara Boulevard and Old Poston Road for a four-story wood-framed administrative building with concrete slab on grade, surface parking, and drive aisles. The geotechnical exploration program, completed in May 2023, consisted of eleven Standard Penetration Test (SPT) borings (A-1 through A-6 for the building area and P-1 through P-5 for parking areas), two infiltration test borings (I-1 and I-2), and review of six previous borings (B-1 through B-6) conducted by NOVA in November 2022. The project includes proposed finished floor elevations at 900 feet with anticipated cuts and fills of approximately 7 feet and 3 feet respectively, and structural column loads ranging from 280 to 400 kips.
The geotechnical investigation identified subsurface conditions consisting of fill materials (3 to 13 feet deep) overlying residual Piedmont soils of sandy silts and silty sands with varying consistency. No partially weathered rock or bedrock was encountered in the borings. Groundwater was encountered at depths ranging from 12 to 37 feet below existing grade. Based on the soil conditions and structural loads, the report recommends use of a properly designed and installed compacted aggregate pier system (Geopiers or Vibro-piers) rather than conventional shallow foundations, with anticipated allowable bearing pressures of 5,000 to 6,000 psf and total settlements of 1 inch or less. Additional recommendations include flexible pavement sections for light-duty parking (1.5 inches asphalt wearing surface, 2 inches binder course, 6 inches aggregate base) and medium-duty areas (2 inches wearing surface, 2 inches binder course, 8 inches aggregate base), with a Design CBR value of 4. The site seismic classification is Site Class D, or Site Class C if aggregate piers are installed. The report emphasizes the need for geotechnical engineering oversight during construction, contingency budgeting for potential soft soils or unsuitable materials encountered during grading, and careful site preparation including proofrolling and removal of deleterious materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT A _ Bid Specifications.pdf | ||
| ITB _26_171 FINAL.pdf | ||
| EXHIBIT B General Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACCURA
GEOTECHNICAL ENGINEERING AND SUBSURFACE INVESTIGATION REPORT
Clayton County Administration Center Building Relocation Jonesboro, Clayton County, Georgia
Submitted to:
NELSON WORLDWIDE, LLC
Attn: Claudia Haines
Senior Project Manager 5200 Avalon Boulevard Alpharetta, GA 30009
Submitted by:
Accura Engineering and Consulting Services, Inc.
3200 Presidential Drive Atlanta, GA 30340
May 2023
Subsurface Exploration and Geotechnical Engineering Services May 8, 2023 Clayton County Administrative Center Building Relocation
3200 Presidential Drive Atlanta, Georgia 30340 Phone: 404.241.8722 Fax: 404.241.4577
TABLE OF CONTENTS
SECTION PAGE
1.0 EXECUTIVE SUMMARY
2.0 BACKGROUND
3.0 SITE LOCATION AND DESCRIPTION
4.0 PROJECT INFORMATION
5.0 PURPOSE & SCOPE OF SERVICE
6.0 EXPLORATION PROCEDURES
7.0 REGIONAL GEOLOGY
8.0 USDA SOIL SURVEY
9.0 SUBSURFACE CONDITIONS
9.1 Proposed Building
9.2 Proposed Surface drive aisle and parking lots
9.3 Auger Boring (Infiltration Test Area)
10.0 LABORATORY TESTING PROGRAM
11.0 DESIGN RECOMMENDATIONS
11.1 General
11.2 Foundation Design Recommendations
11.3 Ground Floor Slabs
11.4 Pavement Section Recommendations
11.5 Seismic Design Criteria
11.6 Stormwater Runoff
11.7 Retaining Walls-Cast-In-Place Concrete
11.8 Retaining Walls-MSE
12.0 CONSTRUCTION RECOMMENDATIONS
12.1 General
12.2 Existing Fill Considerations
12.3 Site Preparation
12.4 Structural Fill Placement and Compaction
12.5 Surface Water Control
12.6 Groundwater Conditions
12.7 Excavation Characteristics
12.8 Excavations
13.0 LIMITATIONS
APPENDICES
APPENDIX I
Site Vicinity Map (Drawing No. 01) Test Location Plan (Drawing No. 02)
Subsurface Profile-Building (Drawing No.03-01, Drawing No.03-02) Subsurface Profile-Parking Lot (Drawing No.03-03, Drawing No.03-04)
APPENDIX II
Current Boring Logs by Accura (A-1 through A-6, and P-1 through P-5) Previous Boring Logs by NOVA (B-1 through B-6)
Key to Soil Classification Soil Classification Chart
Infiltration Testing Logs (I-1 and I-2) Photographs of Site (12 pages) Laboratory Testing Results (8 pages) Laboratory Test Procedures
1.0 EXECUTIVE SUMMARY
This Executive Summary is provided as a brief overview of our geotechnical engineering evaluation for the project and is not intended to replace more detailed information contained elsewhere in this report. As an overview, this summary inherently omits details that could be very important to the proper application of the provided geotechnical design recommendations. This report should be read in its entirety prior to implementation into design and construction.
• Eleven (11) Standard Penetration Test (SPT) borings (designated A-1 through A-6, and P-1 through P-5) and two (2) infiltration test borings (designated I-1 and I-2) from current explorations by Accura, and six SPT borings (designated B-1 through B-6) from previous explorations by NOVA were drilled within the proposed development to determine the nature and condition of the subsurface soils, rock, groundwater, and infiltration rate.
• The current and previous borings generally encountered fill soils to depths ranging from about 3 to 13 feet from the ground surface. Most of the fill generally appeared to be relatively clean, however, the fill was highly variable in consistencies, with occasional zones of very soft soils. Below the fill, borings encountered loose to medium dense silty SAND (SM) or very soft to very stiff sandy SILT (ML) consistency residual soils within the proposed project site. Based on the provided finished floor elevations (FFEs=900 feet), most of the existing fill soils within the proposed structures will remain. Contingency funds shall be budgeted during construction.
• No partially weathered rock (PWR) or rock was encountered in the current and previous borings. Difficult excavation conditions associated with PWR, or rock excavation are not generally expected in the areas explored.
• Due to the varying soil consistencies within the planned building structure footprint, and the provided structural loads (280 to 400 kips), conventional shallow foundations bearing in soil are not recommended for support of the proposed building due to the potential for abrupt or excessive differential settlement. Accura recommends that the use of a properly designed and installed compacted aggregate pier system (Geopiers or Vibro-piers) would be a lower risk alternative to conventional shallow foundations bearing in soil.
• Groundwater was encountered in the borings ranging from 12 to 37 feet after completion of drilling below the existing grade within the overall site. Based on the anticipated finished grade elevation, shallow groundwater should not be a significant concern during mass grading.
• From the average Standard Penetration Test N-values obtained and the International Building Code Section 1613 criteria for seismic site classification, the subsurface conditions at the project site correspond most closely with those of Site Classification “D”. If the site is improved using aggregate piers for the proposed building, we recommend a Site Class “C” be used.
• Soil parameters for various earth retaining structures have been presented in the body of the report.
2.0 BACKGROUND
Accura Engineering and Consulting was provided with a preliminary geotechnical engineering report by NOVA, dated November 18, 2022, for Clayton County Administrative Center Building Relocation for a tract of land of approximately 19-acres.
The previous exploration included 6 SPT borings, designated as B-1 through B-6. These borings are included in the Appendix and were used as part of our geotechnical evaluation.
3.0 SITE LOCATION AND DESCRIPTION
The project site consisted of approximately 19-acres of undeveloped wooded land located in the northwest quadrant of the intersection between Tara Boulevard and Old Poston Road in Jonesboro, Clayton County, Georgia. More specifically, the site is an irregularly configured parcel, bounded on the north by undeveloped property and wooded area, the west by Poston Road, the south by Old Poston Road, and the east by Tara Boulevard. The client provided a site plan, via-email dated March 3, 2023, showing the proposed building and surface parking locations. This site plan was used as a guide to locate the boundaries of the project site and to estimate the topographic elevations at the site. The locations of the project site and borings are shown on the attached Test Location plan (Drawing No. 02). At the time of our fieldwork, the project site was accessed via a dirt path entrance off of Poston Road to the west of the project site.
Existing overhead power, water lines, gas lines, fiber cable, and fire hydrants were identified surrounding the proposed development. An existing creek that flows from the east to west was located on the southern portion area of the project site, also.
Project surroundings are shown on the attached Site Vicinity Map in Appendix I, Drawing No. 01.
Based on our visual observations, the topography at the site generally sloped down from northern area of the site to the southern areas of the site. We understand that the site layout and grading plans have not been finalized. Based on the spot elevation on the existing ground within the area of the site by obtaining GPS unit, the elevations at the project site varies from a high of 910 msl to a low of 893 msl. Total relief across the site is approximately 17 feet.
Based on provided preliminary finished floor elevations (FFEs=900 feet), visual observation of the site and surrounding areas, we estimate that the cuts and fills will be
7 feet and 3 feet or less within the area of the building, and the parking and drive areas, respectively.
If the actual loads and grading information differs from these anticipated values, Accura Engineering and Consulting should be notified to determine if modifications to our recommendations are warranted.
4.0 PROJECT INFORMATION
Project information was provided to Accura by email from you on March 3, 2023. We understand that the proposed development will consist of the Clayton County Administrative Center Building Relocation that includes a four-story building on the northeastern areas of the site along the Tara Boulevard, and the building will be wood framed with concrete slab on grade. Surface drive aisle and parking lots will be constructed with the main entrance connecting to Old Poston Road. Potential retaining walls (concrete and MSE) are also planned as part of the construction.
Based on the loading information provided from structure engineer, Mrs. Jessica McDonald, senior structural engineer with Shear Structural, the proposed building structures will have column loads on the order of 280-400 kips.
The following table summarizes the information on the proposed structures.
TABLE 4.1: SUMMARY OF PROPOSED STRUCTURES INFORMATION
Structure
Existing Ground
Elevation (ft.)
Finished Floor
Elevations (ft.)
Estimated Cut / Fill
(ft.)
Column Loads kips
Proposed Building
897-907
7/3
280-400
We anticipate cuts and fills ranging up to about 7 feet and 3 feet for mass grading within the above areas, respectively.
If the actual loads and grading information differs from these anticipated values, Accura Engineering and Consulting should be notified to determine if modifications to our recommendations are warranted.
A geotechnical exploration was performed to provide information regarding the site and information for design of foundations and floor slabs for the project.
5.0 PURPOSE & SCOPE OF SERVICE
Accura Engineering and Consulting was involved within the proposed development along the Tara Boulevard in Jonesboro, Clayton County, Georgia: to 1) provide general descriptions of the subsurface soil, rock and groundwater conditions at the site, 2) provide foundation and floor slab design recommendations, 3) provide pavement section design recommendations for the planned parking and drive areas, 4) provide soil parameter for the potential concrete and MSE retaining walls for the design team, 5) determine an average infiltration rate for the project site, and 6) comment on the site development aspects of the proposed construction related to cut and fill across the area to be developed. In order to accomplish these objectives, we undertook the following scope of services:
• Visited the site to observe existing surface conditions and marked the proposed boring locations.
• Coordinated underground utility clearance with 811 and a private utility locating company in order to expedite the drilling schedule.
• Reviewed and summarized readily available geologic and subsurface information relative to the project site and using hand-held GPS equipment.
• Executed the subsurface exploration program consisting of six Standard Penetration Test (SPT) borings within the proposed building, five SPT borings within the planned surface drive aisle and parking lots, and conducted two in-field infiltration tests to determine Average Infiltration Rate for the project as shown on the attached Test Location Plan (Drawing No. 02). The borings in the building’s footprint each extended to termination depths ranging from 70 feet to 80 feet below the existing grade. The borings within the parking areas drilled to a depth of about 10 feet below the existing grade. Borings for the infiltration tests were augured to six feet below the existing grade.
• Representative samples, collected from the subsurface investigation, visually classified by a qualified member of our geotechnical staff. In addition, some of those samples subjected to soil index testing to assist in and verify the classifications, and for use in engineering analysis and design. We proposed four sets of tests that included Atterberg limits and water content testing to evaluate the plasticity of fine-grained soils (silts and clays), as well as No. 200 wash sieve analyses.
• Accura Engineering provided a soil seismic site class recommendation. This was based on the collected SPT data and extrapolated as needed for our evaluation.
Accura Engineering did not propose a 100-foot deep boring or shear wave velocity study.
• Recorded the groundwater elevations encountered after the completion of drilling.
• Performed geotechnical engineering analyses and provided recommendations for the design and construction of suitable foundation systems.
• Provided recommendations for design and construction of slab-on-grade floors.
• Performed geotechnical engineering analyses and provided recommendations for the design and construction of flexible and rigid pavements.
• Provided soil parameter recommendations for design and construction of potential retaining walls.
• Provided recommendations regarding the placement and compaction of fill materials required to achieve building pad or site grading.
• Prepared a written report summarizing our work on the project, providing descriptions of the subsurface conditions encountered, providing geotechnical recommendations in the areas outlined above, and discussing geotechnical related items to site work for the proposed construction. Boring location plans, boring logs, subsurface profiles, and laboratory test results are also included in this report.
Accura’s geotechnical services did not include development of quantity estimates, preparation of plans and specifications, or the identification and evaluation of wetlands or other environmental aspects of the project site.
6.0 EXPLORATION PROCEDURES
Eleven (11) SPT borings were drilled at the approximate locations indicated on the attached Test Location Plan (Drawing No. 02) provided in Appendix I. Borings A-1 through A-6 were drilled within the proposed building area to termination depths ranging from 70 feet to 80 feet, and borings P-1 through P-5 were drilled to respective depths of 10 feet within the planned surface drive aisle and parking lots. Borings I-1 and I-2 were augured to the termination depths of six feet for the infiltration test within the project site.
The SPT borings were performed in general accordance with ASTM D 1586. Soil samples obtained using the split spoon sampler were visually evaluated by the Project Engineer and classified according to the visual-manual procedure described in ASTM D 2488.
The boring locations were determined in the field by our engineering representative who measured distances and estimated angles with a measurement tape and a hand-held compass from existing site features. The approximate boring locations are indicated on the attached Test Location Plan (Drawing No. 02). The elevations on the logs were interpolated from the GPS surveying of boring locations performed by Accura within the area of the site and should be considered very approximate and subject to error. The borings were backfilled with auger cuttings upon completion of drilling.
7.0 REGIONAL GEOLOGY
The project site is located in the Piedmont physiographic province of Georgia, which is characterized by medium- to high-grade metamorphic rocks and scattered igneous intrusions. The metamorphic rocks comprising the Piedmont were formed when older “parent” rocks were subjected to high temperatures and/or pressures during regional metamorphism that occurred during the creation of the Appalachian Mountains. The same high temperatures and pressures also caused some “parent” rocks to fully melt and subsequently recrystallize as intrusive igneous rocks. The topography in the province is variable and ranges from gently rolling hills in the south to moderate to steep hills in the north.
The boundary between soil and rock is typically not sharply defined. A transitional zone termed partially weathered rock (PWR) is normally found overlying bedrock. Partially weathered rock is defined for engineering purposes as residual material that can be penetrated with soil drilling equipment, but which has a standard penetration resistance exceeding 100 blows per foot (bpf). Differential weathering of the parent rock has resulted in highly variable subsurface conditions over short horizontal distances. Lenses and boulders of hard rock and zones of partially weathered rock may be present within the soil above the general bedrock level. The upper surface of rock is irregular.
According to the Geologic Map of Georgia, the rock types underlying the project site have been mapped as Granite Gneiss and Amphibolite. This geologic formation typically consists of sandy silts and silty sands with varying mica content and, often, with lower consistencies partially due to the amphibolite.
8.0 USDA SOIL SURVEY
According to the Natural Resources Conservation Service (NRCS) Soil Survey of Clayton County, Georgia, primary soils in the project site are provided in the following table 8.1.
TABLE 8.1 – Summary of the Series Soils Within the Project Site
9.0 SUBSURFACE CONDITIONS
The subsurface conditions discussed in the following paragraphs and those shown on the attached boring logs represent an estimate of the subsurface conditions based on interpretation of the field using normally accepted geotechnical engineering judgments.
Given the spacing between boring locations, it is anticipated that subsurface conditions may vary between each boring location. Strata breaks designated on the boring logs represent approximate boundaries between soil types. The transitions between different soil strata are usually less distinct than those shown on the boring logs.
Although individual soil test borings are representative of the subsurface conditions at the boring locations on the dates shown, they are not necessarily indicative of
Map Unit
Symbol
Map Unit
Description
Properties
Soil Type
Hydrologic Soil
Group
Seasonal high groundwater table (in)
Slope
Drainage Class
Hydraulic Permeability
(in/hr)
AkA Altavista sandy loam
0 to 3 Moderately well drained
0.57 to 1.98 sandy clay C 18 to 30 inches
AmC Appling sandy loam
6 to 10 Well drained 0.57 to 1.98 Sandy clay B More than 80 inches
CeB Cecil sandy loam
2 to 6 Well drained 0.57 to 1.98 Sandy clay B More than 80 inches subsurface conditions at other locations or at other times. Data from the specific soil test borings are shown on the individual boring logs included in Appendix II.
9.1 Proposed Building
Borings A-1 through A-6 from current exploration and Borings B-1 through B-6 from previous exploration initially encountered 2 to 5 inches of topsoil and grass.
Existing Fill: Below the topsoil layer, the borings encountered fill soils to depths ranging from approximately 3 to 13 feet below existing grades. The fill soils encountered generally consisted of firm to very stiff sandy SILT (MH, ML) with the standard penetration resistances (N-values) in the fill ranged from 5 to 23 blows per foot (bpf) or loose to medium dense silty SAND (SM) with varying amounts of clay, rock fragments, and trace of mica with N-values ranged from 5 to 17 blows per foot (bpf).
Residual Soils: Residual soils typical of the Piedmont Physiographic Region were encountered below the fill in the borings A-1 through A-6 and borings B-1 through B-6.
The residual soils generally consisted of very soft to very stiff sandy SILT (ML) with Standard Penetration Test resistance (N-values) ranging from 2 to 26 blows per foot (bpf) or loose to medium dense silty SAND with varying amounts of mica, and trace of clay with Standard Penetration Test resistance (N-values) ranging from 6 to 25 blows per foot (bpf).
Partially Weathered Rock (PWR): No partially weathered rock (PWR) or rock was encountered in the current and previous borings. PWR is a term for the residuum that can be penetrated by soil drilling techniques and has standard penetration resistance values (N-values) in excess of 100 bpf.
Groundwater: Groundwater was encountered in borings A-1 through A-6, and B-1 through B-6 at depths ranging from 12 to 37 feet after completion of drilling.
9.2 Proposed Surface drive aisle and parking lots
Borings P-1 through P-5 drilled in the proposed Surface drive aisle and parking lots initially encountered 4 inches of topsoil layer.
Existing Fill: Below the topsoil layers, the borings encountered fill soils to depths ranging from approximately 3 to 10 feet below existing grades. The fill soils encountered generally consisted of loose to medium dense silty SAND (SM) with the standard penetration resistances (N-values) in the fill ranged from 5 to 18 blows per foot (bpf) or soft to stiff sandy SILT (ML) with traces of clay, mica, and rock fragments with N-values ranged from 4 to 15 blows per foot (bpf).
Residual Soils: Residual soils typical of the Piedmont Physiographic Region were encountered below the fill in borings P-1 through P-4. The residual soils generally consisted of loose silty SAND (SM) with traces of rock fragments, with Standard Penetration Test resistance (N-values) ranging from 8 to 9 blows per foot (bpf) or firm to very stiff sandy SILT (ML) with traces of clay and N-values ranging from 6 to 18 bpf.
Partially Weathered Rock (PWR): No partially weathered rock (PWR) or rock was encountered in the current and previous borings. PWR is a term for the residuum that can be penetrated by soil drilling techniques and has standard penetration resistance values (N-values) in excess of 100 bpf.
Groundwater: Groundwater was not encountered in borings P-1 through P-5 to the respective depths of 10 feet after completion of drilling.
Groundwater levels should be anticipated to fluctuate with the change of seasons, during periods of very low or high precipitation, or due to changes in the floodplain or watershed upstream from the area.
For a more precise description of the conditions encountered within the borings, please refer to the Boring Logs provided in The Appendix II.
9.3 Auger Boring (Infiltration Test Area)
Two straight auger borings I-1 and I-2 were drilled to a depth of six feet to conduct infiltration testing at the locations indicated on Test Boring Location Plan (Drawing No. 02).
Below the groundcover, the fill generally consisted of sandy SILT (MH,ML) or silty SAND (SM) with varying amounts of clay, and traces of mica and rock fragments.
The results of infiltration testing presented in Appendix II of this report is indicative of the infiltration rates that may be encountered near the test locations, but should not be considered as a guarantee of infiltration conditions. Minor changes in soil composition can cause significant differences in infiltration rates. The results of the infiltration testing are presented in Appendix II of this report. A factor of safety was not applied to the values presented in the infiltration logs.
10.0 LABORATORY TESTING PROGRAM
For geotechnical considerations, select split-spoon samples from four of the soil test borings were subjected to laboratory classification testing. This testing included water content determinations (ASTM D2216), No. 200 wash (ASTM D1148 without hydrometer), and Atterberg limits tests (ASTM D4318). Based on the results of these tests, the soil samples were then classified in general accordance with Unified Soil Classification System (ASTM D2487).
The results of the laboratory test are summarized in following Table 10.1, and are presented in Appendix II of this report:
Table 10.1- Soil Classification Test Summary
Boring No.
Sample Depth
(ft)
Water Content
Finer than
No. 200 Sieve
Atterberg Limits
USCS
Classification L.L. P.L. P.I.
A-1 4-6 19.8 51.4 56 32 24 MH
A-4 2-4 26.8 53.2 65 40 25 MH
A-4 23.5-25 39.5 22.3 NP NP NP SM
A-6 28.5-30 23.1 20.2 NP NP NP SM
NP= Non-Plastic
11.0 DESIGN RECOMMENDATIONS
11.1 General
The following findings and recommendations are based on our observations at the site, interpretation of the field obtained during our subsurface exploration, GPS surveying of boring locations performed by Accura, the finished floor elevations (FFEs=900 feet), and our experience with similar subsurface conditions and projects. Subsurface conditions in unexplored locations may vary from those encountered.
Determination of an appropriate foundation system for a given structure is dependent on the proposed structural loads, soil conditions, settlement, and construction constraints such as proximity to other structures, etc. The subsurface exploration aids the geotechnical engineer in determining the soil stratum appropriate for structural support. This determination includes considerations with regard to both allowable bearing capacity and compressibility of the soil strata. In addition, since the method of construction greatly affects the soils intended for structural support, consideration must be given to the implementation of suitable methods of site preparation, fill compaction, and other aspects of construction. Please refer to the Construction Recommendations included in Section 12 of this report.
11.2 Foundation Design Recommendations
Due to the varying soil consistencies within the planned building structure footprint (fill, residuum), and the provided structural loads (280 to 400 kips), conventional shallow foundations bearing in soil are not recommended for support of the proposed building due to the potential for abrupt or excessive differential settlement. Accura recommends that the use of a properly designed and installed compacted aggregate pier system (Geopiers or Vibro-piers) would be a lower risk alternative to conventional shallow foundations bearing in soil.
Geopiers and Vibropiers are proprietary ground improvement systems consisting of columns of compacted stone. Placement of Geopiers or Vibropiers involves using an auger (typically 24 inches to 30-inch diameter) to bore a hole to a desired depth. A layer of open-graded stone is then placed at the bottom of the hole and a tamper or vibrator is then inserted into the hole to work the stone into the soil at the base of the hole. This serves to prestress and densify the soil at the bottom of the cavity, creating a bulb of compacted soil and stone. Once this process is completed, an aggregate layer (typically #57 stone or crusher run) measuring approximately 12 inches thick is placed in the hole and densely compacted or vibrated with a specialized densification system. Additional layers of aggregate are inserted into the hole and compacted until the hole is filled. This compactive method consolidates the stone and the soils below and around it, so a group of Geopiers or Vibropiers creates a mass of competent soils. The competent soil mass distributes loads and reduces settlement. After the Geopiers or Vibropiers are installed, conventional shallow foundations are typically designed to bear directly on the aggregate pier reinforced soil mass.
For this project, we anticipate that a conventional shallow foundation system bearing on a properly designed and installed compacted aggregate pier system may be designed for an allowable bearing pressure in the range of 5,000 to 6,000 psf with total settlement of the footings of 1-inch or less and differential settlements of about 0.5 inches. The bearing capacity and settlement of the aggregate pier systems are a function of the on-site soils, the strength (modulus) of the compacted aggregate within the aggregate piers, the length of the aggregate piers, and the percentage of the foundation bearing area that is directly supported by the aggregate piers. As such, the actual design bearing pressure, settlement estimates, pier locations, and lengths should be provided by the licensed Geopier or Vibropier Design Professional.
If aggregate piers are used, Accura requests the opportunity to review the design for this project to determine if the design is consistent with our recommendations for this site. At least two load tests should be performed at the site, in the presence of the geotechnical engineer to evaluate the performance of the design for this project.
We note that aggregate piers can be susceptible to damage; and excavations adjacent to existing piers might result in loss of foundation support. As such, efforts should be made to perform utility installations or other excavation work prior to pier installation. No excavations should be permitted within a 1 (H): 1(V) lines extending down from the top of a completed aggregate pier, or within 5 feet of a completed pier (whichever distance is greater).
Also, aggregate pier installation for this project might be impacted by the shallow groundwater and/or caving soils. Therefore, the use of casing might require installing the piers.
11.3 Ground Floor Slabs
Following proper site preparation, as described in section 12.3 in this report, it is our opinion that a conventional slab-on-grade may be utilized for the proposed structures.
We recommend the floor subgrade in the proposed building pad areas be proofrolled or otherwise evaluated by the Geotechnical Engineer prior to floor slab concreting. A subgrade modulus of 120 pounds per cubic inch (pci) may be used to design the slab.
Also, a vapor barrier is recommended beneath the floor slab in areas where the slab will be finished with moisture sensitive coverings. We refer the concrete slab designer to ACI 302.1R-04, Sections 4.1.5 and 11.11, for further discussion on vapor retarders, curling, and the means to lessen potential concrete shrinkage and curling.
It has been our experience that the floor slab subgrade is often disturbed by weather, foundation and utility line installation, and other construction activities between completion of grading and slab construction. For this reason, our geotechnical engineer should evaluate the subgrade shortly prior to placing the concrete. Areas judged by the Geotechnical Engineer to be unstable should be re-compacted or treated as recommended by the geotechnical engineer.
11.4 Pavement Section Recommendations
The pavement design for the planned parking area should consider whether the pavement will be subjected to light-duty or medium-duty traffic. A light duty pavement section can be used where traffic is expected to primarily consist of autos and occasional light service vehicles.
A medium-duty pavement section should be used where the traffic will also consist of light and heavy service vehicles.
CBR testing was not part of our scope of services for this project. Pavement designs are normally based on a Design CBR (DCBR) value. A DCBR value of 4 has been estimated for this site.
For our evaluations, the estimated average daily traffic consists of 100 passenger cars per day, 15 light trucks per day and 2 tractor-trailers per day for the surface parking lot within the project site. If this traffic information and assumptions are incorrect, Accura should be contacted to revise the pavement design based on actually traffic types and volumes. The flexible pavements were designed based on a 20-year design life.
Using the assumed traffic type and the DCBR value, the following light- and medium-duty pavement sections are recommended for the project:
TABLE 11.4.1: RECOMMENDED PAVEMENT SECTION
Mix Design
Light-Duty Pavement (Parking
Stalls) (inches)
Medium-Duty Pavement
(inches)
Asphalt Wearing Surface (Superpave 9.5 mm Type II)
1.5 2
Asphalt Binder Course (Superpave 19 mm)
2 2.0
Graded Aggregate Base 6 8
We recommend that a rigid (concrete) slab at least 6-inches thick using 4,000 psi concrete over 12 inches of prepared subgrade be used for dumpster pad area, if any.
This pad should be large enough to accommodate the front wheels of the dumpster truck when the dumpster is being emptied. Concrete pavement is also recommended in any loading areas where heavy trucks will maneuver, or trailer jacks will be supported.
Accura Engineering also recommends the following values be considered for rigid pavement design for vehicle and concrete walkway for this project.
California Bearing Ratio = 4.0 Subgrade Reaction, k = 120 pci
Pavement Subgrade shall be compacted to at least 95% of the material’s maximum dry density as per standard (ASTM D-698). Accura recommends that the aggregate base course for pavement construction be compacted to 100% of the materials Modified Proctor (ASTM D-1557) maximum dry density.
We recommend the following pavement sections for the project.
TABLE 11.4.2: RECOMMENDED STANDARD DUTY PAVEMENT SECTION
Standard Duty Pavement Section Material Thickness (in)
PAVEMENT 4,000 psi reinforced concrete 5 BASE GDOT approved aggregate base 4
TABLE 11.4.3: RECOMMENDED HEAVY DUTY PAVEMENT SECTION
Heavy Duty Pavement
Section Material Thickness (in) PAVEMENT 4000 psi reinforced concrete 8
BASE GDOT approved aggregate base 6
The pavement should be constructed using the materials and construction procedures of the applicable Georgia Department of Transportation specifications. For the subgrade preparation recommended, these pavement sections should be suitable for the anticipated traffic loads. Reinforcement and appropriate joint spacing within the concrete pavements should be determined by the project designer. The most critical factor in providing long-term serviceability for a pavement is a well-prepared, uniform subgrade. The long-term effects of localized areas of improperly prepared subgrade may cause cracking or potholes to develop in the pavement. Even though the potholes will affect only limited parts of the total pavement area, the overall pavement serviceability will be significantly reduced.
Construction of the pavements should be performed in accordance with the latest edition of the Georgia Department of Transportation Standard Specifications for Roads and Structures.
11.5 Seismic Design Criteria
The seismic soil site class evaluations presented herein reference American Society of Civil Engineers (ASCE) 7-10 as specified by Section 1613.2.2 of the International Building Code (IBC) 2018. Chapter 20 of ASCE 7-10 entails an evaluation of the top 100 feet of the subsurface soil profile in order to determine the seismic site class; however, the deepest soil boring for this project was terminated at a depth of 56 feet for foundation design consideration.
Based on the average SPT N-values obtained and extrapolated to a depth of 100 feet, the subsurface conditions at the project site correspond most closely with those of Site Classification “D.” If the site is improved using aggregate piers for the proposed building, we recommend a Site Class “C” be used.
11.6 Stormwater Runoff
Due to the erodible nature of the subgrade soils, roof drainage and downspouts should be designed to discharge away from the building footprint onto nearby concrete or asphalt surfaces directed to storm water management systems.
11.7 Retaining Walls-Cast-In-Place Concrete
The following retaining wall recommendations pertain to cast-in-place building and site retaining walls and are not intended for modular block or MSE walls. Recommendations regarding a potential modular block or MSE walls for this project are provided later in this report.
The design of retaining walls must include the determination of the lateral pressure that will act on the wall. The lateral earth pressure is a function of the soil properties, surcharge loads behind the wall, and amount of deformation that the wall can undergo.
This deformation is basically dependent upon the relative rigidity of the wall system.
The active earth pressure condition develops when the wall moves away from the soil over a sufficient distance, such as for a freestanding cantilever wall. The at-rest condition exists when there is no lateral strain on the soil, such as walls, which are rigidly restrained like a basement, or sub-foundation wall. The passive condition occurs when the wall moves forward into the soil for a significant distance.
The following equivalent fluid pressures are recommended for different earth pressure conditions. These values may be considered for cast-in-place retaining walls or dead-men supported in/on competent residual soils or newly placed engineered fill.
Based on our experience with similar soils and field data, the recommended equivalent fluid pressures for retaining wall design are summarized in Table 11.7.1.
TABLE 11.7.1- SUMMARY OF ULTIMATE EQUIVALENT FLUID PRESSURES
(RETAINING WALLS)
These ultimate equivalent fluid pressures were calculated by the Rankine method using an estimated soil unit weight of 115 pcf an angle of internal friction of 30 degrees, and zero effective cohesion. To calculate resistance to sliding, a value of 0.38 (includes a safety factor of 1.5) should be used as the coefficient of friction between wall foundations and the underlying soil.
Provided the site is prepared as recommended in “Section 12.3” of this report, an allowable maximum toe pressure of up to 3,000 psf may be used for the design of retaining wall foundations bearing on competent residual soils. Our representative must evaluate the entire wall foundation area prior to wall construction. The conditions observed should be compared to test boring data and design requirements.
We note that considerable horizontal deflections are required to mobilize the passive pressure; therefore, the designer may often wish to consider a safety factor of 2 to the stated ultimate passive earth pressure in design. For site walls, it may also be appropriate to design the wall with a slight batter into the backfill.
The parameters listed above are based on a level backfill, no friction at the wall-soil interface, no surcharge effects, and adequate drainage behind the walls. The walls close to the adjacent streets and driveway should also be designed to withstand the stresses resulting from the traffic on the pavement. Retaining wall backfill should be compacted with lightweight construction equipment to prevent high stresses that would be imposed within the wall if heavy compaction equipment were used. Mechanical hand tampers (wacker-packers) should be used within 5 feet laterally behind the walls.
Retaining wall backfill should be compacted according to the Engineered Fill section below. Adequate drainage should be maintained behind the retaining walls to prevent
Pressure Conditions Co-efficient of Earth Pressure
Ultimate Equivalent Fluid Pressure
Active (Ka) 0.33 38 psf/ft
At-rest (Ko) 0.5 58 psf/ft
Passive (Kp) 3 345 psf/ft the buildup of hydrostatic pressure. A permanent drainage system such as a footing drain, or a fabric drain such as Enka drain, Miradrain, etc., is recommended for any retaining walls which are more than 5 feet in height. The retaining walls should be designed by a professional engineer familiar with retaining wall design and registered in Georgia. The designer should consider sloping backfill, surcharges and other factors affecting wall loadings.
11.8 Retaining Walls-MSE
Soil parameters for the potential MSE wall design for this project will depend primarily on the quality of the backfill used behind the wall, as well as the foundation materials below the wall face and the geogrid reinforced backfill. For MSE wall backfill, Accura recommends the use of select backfill consisting of free draining soils (sandy gravel, sand or slightly silty sand with minor clay fraction) having a plasticity index (PI) of 15 or less; an angle of internal friction (phi) of at least 30 degrees, and a moist unit weight of 120 pcf.
12.0 CONSTRUCTION RECOMMENDATIONS
12.1 General
The principal purpose of this section is to comment in general on the items related to earthwork and associated geotechnical engineering aspects of construction that should be expected for this project. It is recommended that Accura’s geotechnical engineer be retained to provide soil-engineering services during the construction phases of the project and perform appropriate evaluations to help assure that conditions encountered during construction are similar to conditions encountered in the borings. The geotechnical engineer can also assist in interpretation of differing subsurface conditions that may be encountered and recommend remedial work, if needed.
12.2 Existing Fill Considerations
The borings generally encountered fill soils to depths ranging from about 3 to 13 feet from the ground surface. Most of the fill generally appeared to be relatively clean, however, the fill was highly variable in consistencies, with occasional zones of very soft or very loose soils. Based on the provided finished floor elevations and finished grading information, we expect that most of the fill soils within the area of the proposed structures will remain.
As is the case with any previously filled site, existing fill may contain zones of soft soils, buried trash, organics, boulders, or other unsuitable materials. Unsuitable materials, if encountered, shall be removed and replaced and/or stabilized per geotechnical engineer’s recommendations. For construction over an undocumented fill and/or previously developed site, the owner must assume the risk of greater than normal settlement due to the possible presence of burial pits, soft soils, or unsuitable materials within the fill. SPT borings alone are not well suited to evaluate existing fill. The only true way to determine the condition of an existing fill is to completely remove and replace the fill. Accura recommends that fill within planned pavement and building areas be evaluated by the geotechnical engineer during construction, and the project budget include contingency funds in the event that soft soils, buried trash, or other unsuitable materials requiring removal are encountered during construction.
12.3 Site Preparation
The entire construction area should be stripped of grass, stumps, vegetation, organic-laden soils, debris or any other deleterious materials to a minimum of 5 feet outside the structural limits for building and parking deck, and 2 feet for paved areas. The existing building and pavement, and any underground utilities should be demolished and removed from the construction limits. The debris associated with demolition of existing structures should also be removed from the site. Underground utility lines should be relocated or capped off outside the construction area. We do not recommend active or non-active utility lines located within the proposed structure footprints. Therefore, all utility excavations should be backfilled with properly compacted engineered fill. Any abandoned utility pipes, if left in place, outside of building footprints and parking areas, should be filled-in under pressure with cement grout with minimum 28-day compressive strength of 500 pounds per square inch (psi).
Depressions or low areas resulting from stripping and or clearing operations should be backfilled with approved soil and compacted in accordance with the recommendations presented in this report.
During grading operations hidden features in the substratum such as organic laden soils, or other deleterious materials, may be encountered within the proposed construction area. Generally, such features will require removal. Details regarding the removal of deleterious materials should be determined on a case-by-case basis and, therefore, contract documents should include a contingency cost for the removal of such subsurface features.
We recommend site preparation be monitored by the geotechnical engineer or his representative to verify that the recommendations presented herein are implemented.
After stripping surficial soils, we recommend the areas to receive fill, foundations and pavements, including the area of the proposed structures, be proofrolled. Proofrolling should be performed with a fully loaded tandem-axle dump truck or similar piece of rubber-tired equipment with a minimum loaded weight of 20 tons. The purpose of the proofrolling is to detect any localized or isolated weak soil zones in building and pavement areas prior to backfilling.
If soft or weak zones are identified during proofrolling, such areas should be undercut and replaced with properly compacted engineered fill prior to the foundation construction. We suggest that contingency funds be allotted within the project budget for over-excavating and replacing weak, deleterious soils within the proposed building and pavement areas.
12.4 Structural Fill Placement and Compaction
Prior to fill placement, representative samples of each structural fill material should be collected and tested by Accura Engineering and Consulting to determine the material’s moisture-density characteristics (including the maximum dry density, optimum water content, gradation and Atterberg limits). These tests are needed for quality control of the structural fill and to determine if the fill material meets project specification requirements.
Fill in structural areas should be free of organics, roots, or other deleterious materials;
should not contain more than five percent (by weight) organic material; should not have a plasticity index (PI) greater than 25, and; should not have a maximum dry density less than 90 pounds per cubic foot. Soils not meeting these criteria may be used in landscaped or non-structural areas. Compacted structural fill should consist of material classified as CL, ML, SC or SM per ASTM D2487, or others as approved by the geotechnical engineer. Soils imported from off-site sources should also meet similar classification requirements and be approved by the geotechnical engineer prior to use.
Successful reuse of the excavated, on-site soils as compacted structural fill will depend on the water content and the plasticity of the soils encountered during excavation.
Once fill placement begins, a qualified soils technician should perform field density tests to document the degree of compaction being obtained in the field. Structural fills should be placed in thin (8- to 10-inch) loose lifts and compacted to the following recommendations:
• Upper 18 inches below the final subgrade elevation:
98% of the soil’s standard Proctor maximum dry density (ASTM Test Method D698) at or near optimum water content: maximum deviation of ±3 percent.
• Depths below 18 inches:
95% of the soil’s standard Proctor maximum dry density (ASTM Test Method D698) at or near optimum water content: maximum deviation of ±3 percent.
Some manipulation of the water content (such as wetting or drying) may be required during the filling operation to obtain the required degree of compaction. The manipulation of the water content is highly dependent on weather conditions and site drainage conditions. Therefore, the grading contractor should be prepared to both dry and wet the fill materials to obtain the specified compaction during grading. Regular one-point Proctor tests should be conducted in an attempt to verify that the most representative Proctor curve is being selected. Sufficient density tests should be performed to confirm the required compaction of the fill material.
12.5 Surface Water Control
If free water is allowed to stand on stable subgrade soils, particularly the silty sand materials, these soils can absorb water, swell, and experience a reduction in their support capability. As a result, we recommend that the subgrade surface be graded to provide positive drainage away from the construction areas and towards suitable drainage handling areas, such as a perimeter ditch, French drain, culvert, or retention pond.
Trapped or perched water conditions could develop during periods of inclement weather and during seasonally wet periods. Such conditions could cause seepage into excavations and deeper cuts. Therefore, grading of the project should be performed in such a manner to prevent ponding of water and promote runoff away from construction areas. In addition, if site grading is performed during the seasonally wet months or after extended periods of inclement weather, wet and water softened near surface soil conditions should be expected.
12.6 Groundwater Conditions
Groundwater was encountered in most borings ranging from 12 to 37 feet after completion of drilling below the existing grade. Based on the borings data, groundwater should not be a significant concern during construction. Due to the presence of up to 13 feet of fill, the site is also susceptible to formation of perched water. The contactor should be prepared to remove perched, or groundwater as needed.
Groundwater levels tend to fluctuate with seasonal and climatic variations as well as with some types of construction operations. Generally, the highest groundwater levels occur in late winter and early spring and the lowest levels occur in late summer and early fall. Depending on time of construction, groundwater may be encountered at locations not explored during this study. If encountered during construction, engineering personnel from our office should be notified immediately.
12.7 Excavation Characteristics
No partially weathered rock (PWR) or rock was encountered in the current and previous borings. Difficult excavation conditions associated with PWR, or rock excavation are not generally expected in the areas explored.
12.8 Excavations
All excavations required in this project must be performed in accordance with the United States Department of Labor, Occupational Safety and Health Administration (OSHA) guidelines or other applicable jurisdictional codes for permissible temporary side-slope ratios and or shoring requirements. The OSHA guidelines require daily inspections of excavations, adjacent areas and protective systems by a “competent person” for evidence of situations that could result in cave-ins, indications of failure of a protective system, or other hazardous conditions.
Excavated soil, equipment, building supplies, etc., should be placed away from the edges of the excavation at a distance equaling or exceeding the depth of the excavation.
Accura Engineering and Consulting cautions that the actual excavation slopes will need to be evaluated frequently each day by the “competent person” and flatter slopes or the use of shoring may be required to maintain a safe excavation depending upon excavation specific circumstances. The contractor is responsible for providing the “competent person” and all aspects of site excavation safety. Accura Engineering and Consulting can evaluate specific excavation slope situations if we are informed and requested by the owner, designer or contractor’s “competent person”.
APPENDIX I
Site Vicinity Map (Drawing No. 01)
Test Location Plan (Drawing No. 02)
Subsurface Profile-Building (Drawing No. 03-01, Drawing No. 03-02)
Subsurface Profile-Parking Lot (Drawing No.
This is the start of the file's text. The full file is on GovTribe.