Exhibit C _ DB Fee Proposal.docx
DOCX document 25 KB Posted
- Attached to
- UNG BR-68-2601-DB Poultry Instructional Center
- Solicitation number
- PE-47200-RFQ-2026-000000121
- Issued by
- Lanier County, Georgia
About this file
This is a Design Builder Fee Proposal document for the Poultry Instructional Center at the University of North Georgia (Project No. BR-68-2601). The document outlines the compensation structure for the Design Builder's services across three primary service categories: design consultant services, pre-construction consulting services, and construction services. The proposal requires the Design Builder to provide all design services, construction administration, pre-construction consulting, and construction services as defined in the contract documents within established time limits.
The fee structure consists of three fixed fee components: a Design Consultants Fee for basic design and construction administration services, a Preconstruction Fee representing gross profit for pre-construction consulting services, and a Construction Fee representing gross profit for construction services. Additionally, the Design Builder must submit maximum allowable amounts for Pre-Construction Costs and Expenses and Construction Overhead Costs, which are inclusive of all direct and incidental expenses and must be detailed in separate attachments. The total maximum overhead cost is the sum of pre-construction and construction overhead expenses, excluding the respective fees already itemized.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _UNG BR_68_2601_DB RFQ_RFP.pdf | ||
| Exhibit F _ Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit D _ Precon Cost and Expenses.xlsx | XLSX spreadsheet | |
| Exhibit B _ Contractor Affidavit.docx | DOCX document | |
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document | |
| Exhibit E _ General Conditions Breakdown.xlsx | XLSX spreadsheet | |
| Egnyte Upload Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15 of Exhibit C
Project No. BR-68-2601 Poultry Instructional Center University of North Georgia
DESIGN BUILDER (DB) FEE PROPOSAL
1. DB’S FEE:
Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. DESIGN CONSULTANTS FEE:
Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:
TOTAL
Design Fee (fixed fee)
B. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
C. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:
The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
DB Firm Name
By:__________________________________________________________ Signature of DB Officer
Title of DB Officer
File details come from the government source that posted it. Updated .