EXHIBIT B Technical Spreadsheet.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- W912EK24R0040
About this file
This document is a technical spreadsheet (EXHIBIT B) that is part of a Request for Proposal (RFP) for a snow and ice removal service contract at the Clock Tower Complex in Rock Island, Illinois. The RFP is solicited by the U.S. Army Corps of Engineers, Engineering District Rock Island.
The technical spreadsheet includes requirements for the prime contractor to: 1) demonstrate the capability to self-perform at least 85% of the on-site work, 2) respond to snow/ice emergencies within 1 hour of notification, 3) provide a list of equipment that will remain on-site including a skid steer or tractor and pickup truck, and 4) show proof of available salt inventory at their facility for at least one ice control emergency. Contractors are encouraged to provide supporting documentation such as pictures of equipment and proof of salt inventory.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449 Solicitation W912EK24R0040.pdf | ||
| DWG 2 CT Complex Snow Plowing Areas Map.pdf | ||
| Appendix B Eng Form 6293.pdf | ||
| DWG 3 Building 340.pdf | ||
| DWG 4 Building 340 - parking.pdf | ||
| EXHIBIT A Experience Spreadsheet.xlsx | XLSX spreadsheet | |
| Appendix A QASP Snow Removal.pdf | ||
| DWG 1 Vicinity Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TAB 1 TECHNICAL QUOTE
| Factor 1, Technical | Please fill out the sections in yellow. | |
| Contractors name | ||
| Cage code | ||
| UEI | ||
| a. | The prime contractor must submit proof of capability to self-perform at least 85% of the on-site work thru their own staffing and equipment. | |
| Please provide a discription of staff and equipment for proof of self performing at least 85%. |
| b. | The prime contractor must demonstrate the capability to be on site, with necessary equipment, responding to a snow or ice emergency within 1 hour of government notification. |
| Please provide proof of capability to be on site with the necessary equipment to be able to respond to a snow or ice emergency within 1 hour of government notification. |
| c. | The prime contractor is required to submit a list of equipment that will remain on-site during contract performance. At a minimum the contractor is required to have on-site a skid steer or tractor and pickup truck. |
| Please provide a list of equipment that will be used for this contract. Proof of on-site a skid steer or tractor and pickup truck are requirement. Contractors are encouraged to provide pictures of equipment. |
| d. | The prime contractor is required to show proof of salt availability at the contractor’s facility for at a minimum of one ice control emergency. |
| Please provide proof of salt that is at your facility. Contractors are encouraged to provide pictures or invoice as verification of salt purchased. |
File details come from the government source that posted it. Updated .