Exhibit B - Pricing Matrix - Fiber Optics.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 1016A-2025
- Issued by
- Colorado
About this file
The document is an Excel-based Pricing Matrix for Fiber Optic Services prepared for the City and County of Denver, Colorado, specifically related to a Citywide Emergency & On-Call Fiber Optic Services contract. The matrix details comprehensive pricing and labor specifications for fiber cabling installation and fiber splicing services, including various technical scopes such as butt splicing, midsheath labor, and fiber distribution panel point work. The document outlines different service scenarios ranging from 24 to 432 splices and covering 1 to 288 fibers, with provisions for 24-hour and 72-hour response times.
The pricing matrix includes rate structures for multiple job titles including supervisors, engineers, technicians, and other unspecified roles, with columns for hourly rates and minimum billable minutes for different response time windows. While specific dollar amounts are not populated in the template, the document is designed to capture labor rates, response times, and technical complexity across various fiber optic service scenarios. The pricing matrix appears to be a critical component of the solicitation, allowing potential contractors to detail their pricing methodology for emergency and on-call fiber optic services for the City and County of Denver, with a focus on transparent and comprehensive cost documentation for complex technical work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
FIBER CABLING INSTALLATION AND FIBER SPLICING
| Scope of Work | Number of Splices and/or Fibers | Max Technician Minutes Required to Complete |
| Butt Splice Labor to Include Setup, Cable and Closure Prep, Fusion Splice and Heat Shrinks | 24 Splices | |
| 48 Splices | ||
| 96 Splices | ||
| 144 Splices | ||
| 216 Splices | ||
| 288 Splices | ||
| 432 Splices |
| Midsheath Labor to include Ring Cut on Backbone; Cable and Closure Prep, Fusion Splice and Shrinks | 1 to 24 Fibers |
| 25 to 48 Fibers | |
| 49 to 72 Fibers | |
| 73 to 144 Fibers | |
| 145 to 288 Fibers |
| Fiber Distribution Panel Point Labor to Include Panel Install, Route and Rack, Cable Prep, Fusion Splice and OTDR Test | 24 Splices |
| 48 Splices | |
| 96 Splices | |
| 144 Splices | |
| 216 Splices | |
| 288 Splices | |
| 432 Splices |
| Job Title | $/hour - 24-Hour Response Time | 24-Hour Response Team - Minimum Minutes Billed | $/hour - 72-Hour Response Time | 72-Hour Response Team - Minimum Minutes Billed |
| Supervisor | $ - 0 | $ - 0 | ||
| Engineering | $ - 0 | $ - 0 | ||
| Technician | $ - 0 | $ - 0 | ||
| OTHER | $ - 0 | $ - 0 | ||
| OTHER | $ - 0 | $ - 0 | ||
| OTHER | $ - 0 | $ - 0 | ||
| OTHER | $ - 0 | $ - 0 |
MATERIALS PERCENT MARK-UP %
File details come from the government source that posted it. Updated .