Exhibit_B_-_Functional_Requirements_Matrix.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Ocean Center Wireless Network Upgrade
Solicitation number
25-P-45JRD
Issued by
Volusia County, Florida

About this file

Exhibit B is a Functional Requirements Matrix for Volusia County, Florida's Ocean Center Wireless Network Upgrade (RFP #25-P-45JRD), detailing comprehensive wireless infrastructure requirements. The project involves a full turnkey wireless solution for system design, installation, testing, and integration, targeting the replacement of core fiber infrastructure and low-voltage cabling across the Ocean Center. The contract requires installing a wireless network capable of supporting 34,907 devices across facility spaces, including meeting rooms, ballrooms, arena, exhibit hall, and parking garage, with a Wi-Fi 6 (802.11ax) or newer standard. The entire system must be operational within 6 months of purchase order issuance, with installation work coordinated to avoid disrupting existing events, and the contract is structured for a five-year term with potential two one-year renewals.

The project emphasizes advanced wireless capabilities, including redundant Wireless LAN Controllers, a management dashboard for system monitoring, multiple user onboarding options, and potential revenue generation through tiered WiFi pricing models. The contractor must provide hands-on training for three county staff members, evaluate and potentially reuse existing infrastructure components to minimize waste, and ensure a minimum signal strength of -65 dBm across coverage areas. While no specific budget is detailed, the procurement will be evaluated using a comprehensive scoring system weighting firm qualifications (20%), total cost (15%), project approach (22.5%), solution capabilities (22.5%), and maintenance & warranty (20%). The project includes provisions for liquidated damages of $1,000 per day for implementation delays and requires compliance with local government regulations including E-Verify and non-discrimination policies.

View the file

Other files

File Type Posted
Ocean_Center_Wireless_Network_Upgrade_(Addendum_#4_Revision).pdf PDF
Ocean_Center_Wireless_Network_Upgrade_(Addendum_#4_Revision).pdf PDF
Ocean_Center_Wireless_Network_Upgrade_(Addendum_#4_Revision).pdf PDF
Exhibit_H_-_First_Floor.dwg DWG drawing
Exhibit_G_-_Ocean_Center_Floorplans_-_Set_2.pdf PDF
Exhibit_J_-_Second_Floor.dwg DWG drawing
Exhibit_H_-_First_Floor.dwg DWG drawing
Exhibit_I_-_Mezzanine_Level.dwg DWG drawing
Exhibit_H_-_First_Floor.dwg DWG drawing
Exhibit_I_-_Mezzanine_Level.dwg DWG drawing
Exhibit_G_-_Ocean_Center_Floorplans_-_Set_2.pdf PDF
Exhibit_I_-_Mezzanine_Level.dwg DWG drawing
Exhibit_J_-_Second_Floor.dwg DWG drawing
Exhibit_G_-_Ocean_Center_Floorplans_-_Set_2.pdf PDF
Exhibit_J_-_Second_Floor.dwg DWG drawing
Exhibit_F_-_Sample_Agreement_25-P-45JRD.pdf PDF
Exhibit_F_-_Sample_Agreement_25-P-45JRD.pdf PDF
Exhibit_F_-_Sample_Agreement_25-P-45JRD.pdf PDF
Exhibit_A_-_Insurance_Requirements_25-P-45JRD.pdf PDF
Exhibit_A_-_Insurance_Requirements_25-P-45JRD.pdf PDF
Exhibit_A_-_Insurance_Requirements_25-P-45JRD.pdf PDF
Exhibit_B_-_Functional_Requirements_Matrix.xlsx XLSX spreadsheet
Exhibit_B_-_Functional_Requirements_Matrix.xlsx XLSX spreadsheet
Exhibit_C_-_Ocean_Center_Plans.pdf PDF
Exhibit_E_-_COV_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Exhibit_C_-_Ocean_Center_Plans.pdf PDF
Exhibit_E_-_COV_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Exhibit_D_-_WiFi_Building_Occupancy_and_Space_Volume_Dimensions.pdf PDF
Exhibit_D_-_WiFi_Building_Occupancy_and_Space_Volume_Dimensions.pdf PDF
Exhibit_D_-_WiFi_Building_Occupancy_and_Space_Volume_Dimensions.pdf PDF
Exhibit_C_-_Ocean_Center_Plans.pdf PDF
Exhibit_E_-_COV_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Functional Fields 1

25-P-45JRD

Exhibit B – Functional Requirements Matrix

Response CodeDefinition
Y—YesThe functionality will be implemented ‘out of the box’ without configuration, customizations or modifications to the existing applications or reports.
N—NoRequirement will not be provided.
CO—ConfigurationRequirement will be met through changes to settings of tables, switches, and rules without modification to source code. Include any changes to the existing or “out of the box” workflow functionality.
CU—CustomizationRequirement will be met by changing existing software or through the use of software tools such as application report writer, query, etc. Note: In the Comments column next to this response, you must indicate the following: Description of customization Estimated level of complexity (High, Medium, Low)

If there is an additional cost it must be included in the cost proposal.

F—FutureRequirement will be met by software that is currently under development, in Beta test, or not yet released. Note: In the Comments column next to this response, indicate the date when requirement will be available for implementation. If possible, also indicate any additional costs.
3—Supplied by 3rd PartyThe requirement will be met by a third-party software for which the solution provider does not have an established practice area, and the third party software is included in this Proposal for implementation. Note: In the Comments column, indicate the name of the proposed 3rd party software and indicate the interface/integration services being proposed.
Ocean Center Wireless Upgrades
Comprehensive Design and InstallationOne Response Per RequirementComments
Y/NCOCUF3
Contractor shall provide a full turnkey solution, including system design, installation, testing, labeling and documenting all components, and integration with existing or new network infrastructure.
Contractor shall replace the core fiber infrastructure to ensure optimal connectivity and future scalability per Exhibit E - COV Div 27 Technology System Design and Installation Guidelines.
Contractor shall install all necessary low-voltage cabling to connect WAPs and other network components to IDF/MDF locations per Exhibit E - COV Div 27 Technology System Design and Installation Guidelines.
The solution shall provide the capability for all users maintaining uninterrupted connections within each specified room/display area of the Ocean Center with user densities as specified in the Scope of Work. The solution shall be able to support 34,907 devices (23,271 total users x 1.5) across all areas, composed of any combination of but not limited to smart phones, tablets, or laptops.
The solution shall provide WiFi service in the rooms/locations described in the Scope of Work.
The solution shall include redundant Wireless LAN Controllers (WLCs) or modern equivalent
The solution shall provide a management dashboard for overall system health monitoring, reporting usage by SSID, WAP, connected device, and bandwidth utilization.
The solution shall provide multiple onboarding options, such as:

- QR codes prominently displayed throughout the building

- Digital advertisements on reader boards and WiFi signage.

The solution shall provide the ability to Distribute pre-arrival instructions with:

- Event-specific usage information

- QR codes or links directing users to a tailored landing page.

The solution shall provide the abiliity to implement a user acknowledgment process for:

- Terms of service

- Data collection disclosures.

The solution shall offer features to support:

- Secure guest access

- Data collection for attendee engagement analysis.

The solution shall ensure ease of use to address common user complaints.
The solution shall offer a one-stop platform for all needs such as:

- Internet upgrades

- Event-specific extensions.

The system shall provide legal disclaimers to limit liability and state that the Ocean Center is not responsible for device issues while on the network.
Ocean Center Delivery Date and Work ScheduleOne Response Per RequirementComments
Y/NCOCUF3
The entire system shall be installed and operational no later than 6 months after Purchase Order issuance.
The work hours for installation activity shall be coordinated with Ocean Center staff such that no existing show/event will be impacted. Besides normal business hours, the Contractor shall be prepared to work the necessary hours (nights and weekends) in order to meet the Requirements and Delivery Date.
Ocean Center Performance RequirementsOne Response Per RequirementComments
Y/NCOCUF3
The solution shall be able to support 34,907 devices (23,271 total users x 1.5) across all areas, composed of any combination of but not limited to smart phones, tablets, or laptops per the user density maximums specified in the Scope of Work.
The solution shall support a minimum of 1.5 devices per user across all designated spaces
The solution shall provide uninterrupted roaming and coverage in the rooms described in section the Scope of Work.
The solution shall ensure a signal strength of -65 dBm or better in all coverage areas.
The solution shall comply with the latest Wi-Fi 6 (802.11ax) or newer standards
The solution shall utilize hospitality-grade solutions (e.g., ElevenSoftware/11OS or equivalent) to:

- Streamline user onboarding

- Facilitate landing page creation and customizations

- Manage WiFi monetization and data analytics.

Ocean Center Reuse and Disposal of Existing Equipment One Response Per Requirement Comments

Y/NCOCUF3
The Contractor shall evaluate, develop specifications, provide and install the network hardware to support the solution. Particular consideration should be given to reusing newer switches, provided they meet the performance and compatibility requirements of the proposed solution.
The Contractor shall evaluate existing switches and other infrastructure components for compatibility with the proposed wireless and fiber system.
The Contractor shall prioritize cost-effective integration of functional, non-obsolete equipment to minimize waste and expenses.
The Contractor shall replace equipment that cannot support the new system's technology requirements or performance standards.
The Contractor shall provide justification for any replacement of existing devices deemed reusable during the assessment.
All Access Points (APs) and switches identified as obsolete or incompatible shall be removed by the Contractor.
The Contractor shall deliver all replaced equipment to the designated location at 203 West Rich Ave, Deland, FL 32720.
Ocean Center TrainingOne Response Per RequirementComments
Y/NCOCUF3
The Contractor shall provide hands on training and documentation for report generation, system administration, system operations, and dashboard usage for at least three (3) members of County staff.
Ocean CenterMonetization and UpsellingOne Response Per RequirementComments
Y/NCOCUF3
The solution should support revenue generation through:
Tiered Pricing Models (Examples):

-Standard WiFi: $5 for up to 4 hours.

-Enhanced WiFi: $10 for up to 4 hours.

-Premium WiFi: $20 for up to 4 hours.

-Access to all tiers shall be valid building-wide.

Custom Landing Pages:
Enable/Disable as needed for events
Tailor landing pages to specific groups or events, including vendor sponsorship opportunities.
Hospitality Integrations:
Centralize all offerings, including WiFi upgrades and other services, on the landing page.
Advertising Opportunities:
Sell ad impressions for local restaurants, shops, and entertainment.
Capture user information (e.g., email addresses) for future marketing campaigns.

&"Arial,Bold"&12EXHIBIT B &"Arial,Bold"&12 25-P-45JRD

File details come from the government source that posted it. Updated .