Exhibit_B_DIDs.pdf

PDF 777 KB Posted

Attached to
Overhaul of the F100-PW-220/220E 3rd stage turbine vanes
Solicitation number
FA8121
Issued by

View the file

Other files

File Type Posted
FA812121R0008.pdf PDF
Attachment_6_RQR-PSD-1_Rev_2.pdf PDF
Attachment_1_Performance_Work_Statement.docx DOCX document
Attachment_2_Packaging_Requirements.pdf PDF
Attachment_3_Transportation_data.pdf PDF
Attachment_5_Price_Matrix.xlsx XLSX spreadsheet
Attachment_4_Repair_Data_lists.pdf PDF
Exhibit_A_CDRLs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: http://assist.dla.mil -- Downloaded: 2020-08-20T18:47Z Check the source to verify that this is the current version before use.

DATA ITEM DESCRIPTION

Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING

Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A

Use/relationship:

The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.

Requirements:

1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.

2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:

A. Receipt of Asset

1) On Contract

2) Not on Contract

3) Procurement

4) "A" Condition

5) Rotable Pool

6) Loaned Asset

B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z

DI-MGMT-81838

G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers

3. End of DI-MGMT-81838.

Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z

DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188

1.nTLE 2.IOENTIFICATIONNUMBER

TEST/ INSPECTION REPORT DI-NM’I-80809B

L OESCRIPTlOtVPURPOSE

3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.

1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable

(YVMMOD)

F/AFMC-DCJP

970124

,.APPLlCAT\0NflNTER7iElAT10NSH1P

7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement

I as delineated in the contract.

I

7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.

7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653

1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER

F7231

10,PREPARATIONlNSTRUCnONS

10.1 Format. Contractor format is acceptable.

paragraph 10.2 and its subparagraphs in a manner understanding

10.2 CQnL!aL. The test/inspection report shall

applicable.

Organize the information required by that facilitates presentation and contain the following information, as

10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:

a. Report date.

b. Report number (contractor or government)

Contractor’ s name, address, and commercia 1 and government entity code.

Contract number and contract line item number or sequence number (if applicable)

e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.

9. Date or period of test/inspection.

h. Name and address of requiring government activity.

i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.

(Continued on page 2 )

1.DIS77UBUTIONSTATEMEW

DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.

ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123

DI-NDTI-80809B

Block 10, Preparation Instructions (continued)

10.2.2 ~. The table of contents shall identify the following:

a. The title and starting page of each major section, paragraph, and apPendix of the report.

b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)

10 .2.3 -ductim. The introduction shall include the following information:

10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.

10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:

a. Nomenclature.

b. National stock number.

Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )

e. Serial or lot number.

f. Applicable engineering changes

9. Production item specification, if applicable.

h. Date of manufacture.

10.2 .3.3 Complete inspection requirements correlated to contractual following:

Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.

10.2.4 ~. Complete test/inspection report following:

identification of the testl requirements including the compliance limits, and summary including the

a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.

b. Proposed corrective actions and schedules for failures or problems encountered.

c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.

d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.

10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:

a. Prior testf inspection reports on the same item.

b. Test /inspection plans and procedure documents

c. Prior certifications of compliance.

d. Contractor’ s file designation where test/ inspection records are maintained.

e. Input parameters used.

The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Page 2 of 4 Pages

10.2.6 ~. The body of the testlinspection report shall be as follows :

10 .2.6.1 KzZL_ + de.tlflca~.

Complete identification of each item of test equipment used in the testlinspection including the following:

a.

b.

c.

d.

e.

f.

9.

10. 2.6.2

Nomenclature.

Model number.

Serial number.

Manufacturer.

Calibration status.

Accuracy data.

Comments, if applicable.

Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:

a. Location or orientation of the item.

b. Location. orientation, or settinm of test equipment and instrumentation.

c. Location, orientation, or settings of sensors and probes

d. Location or orientation of interconnections, cables, and hoop-ups.

e. Electrical power, pneumatic, fluidic, and hydraulic requirements.

Drawings, illustrations, and photographs maY be used for clarification.

10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:

a. Item selection and inspection that verified suitability for test/ inspection.

b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.

10 .2.6.4 A copy of all testlinspection results and analysis to include the following:

10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.

10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:

a. Matrices comparing results achieved against test/inspection objectives or requirements

b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.

Calculation examples.

;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.

10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:

a. The effectiveness of the testlinspection procedures in measuring item performance.

Page 3 of 4 Pages

b. The success or failure of the item to meet required test/inspection objectives.

c. The need for repeat, additional, or alternative tests linspections.

d. The need for item redesign or further development.

e. The need for improved test/inspection procedures, techniques, or facilities.

f. The adequacy and completeness of the test/inspection requirements.

10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:

a b.

c.

d.

e.

f.

9.

h.

Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.

Redesign required.

Problem resolution.

Test/inspection procedure or facility improvements Disposition of items tested/inspected.

Documentation changes required.

Testing/ inspection improvements

10.2.7 The following certifications shall be included, .as

applicable:

10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses

10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.

Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.

10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness

10.2.8 Appendices shall be used to append detailed

test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.

Page 4 of 4 Pages

Title: Government Furnished Material (GFM) by National Stock Number (NSN)

Number: DI-PSSS-80727A Approval Date: 20190916

AMSC Number: 10090 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: AV Project Number: PSSS-2019-015

Applicable Forms: N/A

Use/relationship: To provide visibility of Government Furnished Material (GFM) inventories by National Stock Number (NSN) and Part Number.

a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

b. This DID supersedes DI-ILSS-80727.

Requirements:

1. Reference Documents. None

2. Format. The items shall be ordered first by contract number; within each contract number ordered by contract line item number (CLIN) or exhibit line item number (ELIN); within each

CLIN or ELIN ordered by GFM line item. The GFM by NSN shall be in one of the following formats:

a. Electronic media specified by the Acquirer, or

b. Contractor format.

3. Content. The GFM by NSN shall cover all GFM items in the inventory. The following information shall be provided for each GFM item:

a. Contract number.

b. CLIN or ELIN to which each NSN and Part Number of GFM is applicable.

c. NSN of GFM.

d. Part Number of GFM.

Source: http://assist.dla.mil -- Downloaded: 2020-03-16T20:02Z

DI-PSSS-80727A

e. Inventory requirements (e.g., usage rates) that the contractor establishes to achieve the performance required by the contract.

f. Quantity on hand.

g. Unit price of GFM.

h. Existing Government inventory that the contractor manages against the inventory requirements that the contractor establishes to achieve the performance required by the contract.

i. Existing Government inventory that the contractor holds in excess against the inventory requirements that the contractor establishes to achieve the performance required by the

j. Narrative supporting rationale for any GFM line item, which the contractor recommends to remain in an excess position.

k. Proposed actions for the reuse or disposal of Government inventory identified by the contractor as excess to meeting contract requirements.

End of DI-PSSS-80727A.

Source: http://assist.dla.mil -- Downloaded: 2020-03-16T20:02Z

Title: TEARDOWN DEFICIENCY REPORT

Number: DI-PSSS-81534A Approved Date: 20160608 AMSC Number: F9670 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2015-024 Applicable Forms: N/A Use/Relationship: The Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.

a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired.

b. This DID contains the format, content and intended use information for the data deliverable resulting from the work task described in the solicitation.

c. This DID supersedes DI-ALSS-81534.

Requirements:

1. Reference documents. None.

2. Format. The Teardown Deficiency Report shall be in the contactor’s format.

3. Content. This report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:

a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.

b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.

c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.

Equipment conforms to specifications and TO standards and procedures.

d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.

e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2016-06-27T17:52Z

DI-PSSS-81534A

f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.

g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.

h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.

i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.

End of DI-PSSS-81534A.

Source: https://assist.dla.mil -- Downloaded: 2016-06-27T17:52Z

Title: DEFICIENCY REPORT (DR)

Number: DI-PSSS-81535A Approved Date: 20160524 AMSC Number: F9660 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AF 11 (AFLCMC/EZSC) Project Number: PSSS-2016-013 Applicable Forms: N/A

Use/Relationship: The Deficiency Report (DR) provides complete and accurate deficiency identification on government furnished material (GFM) in repair contracts by contractors to the Government. This information is used by the Government to identify necessary corrective action in accordance with T.O. 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.

(Copies of this document are available online at http://www.tinker.af.mil/technicalorders/.)

a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

b. This DID is applicable when contractors are responsible for maintaining custodial records for government property being repaired.

c. This DID interrelates with DI-MGMT-80258, Material Improvement Project (MIP) Report.

(Copies of this document are available online at http://quicksearch.dla.mil.)

d. This DID supersedes DI-ALSS-81535.

Requirements:

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Contractor format is acceptable.

3. Content. The Deficiency Report content shall be as described in Table I.

Source: https://assist.dla.mil -- Downloaded: 2016-06-27T19:20Z Check the source to verify that this is the current version before use.

http://www.tinker.af.mil/technicalorders/ http://quicksearch.dla.mil/

DI-PSSS-81535A

TABLE I. Deficiency report content.

1. From: Address of Originating Activity

2. To: Office of Primary Responsibility (OPR) for the equipment. Refer to D043 or D086 for guidance.

Subject First Part as applicable:

a. Category I Deficiency Report (CAT I DR)

b. Category II Deficiency Report (CAT II DR)

c. Report Control Number (RCN): An RCN consists of three parts. The first part will be the DoD Activity Address Code (DoDAAC).

The second part will be the last two digits of the calendar year.

The third part will be a 4-digit sequence number that is locally assigned.

3. Description of Deficiency:

Describe in detail what is wrong, the circumstances prior to the difficulty, probable cause, any action taken, and recommendations. Attach copy of supporting documents. Continue on separate sheet if necessary. Ensure that the description answers the questions listed in the instructions on the back of this form

4. Date of Deficiency: Year, month, day deficiency was discovered.

5. National Stock

Number (NSN) NSN and applicable Material Management Aggregation Code (MMAC) of item (see D043 and D086).

6. Nomenclature Noun of item for which report is submitted. Software DRs shall provide nomenclature of programmable hardware.

7. Operating Time at Failure

Hours, cycles, days, miles rounds or others

8. Deficient Item Part Number

Complete Manufacturer part number. If Computer Identification Number (CPIN) is associated with a computer program it shall also be provided.

9a. Manufacturer’s CAGE Code

Unique code assigned to suppliers of government or defense agencies.

9b. Manufacturer/Shipper/ City/State

Complete address of manufacturer or shipper.

10. Quantity Number received, inspected, deficient, and in stock.

11. Serial, lot or batch number Complete item serial number.

12a. Item new, repaired or overhauled

Use one to identify item as appropriate.

12b. Date Manufacturer, Repaired or Overhauled

Year/Month/Day

12c. Last Repair Facility CAGE/DoDAAC/Address

DI-PSSS-81535A

13a. Contract Number Obtain contract number from records service tag, manufacturer/container label, etc. Contract number is critical to processing reports.

13b. Requisition/Document Number

Obtain from tags/labels on item packaging.

13c. Purchase Order Number.

The Purchase Order Number associated with the defective part. This can usually be found on the attached shipping document.

14. Government Furnished Material (GFM)

Yes/No/Unknown

15a. Item Under Warranty Yes/No/Unknown 15b. Warranty Expiration

Date Provide if known.

16. End Item Enter the applicable Equipment Item Code (EIC), Work Unit Code (WUC), or Table of Authorized Material Control Number (TAMCN) for the deficient material.

17. Next Higher Assembly a. NSN – National Stock Number associated with the next higher assembly.

b. NOMENCLATURE – Item name of the next higher assembly.

c. PART NUMBER – Part number assigned to the next higher assembly.

d. SERIAL NUMBER – Serial number from the next higher assembly.

18. End Item a. NSN – National Stock Number associated with the end item.

b. NOMENCLATURE – Name of the end item.

c. TYPE/MODEL – Type or model assigned to the end item configuration.

d. SERIAL NUMBER – Serial number from the end item equipment or system.

19. Current Disposition of Deficient Item

Holding/Disposed or Destroyed/Repaired/Other

20. Location of Deficient Material

Enter the name and location or supply activity that is currently holding the exhibit/deficient material.

End of DI-PSSS-81535A.

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the

Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

TABLE I. Contract Depot Maintenance (CDM) Production Report format.

CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date

(YYYYMMDD)

Part I

1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC

DURING REPORT PERIOD/TOTAL TO DATE

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL NUMBER

C.

CONTRACT

LINE ITEM

(CLIN)

D.

DOCUMENT/

VOUCHER

NUMBER

E.

QTY ON

CONTRACT

OR

DO/CALL

F.

REPARABLES

RECEIVED

G.

QTY

IND TO

WORK

H.

REPS ON

HAND

I.

QTY

PROD

J.

SERVICEABLES

SHIPPED

K.

SERV ON

HAND

L.

QTY

CONDEMNED

M.

FORECAST PROD

N.

REPORT DATE

FSC NIIN

1 2 1 2 3 1 2 1 2 1 2

Part II, Production Summary

End of DI-PSSS-81995.

Title: Technical Order Improvement Report and Reply Number: DI-TMSS-80229D Approval Date: 19991006 AMSC Number: F7356 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: F–MSG/ILMP Applicable Forms: AFTO Form 22 Use/relationship: a. This Data Item Description contains the format and content preparation in-structions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This item is applicable to contracts where the contractor is responsible for operating and main-taining Air Force centrally-acquired and managed equipment according to procedures in published TOs. Additional information and guidance is contained in TO 00-5-1, available through the Internet at http://www.pdsm.wpafb.af.mil/toprac/to-syste.htm under the link to “Technical Orders.”

c. This data item supersedes DI-TMSS-80229C.

Requirements:

1. Format. Paper or electronic format (EF) AFTO Form 22, Technical Order Improvement Report and Reply, or message/e-mail containing the same information. Electronic forms are available from the web site listed above.

2. Content.

2.1. REPORT DATE. The date the Improvement Report Number is assigned.

2.2. Block 1, TO (Major Command or Equivalent). The complete address of the Administrative or Procuring Contracting Officer (ACO/PCO).

2.3 Block 2, TO (T.O. Manager). The address of the TO Manager responsible for the deficient TO as indicated in the TO Index. (Addresses are available on the Air Force TO System Information Internet Page, http://www.pdsm.wpafb.af.mil/toprac/to-syste.htm.)

2.4. Block 3, FROM (Product Improvement Manager or Equivalent). The address of the reporting organization's Quality Assurance function which reviewed and approved the form for submission.

2.5. Block 4, TECHNICAL ORDER DATA. The Technical Order Number (Record Positions (rp) 6-30) and the Improvement Report Number (rp 31-45). Only one character is used in each position.

Rp 5 is left blank. Capital letters and slashed zeros ( /0) (if completing by hand) are used. Specific entry formats:

a. TECHNICAL ORDER NUMBER. The basic TO number (only) as it appears on the title page. Parentheses and dashes are used, but not blanks. Unused positions through rp 30 are left blank. When a change affects a TO supplement, the supplement’s number is referenced in block 11A.

b. IMPROVEMENT REPORT NUMBER. All positions (rp 31-45) are alpha-numeric char-acters (only). Rp 31 is a pre-printed “2.” Rps 32-33 will be “4N” to indicate contractor submission.

Rps 34-38 will be the contractor’s Commercial And Government Entity (CAGE) code number from the H4/H8 cataloging handbooks. Rps 39-40 may be used for internal identification or may be ze-ros. Rp 41 is the last digit of the calendar year. Rps 42-44 are the sequential numbers (starting with

“001”) of the reports submitted in the calendar year. Rp 45 indicates the urgency category of the report (E for Emergency, U for Urgent or R for Routine – see TO 00-5-1 for definitions).

2.6. Block 5, BASIC DATE OF T.O. The first date appearing on the lower right corner of the TO Title page.

2.7. Block 6, DATE/NO. OF CHANGE. The change number and date, if any, appear just under the TO's basic date on the title page. If there is no change listed, block 6 may be left blank or have N/A entered.

2.8. Block 7, PAGE NUMBER. The first page affected by the proposed change. Additional pages should be indicated in Block 11A. For work cards, the routine number and card number (e.g., TR3.1, Card 2 of 3).

2.9. Block 8, PARAGRAPH NO. The number of the paragraph to be changed or which precedes added material, the grid number for microfiche, or the System/Subsystem/Subject Numbers (S/S/SN) for manuals using this system. When multiple paragraphs are affected, the range (e.g., 5-1 thru 5-5).

2.10. Block 9, FIGURE NO. Used when illustrations or tables are involved. "Table" is used before the number if applicable.

2.11. Block 10, AFTO 22 TYPE. Two check boxes indicating whether the AFTO Form 22 is being submitted to make a Correction to the TO (see TO 00-5-1, para 5-2.1 for definitions), or an Im-provement to procedures or processes which, while correct as written, can be performed bet-ter/faster/cheaper/safer, etc.

2.12. Block 11A, BRIEF SUMMARY OF DEFICIENCY AND RECOMMENDED CHANGE (Use continuation sheet, if needed). Completed as follows:

a. For work package TO reports, the first entry in this block is "APPLICABLE TO WP NUM- BER xxxxx."

b. Identity of the military system when this is not included in the TO number. If not a system, identity of commodities by Mission/Design/Series (MDS) or Type/Model/Series (TMS) and Na-tional Stock Number (NSN) or part number. Omitted for general purpose Methods & Procedures TOs (MPTOs).

c. Brief description of the TO deficiency and reason for change. When appropriate, identity or copy attached of the source document for changes in voltage, part number and so forth.

d. The recommended changes worded as closely as possible to the exact language which should appear in the corrected TO. If the correction will require engineering research or extensive verification, the type of correction ("Add more in-depth fault isolation procedures.") and a statement such as "Unable to develop at local level."

e. Continuation sheets, if needed, shall show the improvement report number in the upper right hand corner of each sheet. (The EF version of the AFTO Form 22, available from the ACO/PCO, includes a continuation sheet with automatic entry of the improvement report number.)

2.13. Blocks 11B & 11C, SAVINGS/YR – DOLLARS and SAVINGS/YR – MANHOURS. These blocks are for rough order of magnitude (ROM) estimates of annual saving (in dollars and man-hours) resulting from the TO change recommendation. If minimal or no savings are anticipated, leave the blocks blank.

2.14. Block 12, REPORTED BY (Initiator’s Signature, Off Symb, Phone). Signature, printed or typed name, and office symbol of the individual reporting the problem or enhancement. Telephone number (Defense Switched Network (DSN) number preferred, if available) where individual can be contacted during normal duty hours.

2.15. Block 13, APPROVED BY (Supervisor’s Signature, Off Symb/DSN). Same as Block 12 for the initiator’s supervisor.

2.15. Block 14, PIM OR EQUIVALENT (Signature/Off Symbol/DSN). Same as Block 12 for the Product Improvement or Quality Assurance representative who reviews and approves the form for submission.

2.16. Blocks 16 & 17, TO. These blocks contain the same addresses as Blocks 1 and 3. They are auto-filled by the EF version of the form.

3. (Information Only).

3.1. Block 15, MAJOR COMMAND ACTION. Blocks 15A through 15C are left blank unless the reported improvement/correction could cause a change in contract scope or cost. In this case, the blocks are completed by the Procuring or Administrative Contracting Officer (PCO/ACO). Reports are routed through the weapon system’s or commodity’s Lead Command point of contact for review (Blocks 15D through 15F), unless specifically exempted by the Lead Command.

3.2. PART II, Blocks 19 thru 27. Completed by the government during evaluation of the improve-ment report.

End of DI-TMSS-80229D.

DI-MGMT-80503
DI-MGMT-81838
DI-NDTI-80809B
DI-PSSS-80727A
DI-PSSS-81534A
DI-PSSS-81535A
DI-PSSS-81995
DI-TMSS-80229D

File details come from the government source that posted it. Updated .