About this file

This is an exhibit document from the City of Covington, Georgia, detailing pavement replacement specifications for the Newton Drive Storm Drainage Improvements Project. The exhibit provides project-specific requirements for full-depth concrete roadway restoration work that contractors must follow when bidding on this solicitation. The project calls for an approximately 8-foot-wide restoration area using 8-inch Class B concrete in accordance with ITB specifications. A nonmandatory pre-bid meeting is scheduled for Thursday, September 8th, 2026 at 11:00 am at City Hall, located at 2194 Emory Street NW, Covington, GA 30014. Sealed bids must be delivered to the same address, attention Maranna Gilbert, no later than 10:00 am on Tuesday, October 13th, 2026, with bids opening at 10:15 am that same day. Additional information and the full Request for Bids may be accessed through the City's website at https://www.cityofcovington.org/index.php?section=business-opportunities.

A 5% Bid Bond is required with all bid submissions, and the awarded contractor must provide a Payment and Performance Bond equal to 100% of the contract value. The exhibit clarifies that the approximately 8-foot restoration width represents the finished roadway dimension rather than the required trench-excavation width, allowing contractors to determine necessary excavation width based on safety requirements. Concrete placed beyond actual trench limits forms part of the required bridge-cap and roadway-restoration area, and no asphalt surface course is required over full-depth concrete patches. Any over-width restoration caused by the contractor's means, methods, equipment, or over-excavation is considered incidental work unless the City authorizes additional work due to documented unforeseen conditions. The City reserves the right to reject any and all bids received.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B

CITY PAVEMENT REPLACEMENT DETAIL

Newton Drive Storm Drainage Improvements

Standard W19

PROJECT-SPECIFIC APPLICATION

The City of Covington Pavement Replacement Detail, Standard W19, is reproduced on the following page and is incorporated into the Contract Documents subject to the following project-specific requirements:

• Full-depth concrete roadway restoration: Provide an approximately 8-foot-wide restoration area using 8-inch Class B concrete in accordance with the written ITB requirements.

• Restoration width: The approximately 8-foot dimension is the finished roadway-restoration width, not a required trench-excavation width. The Contractor shall determine the excavation width needed to safely perform the work.

• Bridge-cap area: Concrete placed beyond the actual trench limits forms part of the required bridge-cap and roadway-restoration area.

• Concrete-only roadway patches: The asphalt-roadway provisions shown on Standard W19 do not apply to the designated full-depth concrete roadway patches. No asphalt surface course is required over those patches.

• Over-width restoration: Additional restoration caused by the Contractor's means, methods, equipment, or over-excavation is incidental unless the City authorizes additional work due to documented unforeseen conditions.

If a conflict exists between Standard W19 and the project-specific written requirements of the ITB, the project-specific written requirements of the ITB control.

Source: City of Covington 2024 Water/Sewer Standards Manual, Appendix A, Standard W19 (PDF page 139). The official detail is preserved on page 2 of this exhibit.