Exhibit B - ASR - Reno CRRC - Final.pdf
PDF 8 MB Posted
- Solicitation number
- 36C24W23R0068
About this file
This document package describes requirements for a new Community Resource and Referral Center (CRRC) facility in Reno, Nevada to replace an existing center. The solicitation is from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.
The package includes agency specific requirements for the delineated area, programs, administrative functions, site considerations, individual room requirements, signage needs, schedules of finishes, and infrastructure and IT specifications. It outlines the scope of space needed such as reception, group therapy rooms, clinical offices, exam rooms, showers, a kitchen, and more. It specifies materials, furnishings, equipment, and technical requirements in detail. The total estimated space is 13,497 square feet.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMUNITY RESOURCE AND
REFERRAL CENTER (CRRC)
RENO, NV
AGENCY SPECIFIC
REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements Schedule of Finishes, Infrastructure
Requirements, IT Requirements
VA Sierra Nevada Health Care System
TABLE OF CONTENTS
Delineated Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 5
Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 - 9
Administrative Requirements . . . . . . . . . . . . . . . . . . 10 - 20
Site Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 21 - 26
Room Requirements . . . . . . . . . . . . . . . . . . . . . . . . 27 - 119
Signage Requirements . . . . . . . . . . . . . . . . . . . . . .120 - 165
Schedule of Finishes . . . . . . . . . . . . . . . . . . . . . . . 166 - 172
Infrastructure Requirements . . . . . . . . . . . . . . . . .173 - 175
IT Requirements . . . . . . . . . . . . . . . . . . . . . . . . . .176 - 179
COMMUNITY RESOUCE AND
REFERRAL CENTER
AGENCY SPECIFIC REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements
Schedule of Finishes, Infrastructure
DELINEATED AREA
General Notes
This office’s Veterans Community is unique and requires access to multiple programs and services. Currently these programs and services are in various locations around the downtown area, including the medical center at Kirman Avenue. These programs and services include but are not limited to: Mental Health, Outreach, HUDVASH, PRRC, RANGE, Homeless Primary Care (H-PACT), employment services, rehabilitation and medication monitoring services, and access to laundry and shower.
Countless Veterans miss out on the full range of programs available to them due to these services being spread out. Some are unable or unwilling to visit the main campus.
In order to provide better continuity of care, VA Sierra Nevada Health Care System is requesting a new lease to be located within the boundaries provided in the map below.
This would allow all the programs and services offered to be collocated at one facility while allowing for easier access to services for this unique Veteran population.
Ideal location would be located along 4th Street just east of downtown with access to regular bus line service. Other considerations for location are proximity to the medical center located at 975 Kirman Avenue and ease of access. For the Veteran population served by this clinic, it is not preferred to be on the same block/immediately adjacent to a school or police station. Offered space may not be considered if located within 300 walkable feet (front door to front door) of the following establishments: firearm stores, shooting ranges, brothels, adult shops/cinemas, and gentleman’s clubs/strip clubs.
Offered space may not be considered if located within 100 walkable feet (front door to front door) of the following establishments: bar/clubs (except those within establishments that predominantly function as a restaurant), marijuana/CBD dispensaries, casinos, pawn shops, residential neighborhoods, and liquor stores.
Approximate Borders of Delineated Area:
North: N. McCarran Parkway
East: S. McCarran Parkway
South: S. McCarran Parkway
West: Keystone Ave extended to California Ave extended to Skyline Blvd.
Reference Map
Reno, Nevada, excerpt from Google Maps
AGENCY SPECIFIC REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements
Schedule of Finishes, Infrastructure
PROGRAM
ROOM
QTY
UNIT
AREA
NET
AREA
ROOM
CODE
GUIDE
PLATE
REF
GUIDE
PLATE
PAGE #
SIGN
TYPE
ROOM NOTES
Communication
Center/Reception
NSTA1
RECP1
Section 4-18 thru 4-21
IN-15.55
Minimum one counter at each location at
ADA/ABAA accessible height; open reception windows; furniture will be utilized in lieu of built-in counters
Nurse Station
NSTA1
RECP1
Section 4-18 thru 4-21
IN-15.55
Minimum one counter at each location at
ADA/ABAA accessible height; open reception windows; furniture will be utilized in lieu of built-in counters
Toilet, Public 2 60 120 TNPG1 TLTU1 Section 4-26 thru 4-29
IN-09.03
Include drinking fountains (high and low)
Toilet, Patient 4 60 240 TPG01 TLTU1 Section 4-26 thru 4-29
IN-09.03
Toilet, Non-Patient 2 60 120 TNPG1 TLTU1 Section 4-26
IN-09.03
Quiet Room 1 80 80 DAYR1 N/A N/A IN-07.05
Kitchen 1 150 150 IPK01 4.13 4-83 thru 4-
IN-04.03
Kitchen portion of guideplate only applies
Group Therapy 2 300 600 OPMH1 4.3 4-16 thru 4-
IN-07.05
Multipurpose
Classroom
1 485 485 CLR10 4.16
4-105 thru 4-
IN-07.05
Requires multiple in-floor power and data
Social Activities/
Dining/Multipurpose
1 485 485 SL001 4.12
4-76 thru 4-
IN-07.05 Adjacent to kitchen
CWT Workspace 1 160 160 OTGC1 N/A N/A IN-04.03 Requires power and data for 3 workstations
Office, Clinical 3 100 300 OFA09 4.5 4-30 thru 4-
IN-04.03
1 HCHV, 1 HUD VASH,
1 PRRC
Interview Rooms 10 100 1,000 OFDC1 4.5 4-30 thru 4-
IN-04.03
Same set up as Office, Clinical
AREA
NET
AREA
ROOM
CODE
GUIDE
PLATE
REF
GUIDE
PLATE
PAGE #
Workstations
2,576
OFA07
N/A
IN-04.03
(SIM)
6 PRRC, 3 VOC Rehab, 18 HCHV, 19 HUD
VASH; open office concept to be split among a few team rooms with audible isolation from hallway and other rooms similar to Exam Rooms (STC 45-
50); requires power and data placed appropriately to route through the furniture;
requires dedicated power and data for multi-function device in each team room
Workstation, Touchdown
2 36 72 OFA07 N/A N/A
IN-04.03
(SIM)
RANGE; separate from the Team Room
Staff Lounge 1 300 300 SL001 N/A N/A IN-04.03
Lockers, Changing 1 120 120 LR002 N/A N/A IN-04.03
Locker Area, Staff
Personal Property
1 60 60 LR004 N/A N/A IN-04.03
Lockers per Schedule of
Finishes
Waiting
WTG08
IN-11.02
8 people; requires backing, power, data and cable for wall-mounted monitor
Kiosk, Patient Check-
In
RECP4
IN-11.01
Adjacent to Waiting;
requires power and data for 1 kiosk
Workstation, Patient
Education
CLSC1
IN-11.01
Adjacent to Waiting;
requires power and data for 1 workstation
Height / Weight
Station 1 40 40 PEHW1 N/A N/A IN-04.03 Requires power for scale
Shower, Patient 8 70 560 SHPMH N/A N/A IN-04.03 All showers to be
ADA/ABAA accessible
Toilet, Patient 1 60 60 TLTU1 TLTU1 Section 4-26
IN-09.03 Adjacent to showers
Laundry
CLHLD
4 washers and 4 dryers;
adjacent to patient shower area
Exam Room 4 120 480
EXPA1
EXRG3
4.3A
7.1
33 thru 35
7-2 thru 7-6
IN-04.03
2 HPACT, 1 SMI PACT,
1 PRRC/RANGE/VOB
AREA
NET
AREA
ROOM
CODE
GUIDE
PLATE
REF
GUIDE
PLATE
PAGE #
Consult Room 1 120 120 OFDC2 4.7 4-43 thru 4-
Medication Room
MEDP1
MEDP1
Section 4-10 thru 4-13
Requires temperature and humidity control;
power and data for pyxis and medical refrigerators; no exterior openings
Utility, Soiled
USCL1
USCL1
Section 4-22 thru 4-25
Holding room only; no utility sink required; no exterior openings
Utility, Clean Supply
SRSE1
SRSE1
Section 4-2 thru 4-5
Requires temperature and humidity control;
power and data for two omni-cells; no exterior openings
Housekeeping Aids
Closet (HAC)
1 60 60 JANC1 JANC1
Section 4-6 thru 4-8
IT Closet 1 200 200 TETRI TETR1 4-84 thru 4-
Storage, General 2 100 200 SRS01 N/A N/A IN-04.03 1 Social Activities, 1 Occ
Therapy
Storage, Equipment 1 100 100 CLHS4 N/A N/A IN-04.03
Storage, Medical
Equipment
1 60 60 SRE01 N/A N/A IN-04.03
Workspace, Police
One-way glass that can oversee the entrance; no ability for up and over access from adjacent spaces
TOTAL NSF 9,998
DEPT NET TO
GROSS
1.35
TOTAL DGSF 13,497
AGENCY SPECIFIC REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements
Schedule of Finishes, Infrastructure
ADMINISTRATIVE
REQUIREMENTS
Tests and Inspections
Lessor may use their own documentation format/template for reporting out on required tests and inspections, however, the documentation must include ALL required information as specified in NFPA 101, 72, 99, Joint Commission, and any other applicable code requirement.
All tests and inspections must meet the attached Joint Commission criteria for the Life
Safety and selected Environment of Care (EC) standards. As these requirements may change over the course of the multi-year lease, any changes to these requirements will be forwarded to the Lessor. In addition, the following Joint Commission criterion on timing of inspections shall be adhered to:
• Weekly Inspections must be conducted on the same day of the week each week
• Monthly Inspections must be conducted on the same day of the same week each month
• Quarterly Inspections must be conducted within 10 calendar days each quarter
• Semi-annual Inspections must be conducted within 20 calendar days each 6 months
• Annual Inspections must be conducted within 30 calendar days each year
• Beyond Annual Inspections must be conducted within 45 calendar days
Fire Protection and Suppression Testing and Inspection: refer to requirements on attached
Joint Commission criteria for the Life Safety and selected Environment of Care (EC) standards. This includes but is not limited to fire sprinkler systems and fire alarm systems.
Fire Extinguishers:
• All required fire extinguishers and cabinets shall be provided by the Lessor
• Monthly fire extinguisher inspections are completed by the VA, CBOC Manager or designee
• Annual fire extinguisher inspections are to be completed by the Lessor as part of maintaining fire safety equipment
Fire alarm system shall be designed such that it is not affected by vacancies in adjacent spaces.
Emergency Power Systems are Maintained and Tested: refer to requirements on attached
Joint Commission criteria for the Life Safety and selected Environment of Care (EC) standards. This includes but is not limited to exit signs and emergency lights.
On-going Maintenance and Repairs
All preventative and corrective maintenance shall be performed by the Lessor if it was provided/installed by the Lessor, e.g. building systems, fixtures (light fixtures, plumbing fixtures, flagpole, etc.). Exceptions to this are the following on consumables:
• Ceiling tiles:
o If the tile is soiled, Lessor to replace since it is due to the building o If the tile is broken, VA will replace unless it was directly related to Lessor activity
• Light bulbs:
o Will be replaced by the VA o Ballasts or other light fixture issues to be repaired/replaced by the Lessor
Rounding with the Lessor or designee shall be conducted with the Contracting Officer’s
Representative (COR) every six months. The timing will be determined by the VA and will align 1-2 months prior to Environment of Care (EOC) rounds.
EOC rounds are conducted at lease sites semi-annually by the VA. Any EOC rounds findings shall be repaired or replaced within 10 calendar days of notification to the Lessor.
Emergency maintenance/repairs shall be completed same day.
High priority maintenance/repairs shall be completed within three calendar days.
Average priority maintenance/repairs shall be completed within 30 calendar days.
Low priority maintenance/repairs shall be completed within 60 calendar days.
If bugs and/or rodent issues are identified, the Lessor shall have a contractor onsite to mitigate within two calendar days.
If Lessor is unable to perform the maintenance/repairs within the above-referenced timeframes, the VA will fix/replace and bill the Lessor for the time and materials.
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Revised: November 29, 2017 - VHA 2/22/2018 to reflect items in VA-TJC agreement dated Sep 2017
The following pages present documentation required by the Hospital Accreditation program Life Safety (LS), and selected Environment of Care (EC) standards. The Life Safety surveyor will begin review of these documents soon after arrival for the onsite survey.
Surveyors may request other EC and LS documents, as needed, throughout thesurvey.
Organizations may want to consider using this tool in their continuous compliance and survey readiness efforts.
issue number from that document is identified in the right hand column below.
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 102
STANDARD - EPs See Legend
Document / Requirement Yes No C NC NA IOU
LS.01.01.01 Buildings serving patients comply with NFPA 101 (2012 2018 edition)
EP 1 Individual assigned to assess Life Safety Code® compliance
EP 2 Building Assessment to determine compliance with Life Safety Code®
EP 3 Current and accurate drawings w/ fire safety features & related square footage
a. Areas of building fully sprinklered (if building only partially sprinklered)
b. Locations of all hazardous storage areas
c. Locations of all fire-rated barriers
d. Locations of all smoke-rated barriers
e. Sleeping and non-sleeping suite boundaries, including size of identified suites
f. Locations of designated smoke compartments
g. Locations of chutes and shafts
h. Any approved equivalencies or waivers
EP 5 Deemed Hospitals: Documentation of inspections and approvals made by state or local AHJs
VA not “Deemed”
COMMENTS:
Issue #19
Issue #1
Document / Requirement
Addressed in policy?
Implemented as required?
C NC NA IOU Yes No Yes No
LS.01.02.01 Interim Life Safety Measures (ILSM)
EP 1 ILSM policy identifying when and to what extent ILSM implemented
EP 2 Alarms out of service 8 or more hours in 24 hours or sprinklers out of service more than 10 hours in 24 hours in an occupied building - Fire watch / Fire Dept.
notification
EP 3 Signs for alternate exits posted
EP 4 Daily inspection of routes of egress (See also 19.7.9.2 RE: daily inspections)
EP 5 Temporary but equivalent systems while system is impaired
EP 6 Additional firefighting equipment provided
EP 7 Smoke tight non-combustible temporary barriers
EP 8 Increased surveillance implemented
EP 9 Storage and debris removal
EP 10 Additional training on firefighting equipment
EP 11 Additional fire drill per shift per quarter
Issue #14
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 103
Document / Requirement
Addressed in policy?
Implemented as required?
C NC NA IOU Yes No Yes No
LS.01.02.01 Interim Life Safety Measures (ILSM)
EP 12 Temporary systems tested and inspected monthly
EP 13 Additional training on building deficiencies, construction hazards, temp measures
EP 14 Training for impaired structural or impaired compartment fire safety features
EP 15 Other ILSM's
STANDARD - EPs See Legend
Document / Requirement Yes No C NC NA IOU
EC.02.03.01 Hospital Manages Fire Risk – Fire Response Plan
EP 9 The written fire response plan describes the specific roles of staff and LIPs at and away from fire including
• When and how to sound and report fire alarms
• How to contain smoke and fire
• How to use a fire extinguisher
• How to assist and relocate patients
• How to evacuate to areas of refuge
Document / Requirement Frequency Q 1 Q 2 Q 3 Q 4/
Annual C NC NA IOU
EC.02.03.03 Fire Drills
EP 1 Fire drills once per shift per quarter: Health Care and Ambulatory Health Care (If available, please provide five quarters of fire drill data)
Quarterly
EP 2 Fire drills every 12 months from date of last drill: Business
Occupancies Annually
EP 3 When quarterly fire drills are required, ALL are unannounced
• Drills held at unexpected times and under varying conditions
• Drills include transmission of fire alarm signal andsimulation of emergency fire conditions
Quarterly
Issue #23
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 104
Document / Requirement Frequency Q 1 Q 2 Q 3 Q 4/
Annual C NC NA IOU
EC.02.03.03 Fire Drills
EP 4 Staff participate in the drills according to the hospital's fire response plan
YES NO
EP 5 Critiques include fire safety equipment and building features, and staff response
YES NO
Document / Requirement Frequency Q 1/ Semi
Q 2 Q 3/ Semi
Q 4/ Annual C NC NA IOU
EC.02.03.05 Fire Protection and Suppression Testing and Inspection
EP 1
Supervisory Signals-including: Control valves; pressure supervisory; pressure tank, pressure supervisory for a dry pipe
(both high and low conditions), steam pressure; water level supervisory signal initiating device; water temperature supervisory; and room temperature supervisory.
EP 2
Water flow devices Semiannually
Tamper switches Semiannually
EP 3 Duct, heat, smoke detectors, pull boxes Annually
EP 4
Notification devices (audible & visual), and door-releasing devices
EP 5 Emergency services notification transmission equipment Annually
EP 6
Electric motor-driven fire pumps tested under no-flow conditions Monthly
Diesel-engine-driven fire pumps tested under no-flow conditions Weekly
EP 7 Water storage tank high and low level alarms Annually
Semiannually
EP 8 Water storage tank low water temp alarms (cold weather only) Monthly (prior to heating season)
EP 9 Sprinkler systems main drain tests (at lead-in to buildings) on all Annually risers (Quarterly - where sole water source is through backflow preventer)
EP 10
Fire department connections inspected (Fire hose connections
N/A)
EP 11 Fire pump(s) tested – under flow Annually
EP 12 Automatic Standpipe flow test every 5 years 5 years
EP 13 Kitchen suppression semi-annual testing Semiannually
Issue #16
Issue #16
Issue #2
Issue #16
Issue #16
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 105
Document / Requirement Frequency Q 1/ Semi
Q 2 Q 3/ Semi
Q 4/ Annual C NC NA IOU
EC.02.03.05 Fire Protection and Suppression Testing and Inspection
EP 14 Gaseous extinguishing systems inspected (no discharge req.) Annually
EP 15 Portable fire extinguishers inspected monthly Monthly
EP 16 Portable fire extinguishers maintained annually Annually
EP 17 Fire hoses hydro tested 5 years after install; every 3 years thereafter
5 years / 3 years
EP 18
Smoke and fire dampers tested to verify full closure 1 year after install
At least every 6 years thereafter
EP 19 Smoke detection shutdown devices for HVAC tested Annually
EP 20 All horizontal and vertical roller and slider doors tested Annually
EP 25 Inspection and testing of door assemblies by qualified person
Fire doors are required to be inspected annually (NFPA 101, 8.3.3.3.1).
Doors in smoke barriers, doors in smoke partitions, and doors serving hazardous areas are also required to be inspected annually (i.e., doors that are required to be self- or auto-closing) (NFPA 101, 8.8).
Annually
EP 27 Elevators with fire fighters’ emergency operations are tested monthly. The test completion dates and results are documented.
(For full text, refer to NFPA 101-2012 2018: 9.4.3; 9.4.6)
EP 28 Documentation of maintenance testing and inspection activities for EPs 1-20 and 25 includes: activity name; date; inventory of devices, equipment or other items; frequency; contact info for person performing activity; NFPA standard; activity results
NFPA 101
New EP
Issue #16
STANDARD - EPs See Legend
Document / Requirement Frequency YES NO / Missing Date
C NC NA IOU
EC.02.04.03 Medical equipment inspection, testing and maintenance
EP 10 All occupancies containing hyperbaric facilities comply with construction, equipment, administration, and maintenance requirements of NFPA 99-2012 2018: Chapter 14.
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 106
Document / Requirement Frequency YES NO / Missing Date
C NC NA IOU
EC.02.05.01 Manages risks associated with utility systems
EP 5 Identifies activities and associated frequencies, in writing, for inspecting, testing, and maintaining all operating components of utility systems on the inventory. These activities and associated frequencies are in accordance with manufacturers’ recommendations or with strategies of an alternative equipment maintenance (AEM) program.
Note 1: The strategies of an AEM program must not reduce the safety of equipment and must be based on accepted standards of practice. * Note 2: For guidance on maintenance and testing activities for Essential Electric Systems (Type I), see NFPA 99-2012: 6.4.4. 2018:
6.3.4 Footnote *: An example of guidelines for physical plant equipment maintenance is the American Society for Healthcare Engineering (ASHE) book Maintenance Management for Health Care Facilities.
EP 14 Minimizes pathogenic biological agents in cooling towers, domestic hot and cold-water systems, and other aerosolizing water systems.
For hospitals that use Joint Commission accreditation for deemed status purposes the following policies, procedures and reports will be reviewed:
• Facility risk assessment to identify where Legionella and other opportunistic waterborne pathogens could grow and spread in the facility water system
• Water management program that considers the
ASHRAE industry standard and the CDC toolkit
• Testing protocols and acceptable ranges for control measures o Documented results of testing o Corrective actions taken when control limits are not maintained
VA not “Deemed”
EP 15 In critical care areas designed to control airborne contaminants
(such as biological agents, gases, fumes, dust), the ventilation system provides appropriate pressure relationships, air-exchange rates, filtration efficiencies, temperature and humidity.
(form of and frequency of assessment per hospital policy)
Note: For more information about areas designed for control of airborne contaminants, the basis for design compliance is the Guidelines for Design and Construction of Health Care Facilities, based on the edition used at the time of design (if available).
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 107
Document / Requirement Frequency YES NO / Missing Date
C NC NA IOU
EC.02.05.07 Emergency Power Systems are Maintained and Tested
EP 1 Battery powered egress lights tested monthly – 30 seconds; visual inspection of EXIT signs
Monthly
EP 2 Battery powered egress lights tested annually – 90 minutes; or replace all batteries every 12 months and during replacement, perform random test of 10% of all batteries for 1 ½ hours
EP 3
Functional test of Level 1 SEPSS, monthly; Level 2 SEPSS, quarterly, for 5 minutes or as specified for its class Annual test at full load for 60% of full duration of its class
Monthly
Note 1: Non-SEPSS tested per manufacturer’s specifications Per Mfr.
Note 2: Level 1 SEPSS defined for critical areas and equipment
Note 3: Class defines minimum time which SEPSS is designed to operate at rated load without recharging
EP 4 Emergency power supply system (EPSS) inspected weekly, including all associated components and batteries
Weekly
EP 5 Emergency generators tested monthly for 30 continuous minutes under load (plus cool-down)
Monthly
EP 6 Monthly load test for diesel-powered emergency generators conducted with dynamic load at least 30% of nameplate rating or meets mfr. recommended prime movers’ exhaust gas temperature;
OR
Monthly
Emergency generators tested once every 12 months using supplemental loads of 50% of nameplate rating for 30 minutes, followed by 75% of nameplate rating for 60 minutes for total of 1 ½ continuous hours
Annually
EP 7 All transfer switches monthly/12 times per year Monthly
EP 8 Fuel quality test to ASTM standards Annually
EP 9 Generator load test once every 36 months for 4 hours 36 Months
EP 10 Generator 4 hour test performed at, at least 30% nameplate 36 Months
This Joint Commission document has been further revised 2/22/2018 to incorporate VHA requirements per the “George Mills Concurrence on 23 Issues, effective 4-Sep-2017 “ document. The
Life Safety and Environment of Care – Document List and Review Tool Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revised Nov 29, 2017 by TJC; and by VHA 2/22/2018
Copyright: 2018 The Joint Commission Organization Guide, January 2018 108
Document / Requirement
THIS MAY BE SCORED AS CONDITIONAL OR
STANDARD
C NC NA IOU YES NO
EC.02.05.09 Medical Gas and Vacuum Systems are Inspected and Tested
EP 1 Test, inspect and maintain critical components of piped medical gas systems: Source, distribution, master panels, area alarms, automatic pressure switches, shut-off valves, flexible connectors and outlets
No prescribed frequency; recommend risk assessment if < annual
Per policy
EP 2 Location of and signage for bulk oxygen systems On Bldg. Tour
EP 3 Emergency oxygen supply connection On Bldg. Tour
EP 4 Review medical gas installation/modification/breech certification results for cross connection, purity, correct gas, and pressure As applicable
EP 5 Medical gas supply and zone valves are accessible and clearly labeled On Bldg. Tour
EP 6 Handling, transfer, storage, labeling, transfilling of cylinders Per policy
Legend: C=Compliant; NC=Not compliant; NA=Not applicable; IOU=Surveyor awaiting documentation
Revision: 11/29/2017 by TJC and by VHA 2/22/2018
COMMUNITY RESOURCE
AND REFERRAL CENTER
AGENCY SPECIFIC REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements
Schedule of Finishes, Infrastructure
SITE REQUIREMENTS
General Notes
Site work and amenities shall conform to VA standards in regards to items such as flag poles, exterior signage, and physical security requirement protection.
Environmental Compliance
The following references should be consulted to ensure environmental compliance of the lease site.
• VA’s NEPA Implementing Regulations – 38 CFR Part 26
• NEPA law and implementing regulations, including but not limited to:
o NEPA of 1969, as amended
▪ Public Law [Pub.L.] 91-190
▪ 42 United States Code [U.S.C.] 4321-4370F o Council on Environmental Quality (CEQ) regulations implementing NEPA
▪ 40 Code of Federal Regulations [C.F.R.] Parts 1500-1508
Parking
Provide total 75 parking spaces, available for VA use at all times. Of the 75, provide five handicap parking stalls with aisles on both sides complying with ABAAS and per the attached standard detail “Parking Stall Layout”. This will allow sufficient parking for all VA staff at the site, 8-10 GOV vehicles for staff use, and parking for visitors/patients. For the
GOV spaces, provide a “Reserved for GOV” sign.
Bike Racks and Lockers
Provide bike rack(s), enough to accommodate 10 bikes.
• Bike Rack Location(s):
o Provide ample clearance between racks and curbs, buildings, etc. to allow free movement of the bike o Provide at least 5 feet of unobstructed clearance to utilities, loading zones, or handicapped parking spaces o Be at least 15 feet from any fire hydrant o Be at least 50 feet from building entrances o Be at least 60 feet from any bus stops or shelters o Place bike parking in a highly visible, well-lit, safe area on the site o Locate rack(s) so that parked bicycles don’t block the pedestrian path o Bike parking should be convenient to the building entrance(s) and street access, but away from normal pedestrian and auto traffic o Avoid locations that require bicycles to travel over stairs o Separate bicycle parking, auto parking, and road areas with space and a physical barrier preventing motor vehicles from damaging parked bicycles
• Bike Rack Specifications:
o Rack must be constructed of steel pipe or tubing, round or square, and be securely anchored to an immoveable level surface o Rack must provide support for the bicycle frame by holding it upright and allowing at least two points of contact for locating a cable or U-shaped lock o Prevent the wheel of the bicycle from tipping over o Enable the frame and one or both wheels to be secured o Support bicycles without a diamond-shaped frame with a horizontal top tube o Not bend wheels or damage other bicycle parts o Accommodate a wide range of bicycle shapes and sizes o Be simple to operate o Not include protruding bars that could trip or injure cyclists or pedestrians o Provide access area of minimum 4 feet 6 inches at each end of the rack(s)
• Bike Rack Type:
o Keep racks simple; “staple” style or similar preferred o Vertical wall-mounted racks are an alternative to horizontal racks and may be acceptable if there is ample wall space o Bike corrals can be installed in standard parking space footprints, 10 bikes in place of one car
• Avoid the Following:
o “Comb” style racks: does not allow the bike frame to be readily secured o “Wave” style racks: not ideal as they can be confusing to use and frequently used incorrectly, limiting capacity o “Toast” style racks: designed to only secure wheels, not frames o Very low bar-type racks: can be a hazard to pedestrians o Hiding racks in concealed, less public, or back of house areas o Placing racks too close to buildings, plants, walkways, etc. thus preventing easy access to parking
Provide four bike lockers with the following specifications:
• Interlocking modular bicycle storage system
• Bank of lockers to include two end panels for two outside lockers
• Inside lockers to be interlocking
• Each unit must include double door entry with a diagonal partition that creates two triangular stalls
• Secures one bike per door
• Total of two, double door units to hold four bikes
• Materials: high strength material that will not crack, dent, warp or corrode under normal exterior conditions; rust free; impact resistant; flame resistant V-1 rating;
graffiti/UV resistant paint finish; color finish to be pale gray such as Gibraltar Grey
RAL 7047; vandal resistant; flame resistant V-1 rating
• Requirements for V-1 Rating:
o The specimens may not burn with flaming combustion for more than 30 seconds after either application of the test flame o The total flaming combustion time may not exceed 250 seconds for the 10 flame applications for each set of 5 specimens o The specimens may not burn with flaming or glowing combustion up to the holding clamp o The specimens may not drip flaming particles that ignite the dry absorbent surgical cotton located 300 mm below the test specimen o The specimens may not have glowing combustion that persists for more than 60 seconds after the second removal of the test flame
• Locks: purchase with pad lockable swing handle to secure user supplied padlock or bicyclist U-lock
• Ability to change lock system to digital access in the future to any of the following options: alarm lock with proximity smart card; blue tooth cellular access to reserve, access and lock unit with use of smart phone, end use of locker with a click, locker user can be contacted by phone or text messaging
• Secure to concrete pad as recommended by the manufacturer
• Features to include:
o Must be made in the USA o Lockers to be relocatable, expandable and interlocking o Resistant to seasonal climate changes o 10-year warranty and favorable 30-year lifespan history
• Location: convenient to the front entrance; to be approved by the VA during design
Flagpole
Flagpole must be provided on the property in accordance with VA Criteria. Contractor shall provide all labor, materials and equipment necessary to accomplish the installation of an exterior light to illuminate the American flag located outside the clinic site. The light shall properly illuminate the flag and be controlled by a power circuit located within the clinic.
The feed from the clinic to the light shall be buried below ground and the conductors shall be enclosed in exterior rated conduit. Specifications:
• Overall length: 23 feet
• Exposed height: 20 feet
• Top diameter: 3”
• Butt diameter: 5”
• Wall thickness: .125”
• Flagpole weight: 92 lbs
• Max unflagged wind speed: 250 mph
• Max flagged wind speed: 120+ mph
• Cast aluminum revolving truck assembly stainless steel bearing concealed inside a cylindrical hood
• Stainless steel aircraft cable halyard
• Two chrome plated swivel bronze snap hooks
• Plastic covered counterweight with beaded sling
• Internal winch with removable hand crank
• Machine spun aluminum flash collar
• 16 gauge galvanized corrugated ground sleeve
AGENCY SPECIFIC REQUIREMENTS
Delineated Area, Program, Administrative
Requirements, Site Requirements, Room
Requirements, Signage Requirements
Schedule of Finishes, Infrastructure
ROOM REQUIREMENTS
General Project Description
The information contained in this package is for a 13,496 – 15,520 ABOA building tenant improvement or build-to-suit to replace the existing Community Resource and Referral
Center.
The Facility Guidelines Institute’s Guidelines for Design and Construction of Hospitals and
Outpatient Facilities, latest edition, shall be used as the primary standard for design and construction of VA leased facilities.
VA leased facilities are required to incorporate all applicable Joint Commission requirements.
The design and construction shall follow all State and local building codes and regulations.
Occupancy Groups & Exiting
The occupancy of the requested lease will be Office, Group B occupancy as defined by the VA-adopted edition of the International Building Code and NFPA 101.
General Notes
Per HIPPA, patient confidentiality must be maintained when providing personal information to interview clerks and/or other staff, particularly at the main entrance Check-in/Reception counter and Waiting areas. The facility Privacy Officer will review the submitted layouts and make recommendations to assure the highest level of patient confidentiality is provided at these critical areas.
Room Size Tolerances: allowable room size variance from stated program requirements is +/-5%.
Room Naming Conventions: meet with VA stakeholders to develop room naming conventions prior to finalizing design.
Provide a minimum clear dimension of six feet (6’-0”) in all hallways to accommodate the passage of two wheelchairs. Some circumstances in the design of a facility may require a greater clear hallway dimension for patient safety and functionality.
Refer to the Infrastructure Requirements section for specific information on building systems including mechanical, electrical, and plumbing. Refer to the Physical Security
Requirements section for specific information on security camera system specifications and installation, electronic door hardware, and other physical security aspects.
Partitions
Sound protection must comply with provided STC ratings shown on room criteria. Wall details must be submitted for review by VA for STC rating compliance.
Doors and Hardware
All doors and hardware shall be designed in accordance with VA criteria: PG-18-14 Room
Finishes, Door, and Hardware Schedule. Below are facility requirements for specific components.
Contractor to provide a keying system which matches the existing Medeco XT system currently in use at the main facility campus (https://www.medeco.com/en/products/).
Cores to be built by the contractor to VA requirements and turned over to the VA for install.
All locksets shall be mortise type. Mortise lockset Stanley Part #BES45H7A15S626AM, modified as necessary to fit the specific required function of the lockset.
Use door closers only where required by code and/or VA criteria, unless noted otherwise.
For future flexibility for storage rooms, all storage rooms shall be equipped with door closers. Door closers should not be allowed to stay open in the door’s fully open position.
Facility standard for door closers are as follows:
• Closer with fire alarm connection: LCN 4040 SE Arm STD
• Closer without fire alarm connection: LCN 4040 XP w/ LCP super smooth
4040H or LCN 4041 SHCUSHAL
Doorstops shall be provided for all doors, even on automatic doors.
Provide card reader system for the clinic. Card reader locations to be determined during design. System shall be compatible with the existing facility system Lenel United
Technologies, including but not limited to LNL-2220 Intelligent Dual Reader Controller, LNL-1320 Series 2 Dual Reader Interface Module, LNL-1100 Series 2 Input Control
Module. It is anticipated that one to four doors will be set up on the card reader system, including the door to the IT Closet. Provide all cabinets, power supplies, door contacts, and other hardware and software associated with this system.
Security Cameras
Provide security camera system with up to 12 cameras located strategically throughout the site to cover both the interior and exterior environment. System should feed to a monitor in the Police workspace. Camera locations and capabilities to be reviewed by VA
Police during design.
http://www.medeco.com/en/products/)
Furniture, Fixtures, and Equipment
The following furniture, fixtures, and equipment will be purchased and installed by the VA:
• Furniture including cubicle panels, workstations, chairs, tables, benches, file cabinets, storage cabinets, bookcases, lamps, stools
• Kitchen equipment including refrigerators, microwaves, coffee makers
• Medical equipment including exam tables, medication dispensing, medical supply dispensing, racks/shelves, blood pressure monitors/sphygmomanometers, sharps containers, carts, glove dispensers, scales, ophthalmoscope/otoscopes, telehealth monitors, hampers, chart holders, IV stands, paper cup dispensers
• Wall mounted accessories including whiteboards, TVs and mounting brackets, clocks, coat hooks
• Cubicle curtains
• Floor care equipment including vacuums, floor scrubbing machines, carts
• IT accessories including desktops, laptops, printers, monitors, keyboards, mice, phones, video conference equipment
• Cleaning accessories including soap dispensers, hand sanitizer dispensers, paper towel dispensers
• Trash bins
• Washers and dryers
• Artwork
All wall mounted items listed on the room requirements and not listed as VA purchased/installed above, to be purchased/installed by the Contractor including, but not limited to, seat cover dispensers, mirrors, grab bars, mop racks, built-in shelving.
All ceiling mounted items listed on the room requirements to be purchased/installed by the
Contractor including, but not limited to cubicle curtain tracks.
Room Templates Disclaimer
Room templates are a critical component to VA Technical Information Library (TIL) which provides standards for all VA planning, design, and construction projects. Room templates are department and room aligned criteria describing space, room contents, and other technical requirements for the development of VA projects. Room templates communicate the Basis of Design (BOD) and are required to be utilized by project teams working on new construction and renovations of existing facilities. The material contained in the room template constitutes a standard for VA planning, design, and construction. Any substantial variance from standards shall be considered only as required to accommodate specific site, functional, and operational conditions. Each substantial variance shall have a basis of rationale and be documented in the project record.
Clinicians, Providers, primary users, and other stakeholders shall be involved in project specific development of room templates and BIM test-fits to best adapt standards for specific functional, operational, and site conditions and to provide optimum services environments for Veterans. Stakeholder involvement and requirements shall be documented in the project record.
Room templates are not project-specific. Site specific issues must be addressed with the context of VA standards and applied to each individual project. Use of this room template does not preclude the need for, nor absolve planners, designers, and constructors of their responsibility to provide compete, functional, safe, and secure designs suited to the unique requirements of each project.
Equipment and systems are shown in an illustrative, performance-based format and are not intended to depict, suggest, or otherwise constitute endorsement of any specific product or manufacturer. Manufacturers should be consulted for actual dimensions, configurations, and utility requirements.
References
All room requirements are excerpts from the graphical design guides on the VA Office of
Construction & Facilities Management Technical Information Library (TIL) located at:
https://www.cfm.va.gov/til.
NOTE: Applicable TIL standards will be upheld unless noted otherwise in this document.
Design Guides referenced within this document include:
Mental Health Facilities
Mental Health Outpatient Services
Patient Aligned Care Team (PACT)
Ambulatory Care (Hospital Based)
Office of Information and Technology
Additional references available on the TIL that should be consulted for requirements include, but are not limited to, the following:
Design Criteria
Architectural Accessibility, Barrier Free Design
Design Guides (PG-18-12)
Design Manuals (PG-18-10)
Physical Security and Resiliency *Applicable sections only; per section
1.4.6 VA Leased Facilities, “The implementation of physical security for leased facilities is to comply with the Interagency Security Committee (ISC) http://www.cfm.va.gov/til
Risk Management Process. Leased facilities are not required to comply with physical security and resiliency requirements in this manual.”
Signage and Wayfinding
Standard Details
PG-18-1 Master Construction Specifications
PG-18-3 Design and Construction Procedures
PG-18-4 Standard Details and CAD Standards
PG-18-10 Architectural Design Manual
PG-18-13 Barrier Free Design Standard (included as part of this section)
PG-18-14 Room Finishes, Door, and Hardware Schedule
VA Barrier Free Design Standard
A Supplement to the Architectural Barriers Act Accessibility Standards (ABAAS)
PG-18-13
January 1, 2017 rev 11/1/18
Office of Construction & Facilities Management Facilities Standards Service
PG 18-13 - VA BARRIER FREE DESIGN STANDARD January 1, 2017 rev 11/01/2018
VA Barrier Free Design Standard
The Architectural Barriers Act (ABA) insures that buildings financed with federal funds are so designed and constructed as to be accessible to everyone. This law requires all construction, renovation, or leasing with federal funds to meet the Architectural Barriers Act Accessibility Standard (ABAAS). ABAAS was made effective May 9, 2006 for new construction and alterations, June 30, 2006 for lease-construction facilities, and February 7, 2007 for all other leased facilities. ABAAS replaces the Uniform Federal Accessibility Standards (UFAS), which was VA’s previous standard for accessibility.
This supplement to ABAAS tailors some of the requirements to better meet the barrier free needs of the Department of Veterans Affairs (VA) in its facilities.
Previous requirements have been simplified and abbreviated so that these six pages replace the former 26-page VA Barrier Free Design Handbook (H-08-13).
The following comparison tables are to assist contracted Architect/Engineer firms and VA staff in designing accessible facilities for the VA. Paragraph numbers correspond to ABAAS paragraph numbers.
Planners and designers are to be guided by ABAAS, the exception being where the more stringent VA requirement is noted in the tables.
Minimum Requirements
REQUIREMENT VA ABAAS NOTES
Sites - parking spaces accessible 1% greater than ABAAS 1
SCI/D Facilities 0.2 accessible spaces per Inpatient bed; 0.5 per Long- Term Care bed; 5.6 per Outpatient Exam Room.
Dedicated for SCI/D patients
Hospital Outpatient Facilities
Rehabilitation and Outpatient Physical Therapy Facilities
10% of total spaces
20% of total spaces
10% of total spaces
20% of total spaces
Buildings- accessible seating, assembly areas
1% greater than ABAAS 2
VA GUIDELINES ARE THE SAME AS ABAAS FOR MOST REQUIREMENTS.
WHERE VA REQUIREMENTS DIFFER, SEE BELOW.
http://www.access-board.gov/ada-aba/aba-standards-gsa.cfm http://www.access-board.gov/ufas/ufas-html/ufas.htm http://www.access-board.gov/ufas/ufas-html/ufas.htm
Accessible Route
Width, min. Patient Care Areas 1800 mm (6'-0") 900 mm (3'-0") 3
Width, min. Administrative Areas 1500 mm (5'-0") 900 mm (3'-0") 3
Slope, maximum (including parking spaces)
1:33 (3%) 1:20 (5%) 4
Minimum gradient of walk requiring rest areas every 60 000 mm (200')
1:50 1:33 5
Turning Radius 1650 mm (5’-6”) 1500 mm (5’-0”) 31
Turning Radius, Bariatric 1800 mm (6’-0”) 1500 mm (5’-0”) 31
Floor Surfaces
REQUIREMENT VA ABAAS NOTES
Changes in level Not permitted on SCI floors No requirement 6
Carpet cushion or padding Not permitted Permitted
Parking and Passenger Loading Zones
REQUIREMENT VA ABAAS NOTES
Access aisle requirement for accessible parking spaces
1500 mm (5'-0") each side 1525*mm (5'-0") 1 per 2 spaces.
Passenger loading area "communication system" for assistance at SCI units
Yes No requirement 9
Curb Ramps
REQUIREMENT VA ABAAS NOTES
Width, minimum 1200 mm (4'-0") 900 mm (3'-0") 10
Ramps
REQUIREMENT VA ABAAS NOTES
Maximum slope 1:20 1:12 11
Maximum length, within range of 1:33 -1:26
12 000 mm (40' ) 60 000 mm (200') 12
Maximum length, within range of 1:25 -1:20
10 500 mm (35' ) 60 000 mm (200') 12
Minimum clear width 1200 mm (4'-0") 900 mm (3'-0") 13
Minimum size level landing, where doors swing into landing
1800 mm x 1800 mm (6'-0" x 6'-0")
1500 mm x 1500 mm (5'- 0" x 5'-0")
Stairs
Handrail height 850 mm (34") 750 mm-850 mm (30”-34")
Elevators (Passenger)
REQUIREMENT VA ABAAS NOTES
Minimum width of elevator doors 1200 mm (4'-0") 900 mm (3'-0") 16
Minimum car size 2400 mm x 1850 mm (8'-0" x 6'-2") platform size
1730*mm x 1370*mm (68" x 51") car inside dimensions
Double set of handrails Yes No requirement 18
Windows
REQUIREMENT VA ABAAS NOTES
Sill height in patient bedrooms 600 mm (24") maximum No requirement 19
Doors and Doorways
REQUIREMENT VA ABAAS NOTES
Patient Care Delivery Areas with patient bed, stretcher or gurney access, minimum width
1200 mm (4' -0") 1100 mm (3' - 8") 20
Water Closets
REQUIREMENT VA ABAAS NOTES
Grab bar configuration Double swing-up bars for all patient toilets/shower rooms on Nursing Units
Side & back bars for all accessible water closets.
Toilet Stalls
Minimum accessible stall size 1650 mm x 1800 mm (5'-6" x 6'-0")
1500 mm x 1420*mm (5'- 0" x 4'-8")
Minimum size wheelchair "front-transfer" stall
1050 mm x 1800 mm (3'-6" x 6'-0")
900 mm x 1650 mm (3'-0" x 5'-6")
Grab bars Required in all stalls Required in accessible stalls
Shower Stalls (Patient)
Minimum stall dimensions 1200 mm x 1200 mm (4'-0" x 4'-0")
900 mm x 900 mm (3'-0” x 3'-0”) or 750 mm x 1500 mm (2'-6" x 5'-0”)
Grab bars Horizontal plus vertical bars Horizontal bars only 30
Toilet Rooms
REQUIREMENT VA ABAAS NOTES
Inpatient Bedroom Toilet Rooms, Minimum width of toilet room entrance doors
1200 mm (48") 850 mm (34") 24
Cafeterias
REQUIREMENT VA ABAAS NOTES
Knee clearance, for minimum 5% tables
675 mm (2'-3") and 725 mm (2'-5") for at least 5%
675 mm (2'- 3") 26
Cutlery and supply height 1000 mm-1200 mm (40" - 48")
1350 mm (54") max. 27
Health Care Facilities
REQUIREMENT VA ABAAS NOTES
Medical/Surgical Nursing Units, percent of patient bedrooms accessible
100% 10% 28
Medical/Surgical Nursing Units, percent of toilet rooms accessible
100% 10% 28
*ABAAS indicates slightly different metric equivalents than the ones which VA has adopted.
Information gathered from data provided by the Department of Health and Human Services; the National Center for Health Statistics; and the Department of Veterans Affairs, Office of Planning and Management Analysis (see SURVEY OF DISABLED VETERANS, OPMA-M 043-90-1).
1. The percent of disabled at VA hospitals is much higher than the percent of disabled in the general population. Two percent may be adequate for the general population. The percentage of disabled drivers/passengers is much higher in the veteran population. ABAAS Table 208.2 shows varying accessible parking space requirements. 1 out of every 6 accessible parking spaces shall be a van accessible parking space. Other VA Hospital service lines may have different requirements.
2. A higher percentage of sick and disabled make up the VA population than make up the general population. ABAAS Table 221.2.1.1 shows varying wheelchair space requirements in assembly areas.
3. It takes a minimum of 1500 mm (5’-0”) for two wheelchairs to pass. Wheelchairs have increased in size in recent years, so 1800 mm (6’-0”) is recommended for Patient Care Delivery Areas where wheelchair usage is commonplace.
4. The disabled population used by ABAAS to determine an acceptable slope for using public accommodations is stronger and younger than are veterans at VA facilities.
5. Previous studies used a younger, more fit, population to determine the minimum slope and distance for a disabled person’s travel capability.
6. Current standards are based on an active, independent…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .