Exhibit B 2025.docx
DOCX document 60 KB Posted
- Solicitation number
- RFP IHHA 2026000244 1
- Issued by
- Pueblo County, Colorado
About this file
Exhibit B is a Price Work Sheet associated with the SDFM Water Treatment Chemicals bid RFP solicitation in Colorado. The document outlines the cost structure for boiler plant and cooling tower system services, including line items for system checks, monitoring, required testing, equipment usage costs, and material/chemical costs for each system. Additional bid items include training with health and safety components, disposal fees if applicable, and miscellaneous cleaning and maintenance services. Bidders are required to provide monthly costs for each line item, with a separate calculation for one-time mobilization costs and transition fees related to setting and fine-tuning equipment to meet site requirements and coordinating the transition from existing equipment to the chosen vendor's equipment.
The pricing structure requires bidders to calculate a total cost for the first year inclusive of one-time fees. The worksheet provides designated spaces for bidders to enter per-month costs for each service category, one-time mobilization fees, additional fees, and transition fees. This comprehensive cost table format enables the evaluating agency to compare total year-one pricing across competing bids while maintaining visibility into the recurring monthly service costs and non-recurring expenses associated with implementing and transitioning to the selected vendor's water treatment chemical services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final Water Treatment Chemicals SDFM RFP .docx | DOCX document | |
| Exhibit D Contract Template, Terms & Conditions v 4.13 Final Locked.docx.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
Price Work Sheet
EXHIBIT B, TABLE 1 – COST TABLE
In the following table list the cost of each item and what it will cost per month:
| Bid Item |
| Per month Cost |
Boiler Plant Requirements: System Checks, Monitoring and Required Testing
Boiler Plant Equipment Usage Cost
Boiler Plant Material/Chemical cost
Cooling Towers Requirements: System Checks, Monitoring and Required Tests
Cooling Tower Equipment Usage Cost
Cooling Tower Materials/Chemical Cost
Training including Health and Safety
Disposal Fees, if applicable
Misc. Cleaning and Maintenance
TOTAL
One time Mobilization Cost: $_______________________________________________________________________________ Additional Fees: $_____________________________________________________________________________________________ Transition fee, setting and fine tuning all equipment to meet site requirements, coordinating the transition of existing equipment to chosen vendors equipment.
Total Cost (First year with one-time fees): $ ______________________________________________________________
Exhibit B, Rev 7/2025 Page 1 of 2
File details come from the government source that posted it. Updated .