Exhibit_B-1_Rate_Sheet.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
C5613296-D, Rebid 1 Crane Rental and Operator Services
Solicitation number
0000040614
Issued by
California

About this file

Exhibit B-1 Rate Sheet Summary

This rate sheet document supports the Master Agreement for Crane Rental and Operator Services between the State of California Department of Corrections and Rehabilitation (CDCR) and qualified contractors. The agreement establishes a framework through which the Contractor provides crane rental equipment and licensed operator services to CDCR facilities identified in Exhibit E, with compensation determined by rates specified in this rate sheet. The services encompass equipment rental, operator labor, transportation logistics including travel and per diem, fuel, mileage, materials, supplies, tools, and all incidental expenses necessary for service delivery at participating CDCR locations throughout California.

The rate sheet establishes the pricing structure through which all costs—labor, personnel, transportation, materials, supplies, tools, equipment, permits, licenses, taxes, fees, and shipping charges—are incorporated into the quoted rates. As a Master Agreement, this procurement allows CDCR to request crane services on an as-needed basis from the awarded contractor(s) at the predetermined rates specified in the exhibit. The rates serve as the basis for compensation across all CDCR participating locations, ensuring cost consistency and transparency throughout the contract term. This rate structure eliminates the need for individual rate negotiations for each service request submitted by CDCR facilities.

View the file

Other files

File Type Posted
Bid_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CRANE RENTAL AND OPERATOR SERVICES

Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.

The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel and per diem), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide the identified services.

Bidders may bid on one or more locations and/or Groups. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. For Grouped locations, bidders must bid on all locations and items within that Group. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location and/or Group. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.

Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.

Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.

Each participating location’s total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder’s service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1, Rate Sheet.

All CDCR estimated quantities and Contractor provided rates are for the entire term of this Agreement.

Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt =
*In the event of tie bids, CDCR reserves the right to determine the bidder entitled to the contract award based on the percentage of discount. If not applicable or a discount tie, a coin toss or lot drawing will be used in accordance with the Invitation for Bid, Basis for Award.
*Rate per Hour excludes Mobilization/Demobilization.

**Overtime services will be paid at 150% of normal hourly rate.

***Mobilization/Demobilization fee includes all portal to portal fees, travel time, set-up, breakdown, excludes rigger charges. Total IN and OUT.

****Rigging Charges excludes Mobilization/Demobilization

There are no guarantees that any services will be requested from this agreement.

&"Arial,Regular" California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1 Exhibit B-1

&"Arial,Regular"Page &P of &N

CAL

CALIPATRIA STATE PRISON (CAL)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)50X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)50X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)10X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)10X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)5X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges70X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CAL TOTAL BASIS OF AWARD (A+B) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

CAL-CCM

CALIPATRIA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CAL-CCM)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)42X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)45X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)42X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)43X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)43X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges30X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CAL-CCM TOTAL BASIS OF AWARD (A+B) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

CEN

CENTINELA STATE PRISON (CEN)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)60X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)60X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)20X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)10X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)10X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges36X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CEN TOTAL BASIS OF AWARD (A+B) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

CEN-CCM

CENTINELA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CEN-CCM)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)42X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)45X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)42X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)43X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)43X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges30X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CEN-CCM TOTAL BASIS OF AWARD (A+B) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

CHCF-CCM

CALIFORNIA HEALTH CARE FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (CHCF-CCM)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)48X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)44X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)44X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)40X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)40X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges60X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CHCF-CCM TOTAL BASIS OF AWARD (A+B) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

CVSP, ISP & ISP CCM

GROUP 1 - CHUCKAWALLA STATE PRISON (CVSP), IRONWOOD STATE PRISON (ISP) & CHUCKAWALLA STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ISP-CCM)

CHUCKAWALLA STATE PRISON (CVSP)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)8X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)4X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)2X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)4X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)2X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges4X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

CVSP TOTAL BASIS OF AWARD (A+B) $ - 0

IRONWOOD STATE PRISON (ISP)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)40X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)20X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)6X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)20X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)12X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges20X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

ISP TOTAL BASIS OF AWARD (A+B) $ - 0

IRONWOOD STATE PRISON - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (ISP-CCM)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)18X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)16X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)16X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)16X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)16X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges16X=$ - 0
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

ISP-CCM TOTAL BASIS OF AWARD (A+B) $ - 0

TOTAL BASIS OF AWARD FOR GROUP 1 (CVSP, ISP & ISP-CCM) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

RJD & RJD-CCM

GROUP 2 - RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD) & RICHARD J. DONOVAN CORRECTIONAL FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (RJD-CCM)

RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)32X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)32X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)24X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)16X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)16X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges45X=
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

RJD TOTAL BASIS OF AWARD (A+B) $ - 0

RICHARD J. DONOVAN CORRECTIONAL FACILITY - CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM (RJD-CCM)
A. DescriptionEstimated Number of HoursX*Rate per Hour=Total
14 1/2 Ton Crane or equivalent (with hydraulic boom)32X=$ - 0
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
50 Ton Crane or equivalent (with hydraulic boom)32X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
80 Ton Crane or equivalent (with hydraulic boom)24X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
100 Ton Crane or equivalent (with hydraulic boom)20X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
120 Ton Crane or equivalent (with hydraulic boom)18X=
**Overtime Rate per Hour=
***Mobilization/ Demobilization Fee=
****Rigging Charges45X=
TOTAL A=$ - 0
B. Other
As-Needed Services (25%)=$ - 0
TOTAL B$ - 0

RJD-CCM TOTAL BASIS OF AWARD (A+B) $ - 0

TOTAL BASIS OF AWARD FOR GROUP 2 (RJD & RJD-CCM) $ - 0

Rate Sheet &"Arial,Regular"Bid Number C5613296-D, Rebid 1

&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .