The file's text, extracted by GovTribe without its formatting.
Rate Sheet
CONFINED SPACE RESCUE SERVICES
Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the applicable rate(s) specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel, per diem, fuel, and mileage), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide all services identified herein for the California Department of Corrections and Rehabilitation (CDCR) locations identified on Exhibit E, List of Participating Locations.
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
Each participating location’s total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder’s service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1, Rate Sheet.
| All CDCR estimated quantities and Contractor provided rates are for the entire term of this agreement. | |
| Contractors may offer a discount on invoices received and accepted by CDCR and paid within thirty (30) days of receipt. Discount offered must be at least one percent of the invoice amount and a minimum of $50.00. | |
| Discount offered on invoices paid within 30 days of receipt = | % * |
| *In the event of tie bids, CDCR reserves the right to determine the bidder entitled to the contract award based on the percentage of discount. If not applicable or a discount tie, a coin toss or lot drawing will be used in accordance with the Invitation for Bid, Basis for Award. | |
| There are no guarantees that any services will be requested from this agreement. | |
AVENAL STATE PRISON (ASP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 10 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 10 | X | | = | $ - 0 |
| Compliance Meeting | 10 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 2 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service-additional might be needed) | 2 | X | | = | $ - 0 |
| Rescue Technician (one per service-additional might be needed) | 2 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 10 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 10 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
ASP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIPATRIA STATE PRISON (CAL)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 32 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 32 | X | | = | $ - 0 |
| Compliance Meeting | 32 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 32 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 32 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 32 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 4 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 32 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 32 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CAL TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA CORRECTIONAL CENTER (CCC) UNDER THE AUTHORITY OF HDSP
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 12 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 4 | X | | = | $ - 0 |
| Compliance Meeting | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 8 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 8 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 16 | X | | = | $ - 0 |
| Tripods | 5 | X | | = | $ - 0 |
| Portable Davit Arm | 5 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 5 | X | | = | $ - 0 |
| Winches | 5 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 2 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 2 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CCC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA CORRECTIONAL INSTITUTION (CCI)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 30 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 30 | X | | = | $ - 0 |
| Compliance Meeting | 30 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 140 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 140 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 140 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 10 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 10 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CCI TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 20 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 20 | X | | = | $ - 0 |
| Compliance Meeting | 20 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 48 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 48 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 48 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 24 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 24 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 6 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CCWF TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CENTINELA STATE PRISON (CEN)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 40 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 40 | X | | = | $ - 0 |
| Compliance Meeting | 40 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 140 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 140 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 140 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 15 | X | | = | $ - 0 |
| Tripods | 15 | X | | = | $ - 0 |
| Portable Davit Arm | 15 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 15 | X | | = | $ - 0 |
| Winches | 15 | X | | = | $ - 0 |
| Other Related Equipment | 15 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 60 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 60 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 5 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CEN TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA HEALTH CARE FACILITY (CHCF)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 2 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 2 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 2 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CHCF TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA INSTITUTION FOR MEN (CIM)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 6 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 6 | X | | = | $ - 0 |
| Compliance Meeting | 6 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 24 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 24 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 24 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 9 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 9 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CIM TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA INSTITUTION FOR WOMEN (CIW)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 30 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 30 | X | | = | $ - 0 |
| Compliance Meeting | 30 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 30 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 30 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 30 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 8 | X | | = | $ - 0 |
| Tripods | 8 | X | | = | $ - 0 |
| Portable Davit Arm | 8 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 8 | X | | = | $ - 0 |
| Winches | 8 | X | | = | $ - 0 |
| Other Related Equipment | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CIW TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA MEN'S COLONY (CMC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 40 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 40 | X | | = | $ - 0 |
| Compliance Meeting | 40 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 4 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 4 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 4 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 16 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 16 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 16 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CMC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA MEDICAL FACILITY (CMF)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CMF TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA STATE PRISON, CORCORAN (COR)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 40 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 40 | X | | = | $ - 0 |
| Compliance Meeting | 40 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 8 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 8 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 8 | X | | = | $ - 0 |
| Portable Davit Arm | 8 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 8 | X | | = | $ - 0 |
| Winches | 8 | X | | = | $ - 0 |
| Other Related Equipment | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
COR TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 4 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 4 | X | | = | $ - 0 |
| Compliance Meeting | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 4 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 4 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 4 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 128 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 128 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 128 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CTC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CORRECTIONAL TRAINING FACILITY (CTF)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 20 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 20 | X | | = | $ - 0 |
| Compliance Meeting | 20 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 10 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 10 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CTF TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CHUCKAWALLA VALLEY STATE PRISON (CVSP) UNDER THE AUTHORITY OF ISP
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
CVSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
FOLSOM STATE PRISON (FSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 8 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 8 | X | | = | $ - 0 |
| Compliance Meeting | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 4 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 4 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 16 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 1 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
FSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
HIGH DESERT STATE PRISON (HDSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 12 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 4 | X | | = | $ - 0 |
| Compliance Meeting | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 8 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 8 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 16 | X | | = | $ - 0 |
| Tripods | 5 | X | | = | $ - 0 |
| Portable Davit Arm | 5 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 5 | X | | = | $ - 0 |
| Winches | 5 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 2 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 2 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
HDSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
IRONWOOD STATE PRISON (ISP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
ISP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
KERN VALLEY STATE PRISON (KVSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
KVSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 30 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 30 | X | | = | $ - 0 |
| Compliance Meeting | 30 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 50 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 50 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 50 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 30 | X | | = | $ - 0 |
| Tripods | 30 | X | | = | $ - 0 |
| Portable Davit Arm | 30 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 30 | X | | = | $ - 0 |
| Winches | 30 | X | | = | $ - 0 |
| Other Related Equipment | 30 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 40 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 40 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 15 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
LAC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
MULE CREEK STATE PRISON (MCSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 10 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 10 | X | | = | $ - 0 |
| Compliance Meeting | 10 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 80 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 80 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 80 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 5 | X | | = | $ - 0 |
| Tripods | 5 | X | | = | $ - 0 |
| Portable Davit Arm | 5 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 5 | X | | = | $ - 0 |
| Winches | 5 | X | | = | $ - 0 |
| Other Related Equipment | 5 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 40 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 40 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 40 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
MCSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
NORTHERN CALIFORNIA YOUTH CORRECTIONAL FACILITY (NCYCC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 20 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 20 | X | | = | $ - 0 |
| Compliance Meeting | 20 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 2 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 2 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 2 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
NCYCC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
NORTH KERN STATE PRISON (NKSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
NKSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
PELICAN BAY STATE PRISON (PBSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 3 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 3 | X | | = | $ - 0 |
| Compliance Meeting | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 24 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 24 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 1 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 8 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 24 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
PBSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
PLEASANT VALLEY STATE PRISON (PVSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 21 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 21 | X | | = | $ - 0 |
| Compliance Meeting | 21 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
PVSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 24 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 24 | X | | = | $ - 0 |
| Compliance Meeting | 24 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 24 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 24 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 24 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 5 | X | | = | $ - 0 |
| Tripods | 5 | X | | = | $ - 0 |
| Portable Davit Arm | 5 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 5 | X | | = | $ - 0 |
| Winches | 5 | X | | = | $ - 0 |
| Other Related Equipment | 5 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 8 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 16 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
RJD TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA STATE PRISON, SACRAMENTO (SAC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 24 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 24 | X | | = | $ - 0 |
| Compliance Meeting | 24 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 3 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 3 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 3 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 3 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
SAC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
SIERRA CONSERVATION CENTER (SCC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 48 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 48 | X | | = | $ - 0 |
| Compliance Meeting | 48 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 8 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 8 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 6 | X | | = | $ - 0 |
| Tripods | 6 | X | | = | $ - 0 |
| Portable Davit Arm | 6 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 6 | X | | = | $ - 0 |
| Winches | 6 | X | | = | $ - 0 |
| Other Related Equipment | 6 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 24 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 24 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 8 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
SCC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
CALIFORNIA STATE PRISON, SOLANO (SOL)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 20 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 20 | X | | = | $ - 0 |
| Compliance Meeting | 20 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 2 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 2 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 2 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 4 | X | | = | $ - 0 |
| Portable Davit Arm | 4 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 4 | X | | = | $ - 0 |
| Winches | 4 | X | | = | $ - 0 |
| Other Related Equipment | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 20 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 20 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
SOL TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
SAN QUENTIN REHABILITATION CENTER (SQRC)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 16 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 16 | X | | = | $ - 0 |
| Compliance Meeting | 16 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 24 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 24 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 24 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 8 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 8 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
SQRC TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
SALINAS VALLEY STATE PRISON (SVSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 4 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 4 | X | | = | $ - 0 |
| Compliance Meeting | 4 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Chief Officer / Site Project Lead (one per service) | 20 | X | | = | $ - 0 |
| Rescue Lead Technician (one per service) | 20 | X | | = | $ - 0 |
| Rescue Technician (one per service) | 20 | X | | = | $ - 0 |
| TOTAL FOR TABLE B | | | | = | $ - 0 |
| TABLE C: EQUIPMENT | | | | | |
| Equipment Description | Estimated Need Per Service | X | Rate per Service / Rental | = | TOTAL |
| Rescue Vehicle | 3 | X | | = | $ - 0 |
| Tripods | 3 | X | | = | $ - 0 |
| Portable Davit Arm | 3 | X | | = | $ - 0 |
| Truck Mount Portable Davit Arm | 3 | X | | = | $ - 0 |
| Winches | 3 | X | | = | $ - 0 |
| Other Related Equipment | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE C | | | | = | $ - 0 |
| TABLE D: OVERTIME SERVICES | | | | | |
| Description | Estimated Number of Hours | X | Overtime Rate per Hour | = | TOTAL |
| OVERTIME - Chief Officer | 1 | X | $ - 0 | = | $ - 0 |
| OVERTIME - Rescue Team | 1 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE D | | | | = | $ - 0 |
| TABLE E: EMERGENCY SERVICES | | | | | |
| Description | Estimated Number of Services | X | Rate per Service | = | TOTAL |
| Emergency Services | 3 | X | | = | $ - 0 |
| TOTAL FOR TABLE E | | | | = | $ - 0 |
| TABLE F: UNFORESEEABLE SERVICES | | | | | |
| Description | 25% | X | Total for Tables A-E | = | TOTAL |
| As-Needed Services | 0.25 | X | $ - 0 | = | $ - 0 |
| TOTAL FOR TABLE F | | | | = | $ - 0 |
SVSP TOTAL BASIS OF AWARD (A + B + C + D + E + F) = $ - 0
VALLEY STATE PRISON (VSP)
| TABLE A: INSPECTION OF DOCUMENTS MEETING | | | | | |
| Description | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
| Service Activation Readiness Meeting | 10 | X | | = | $ - 0 |
| Confined Space Jobsite Safety Briefing Meeting | 10 | X | | = | $ - 0 |
| Compliance Meeting | 10 | X | | = | $ - 0 |
| TOTAL FOR TABLE A | | | | = | $ - 0 |
| TABLE B: RESCUER CLASSIFICATIONS | | | | | |
| Classifications | Estimated Number of Hours | X | Rate per Hour | = | TOTAL |
This is the start of the file's text. The full file is on GovTribe.