Exhibit A - Schedule of Values.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Generator Installation (Lakeland)
Solicitation number
ITB-LD 119-2025
Issued by
Polk County, Florida

About this file

This document is an Exhibit A - Schedule of Values for a Generator Installation project issued by the Housing Department of the Seminole Tribe of Florida located in Lakeland, Florida. The solicitation seeks qualified contractors to provide standby generator installation services at 4614 Great Blue Heron Dr., Lakeland, FL 34812. The project scope includes removal of existing generator and tank, site preparation, furnishing and installing a new generator, transfer switch, fuel tank, concrete pad, electrical services, and project management. The installation involves a 6-inch thick pre-cast concrete pad rated for 3,000 lb. capacity, with the generator delivery, installation, electrical connections, startup, and testing services.

The Schedule of Values breaks down the project into six main categories: General Requirements, New Materials/Equipment, Concrete Pad, Installation, Start Up & Test Installed Generator, and Project Management. The document requires bidders to complete all sections of the schedule, with line items ranging from mobilization and temporary facilities to generator furnishing and installation. Pricing is to be submitted as lump sum for most line items, with no specific total project cost or budget indicated in the provided document. Bidders must provide comprehensive company contact information and are instructed to fill out all yellow-highlighted cells in the spreadsheet to remain eligible for contract award.

View the file

Other files

File Type Posted
ITB-LD 119-2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
Thank you for your interest in responding to this solicitation. Below are the instructions for filling out this required document.
"Contact Info" Tab
1Bidder will fill in their company's registered name in the yellow cell next to "Company Name:"
2Bidder will fill in the remaining yellow cells with their name, business address, phone number, email address, and website address.
3Should additional or secondary contacts be needed, Bidder may fill in the name, phone number, and email address of these additional contacts in the yellow cells provided. Listing additional contacts is not required.
"Schedule of Values" Tab
1Bidder will review each requirement and respond in the corresponding yellow cells under Column C with the lumpsum cost, unless otherwise instructed. Bidder may enter comments in Column G, if applicable.

Contact Info

Contact Info
Main Contact Information (required)
Company Name:
Number of Years in Business:
Business Contact Name:
Street Address:
City:
State:
Zip Code:
Business Contact Phone:
Business Contact Email:
Website Address:
Additional Contact Information (optional)
Business Contact Name:
Business Contact Phone:
Business Contact Email:

Schedule of Values

ITB-LD 119-2025 Generator Installation (Lakeland)
EXHIBIT A - SCHEDULE OF VALUES*
Project Name:Generator Installation (Lakeland) 4614 Great Blue Heron Dr. Lakeland, FL 34812
LINE ITEM NO.LINE ITEM DESCRIPTIONPRICEUOMQUANTITYEXTENDED PRICECOMMENTS (IF APPLICABLE)
1.00General Requirements
1.01Start-up and mobilization/dumpster rental/trash removalLumpsum1$ - 0
1.02Temporary bathroomsLumpsum1$ - 0
1.03Move or Removal and haul-away of existing generator and tankEach$ - 0
1.04Site PreparationLumpsum1$ - 0
1.05Final cleanLumpsum1$ - 0
1.06Project Lead TimeN/ACalendar DaysN/AIncludes ordering and receipt of materials, building permit, installation, and final clean-up after receipt of order (ARO).
2.00New Materials/Equipment
2.01Furnish Generator as described in the SOWLumpsum1$ - 0
2.02Furnish or Connect to Transfer Switch(s) as described in the SOWLumpsum1$ - 0
2.03Furnish tank as described in the SOW, Above ground and anchored with anode bag and 20 gallons of fuel for testing. Install 3 concrete pads.Lumpsum1$ - 0
3.00Concrete Pad
3.01Furnish and install one (1) new 6-inch thick by 4'x9' Pre-Cast Monolithic Concrete pad rated for 3,000 lb. capacity per each generator with #5 rebar 12" on center.Each$ - 0
4.00Installation
4.01Generator installation services as described in the SOW (includes delivery and installation on concrete pad) and Electrical services (includes all wiring connections and wire sizes to specs, control wires from existing Transfer Switch to generator, etc.)Lumpsum$ - 0
5.00Start Up & Test Installed Generator
5.01Generator start-up service, generator test (includes 20 gallons of fuel for start-up, as described in SOW)Lumpsum$ - 0
6.00Project Management
6.01Project Management, Supervisor, and Support StaffLumpsum$ - 0
TOTAL:$ - 0
*NOTES:
- SOV MUST BE COMPLETED IN FULL TO BE ELIGIBLE FOR AWARD, NO EXCEPTIONS.
_______________________________________
Corporate Officer or Owner (Signature)Date
_______________________________________
Corporate Officer or Owner (Print)

File details come from the government source that posted it. Updated .