This is a Scope of Work document for on-call environmental consulting services issued by the University of Texas at Austin under RFPs 721-27041 and 721-27042. The University seeks qualified environmental consulting firms to provide environmental assessments, inspections, sampling, testing, monitoring, regulatory support, remediation protocols, project oversight, and related consulting services on an as-needed basis. Services will be performed at UT Austin Main Campus, Pickle Research Campus, and other University-owned or operated facilities. The scope encompasses asbestos services, lead-based paint services, indoor air quality assessments, mold assessment and remediation support, environmental contamination and release assessments, industrial hygiene services, infrared thermal imaging, PCB and metals sampling, and other environmental investigations as requested. The University anticipates making multiple contract awards to provide qualified options, maintain competition, increase service capacity, and support routine, planned, and emergency environmental work. No specific response dates, due dates, site visits, bidders conferences, or award dates are identified in this document.
Services may be authorized on a lump-sum/hard-bid basis, a time-and-materials not-to-exceed (NTE) basis, or a combination of these pricing methods, as determined by the University for each assignment. Contractors must provide detailed pricing for personnel classifications including project managers, certified industrial hygienists, mold assessment consultants and technicians, asbestos specialists, lead inspectors, industrial hygienists, environmental scientists, field technicians, and infrared thermographers. Unit pricing or markups must also be provided for various analytical services including asbestos, mold, lead, PCB, metals, and microbiological analysis, as well as specialty services and emergency mobilization charges. All contractors must maintain applicable Texas licenses (mold assessment, asbestos), EPA certifications (lead inspector, lead risk assessor), and other industry-recognized credentials. No minimum amount of work is guaranteed to any contractor, and no set-asides are identified in this solicitation. The document does not specify contract term or renewal options beyond indicating services are provided on an as-needed basis.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Page 1 of 9
On-Call Environmental Consulting Services RFP 721-27041
RFP 721-27042 – EXHIBIT A
SECTION 4.4
SCOPE OF WORK
On-Call Environmental Consulting Services
The University of Texas at Austin
1. PURPOSE
The University of Texas at Austin seeks qualified environmental consulting firms to provide environmental assessments, inspections, sampling, testing, monitoring, regulatory support, remediation protocols, project oversight, and related consulting services on an as-needed basis.
The University anticipates making multiple contract awards to provide qualified options, maintain competition, increase service capacity, and support routine, planned, and emergency environmental work.
Services may be authorized on a lump-sum/hard-bid basis, a time-and-materials not-to-exceed basis, or a combination of these pricing methods, as determined by the University for each assignment.
2. ABBREVIATIONS
ACM Asbestos-Containing Material EHS Environmental Health and Safety EPA United States Environmental Protection Agency FOM Facilities Operations and Maintenance IAQ Indoor Air Quality NTE Not to Exceed OSHA Occupational Safety and Health Administration PCB Polychlorinated Biphenyl PM Project Manager SOW Scope of Work T&M Time and Materials TDLR Texas Department of Licensing and Regulation UT The University of Texas at Austin
3. DESCRIPTION OF WORK
3.1 GENERAL REQUIREMENTS
The Contractor shall provide qualified personnel, supervision, sampling equipment, monitoring instruments, laboratory services, reports, documentation, and technical support necessary to perform authorized environmental consulting services.
Services may be performed at the UT Austin Main Campus, Pickle Research Campus, and other University-owned or operated facilities.
Exhibit A Page 2 of 9
Work may include routine assessments, maintenance and repair support, emergency response, occupant concerns, regulatory compliance, environmental investigations, remediation planning, contractor oversight, progress inspections, and post-remediation verification.
The Contractor shall perform only work authorized in writing by the UT Project Manager. Each authorization will identify the location, requested services, deliverables, schedule, and authorized pricing method.
3.2 ENVIRONMENTAL CONSULTING SERVICES
Services may include the following:
3.2.1 Asbestos Services
• Asbestos management and regulatory consulting.
• Asbestos testing and bulk-material sampling.
• Limited, comprehensive, pre-renovation, and pre-demolition surveys.
• Asbestos inspections and condition assessments.
• Asbestos air monitoring and project monitoring.
• Development or review of asbestos abatement specifications and work plans.
• Clearance inspections and final reporting.
• Coordination with properly licensed laboratories and abatement professionals.
3.2.2 Lead-Based Paint Services
• Lead-based paint inspections.
• Lead risk assessments.
• Paint-chip, dust-wipe, soil, or other applicable sampling.
• X-ray fluorescence screening when appropriate.
• Exposure evaluations and recommendations.
• Clearance examinations when authorized.
• Support for maintenance, repair, renovation, or abatement projects involving lead-containing materials.
3.2.3 Indoor Air Quality Services
• Indoor air quality assessments and sampling.
• Evaluation of temperature, relative humidity, carbon dioxide, carbon monoxide, particulate matter, volatile organic compounds, formaldehyde, odors, and other parameters identified by UT.
• HVAC and ventilation observations related to indoor environmental conditions.
• Moisture measurements and moisture-source investigations.
• Assessment of occupant indoor air quality concerns.
• Development of findings, conclusions, and corrective recommendations.
3.2.4 Mold Assessment and Remediation Support
• Visual mold inspections and assessments.
• Moisture investigation and mapping.
• Inspection of accessible HVAC systems, ductwork, and building components.
• Mold air, surface, bulk, or dust sampling when appropriate.
• Development of mold remediation protocols.
• Establishment of work areas, containment requirements, cleaning methods, engineering controls, and clearance criteria.
• On-site observation and environmental quality-control support during remediation.
• In-progress inspections and sampling.
• Post-remediation assessments, sampling, and clearance.
• Preparation of required reports, certifications, and closeout documents.
When requested by UT, the Contractor shall provide on-site environmental support similar to the services provided during the Townes Hall mold remediation project. This may include regular or continuous field presence, observation of remediation activities, confirmation of containment and cleaning practices, rapid inspection and clearance of completed areas, coordination with the remediation contractor, and general environmental quality-control observations.
Exhibit A Page 3 of 9
3.2.5 Environmental Contamination and Release Assessments
• Investigation of known or suspected releases of chemicals, petroleum products, hazardous materials, or other contaminants.
• Evaluation of contamination resulting from equipment failures, leaks, spills, flooding, maintenance activities, or other incidents.
• Review of available records, drawings, safety data sheets, and incident information.
• Development of project-specific sampling plans.
• Sampling of soil, water, sediment, building materials, or other affected media, as applicable.
• Delineation of the apparent nature and extent of contamination when required.
• Evaluation of analytical results against applicable regulatory or risk-based criteria.
• Recommendations for containment, cleanup, removal, disposal, additional investigation, or corrective action.
• Post-cleanup inspection and verification sampling when required.
• Coordination with UT EHS and applicable regulatory agencies when authorized by UT.
3.2.6 Industrial Hygiene Services
• Industrial hygiene assessments and sampling.
• Personal and area exposure monitoring.
• Negative exposure assessments.
• Silica, metals, dust, fumes, vapors, noise, heat stress, biological agents, and other occupational exposure evaluations.
• Development of exposure-monitoring plans.
• Interpretation of analytical results and comparison to applicable occupational exposure limits.
• Recommendations for engineering controls, administrative controls, work practices, PPE, or additional evaluation.
3.2.7 Infrared Thermal Imaging
• Infrared camera inspections of building systems and materials.
• Identification of apparent moisture patterns.
• Evaluation of insulation anomalies, air leakage, or abnormal temperature differences.
• Verification of suspected conditions using moisture meters or other appropriate instruments.
• Documentation of thermal images and related findings in the applicable report.
Infrared thermal imaging shall be used as an investigative tool and shall not, by itself, be considered confirmation of moisture, contamination, or a specific concealed condition.
3.2.8 PCB and Metals Sampling
• Sampling of caulk, coatings, oils, dust, soil, water, building materials, or other applicable media.
• PCB and metals laboratory analysis.
• Interpretation of analytical results.
• Identification of applicable handling, cleanup, or disposal requirements.
• Recommendations for additional investigation, management, or corrective action.
• Post-cleanup verification sampling when required.
3.2.9 Other Environmental Investigations and Technical Consulting The Contractor may be requested to perform other environmental assessments, investigations, sampling, monitoring, regulatory support, or technical consulting related to University facilities and operations.
Any additional service must be within the Contractor’s demonstrated qualifications and the applicable licenses, certifications, and regulatory requirements. Additional services require written authorization from the UT Project Manager before work begins.
3.3 REMEDIATION AND ABATEMENT PROJECT SUPPORT
When authorized by UT, the Contractor shall support mold remediation, asbestos abatement, lead hazard control, environmental cleanup, or other corrective work.
• Initial site assessment and documentation of existing conditions.
• Review of available drawings, reports, and project information.
• Development of remediation or abatement protocols.
Exhibit A Page 4 of 9
• Development of sampling and clearance plans.
• Pre-remediation or baseline sampling.
• Attendance at project kickoff, planning, coordination, and progress meetings.
• Routine or continuous on-site project observation.
• Observation of containment, negative pressure, cleaning, removal, and waste-handling activities.
• Identification of deviations from the approved protocol or work plan.
• In-progress sampling and inspection.
• Evaluation of suspected cross-contamination or changed conditions.
• Post-remediation or post-abatement visual inspections.
• Clearance sampling and phased release of completed areas.
• Punch-list development and verification.
• Final project documentation and closeout reporting.
The Contractor shall promptly notify the UT Project Manager of conditions that may affect health and safety, regulatory compliance, project quality, clearance, schedule, University operations, or building occupancy.
The Contractor’s observations do not relieve remediation or abatement contractors of responsibility for supervision, worker safety, means and methods, regulatory compliance, or completion of their work.
The Contractor shall not direct or control another contractor’s personnel, safety program, or means and methods except to the extent specifically authorized by law, the applicable professional license, or the UT work authorization.
4. WORK AUTHORIZATION AND PRICING
4.1 GENERAL
The University may request a proposal from one or more awarded Contractors for each assignment.
UT may consider the following when selecting a Contractor:
• Applicable licenses and qualifications.
• Experience with similar work.
• Technical approach.
• Availability and response time.
• Continuity with prior or ongoing work.
• Proposed personnel.
• Laboratory capabilities.
• Schedule.
• Price.
• Overall best value to the University.
No minimum amount of work is guaranteed to any Contractor.
The Contractor shall not begin work without written authorization from the UT Project Manager.
The Contractor shall not perform work exceeding the authorized scope or amount without prior written approval from UT.
4.2 LUMP-SUM OR HARD-BID WORK
For well-defined assignments, UT may request a lump-sum or hard-bid proposal.
The proposal shall include:
• Defined scope of work.
• Proposed methodology.
• Staffing and qualifications.
Exhibit A Page 5 of 9
• Number and type of samples.
• Laboratory methods and turnaround times.
• Schedule.
• Deliverables.
• Assumptions and exclusions.
• Lump-sum price.
• Unit pricing for potential additional services, when requested.
The lump-sum price shall include the labor, supervision, equipment, standard consumables, reporting, travel, laboratory services, and other costs necessary to complete the proposed scope unless specifically identified otherwise.
The Contractor shall not perform additional work beyond the authorized scope without prior written approval from UT.
4.3 TIME-AND-MATERIALS NOT-TO-EXCEED WORK
UT may authorize uncertain, urgent, emergency, investigative, or field-intensive work on a T&M NTE basis.
The proposal shall include:
• Personnel classifications and hourly rates.
• Estimated labor hours.
• Estimated sample quantities and laboratory costs.
• Equipment or instrument charges.
• Subcontracted services.
• Reimbursable expenses, if permitted.
• Schedule and staffing plan.
• Total NTE amount.
The Contractor shall monitor expenditures against the authorized NTE amount and notify the UT Project Manager when approximately 75 percent and 90 percent of the authorized amount has been committed or billed.
The Contractor shall not exceed the authorized NTE amount without prior written approval from UT.
The University may combine lump-sum deliverables, unit-price sampling, and T&M NTE field services within the same work authorization.
5. LICENSING AND QUALIFICATIONS
The Contractor shall maintain all licenses, registrations, certifications, training, insurance, and laboratory accreditations required to perform the authorized services.
Applicable qualifications may include:
• Texas Mold Assessment Company license.
• Texas Mold Assessment Consultant license.
• Texas Mold Assessment Technician license.
• Texas asbestos consultant, inspector, management planner, project designer, air-monitoring technician, project monitor, or other required license.
• EPA or other applicable lead inspector and lead risk assessor certifications.
• Certified Industrial Hygienist credentials when required by the assignment.
• Appropriate infrared thermography training or certification.
• AHERA accreditation when applicable.
• Appropriate OSHA, NIOSH, EPA, ASTM, AIHA, ACGIH, or other industry-recognized training and credentials.
• Laboratory licenses and accreditations applicable to each material, sample type, and analytical method.
Personnel shall perform services only within the limits of their applicable licenses, certifications, training, and experience.
The Contractor shall provide copies of licenses, certifications, resumes, laboratory accreditations, and other qualification documentation upon request.
Exhibit A Page 6 of 9
The Contractor shall immediately notify UT of any suspension, expiration, restriction, or loss of a required license, certification, registration, or accreditation.
The Contractor may use qualified subcontractors or laboratories when approved by UT. The Contractor remains responsible for the coordination, quality, completeness, and timely delivery of subcontracted services.
6. SAMPLING AND LABORATORY REQUIREMENTS
The Contractor shall:
• Use accepted sampling and analytical methods appropriate to the material or condition being evaluated.
• Use calibrated and properly maintained instruments.
• Maintain complete chain-of-custody documentation.
• Use properly licensed or accredited laboratories.
• Include appropriate field blanks, duplicates, or other quality-control samples when required.
• Identify analytical methods, detection limits, and laboratory turnaround times.
• Notify UT when expedited laboratory analysis is recommended.
• Provide original laboratory reports with the final report.
• Maintain sample records and supporting documentation for each assignment.
• Follow applicable sample-preservation requirements, holding times, and shipping requirements.
Additional sampling shall not be performed beyond the authorized scope without UT approval unless immediate sampling is necessary to evaluate an urgent condition and the UT Project Manager authorizes the work.
7. REPORTING AND RECORDS
7.1 FIELD DOCUMENTATION
The Contractor shall maintain field records appropriate to the authorized work.
Field documentation may include:
• Date and location of services.
• Names and qualifications of personnel performing the work.
• Areas inspected.
• Sampling locations.
• Instrument readings.
• Field observations.
• Photographs.
• Floor-plan or site-plan markups.
• Chain-of-custody records.
• Calibration records.
• Identified deficiencies or changed conditions.
• Discussions and directions affecting the work.
When routine or continuous on-site support is authorized, the Contractor may be required to provide daily field reports or concise progress summaries.
7.2 SERVICE AND ASSESSMENT REPORTS
Reports shall be appropriate to the size and complexity of the assignment and may include:
• Executive summary.
• Project background and purpose.
• Description of the assessed areas.
• Methods and procedures.
• Field observations.
• Sample locations.
• Analytical results.
• Photographs and diagrams.
• Interpretation of results.
• Applicable criteria or exposure limits.
• Limitations.
Exhibit A Page 7 of 9
• Conclusions.
• Corrective recommendations.
• Laboratory reports.
• Chain-of-custody forms.
• Recommended additional investigation or monitoring.
Draft reports shall be provided when requested by UT. Final reports shall incorporate resolved UT review comments.
Critical findings shall be reported to the UT Project Manager immediately. Written documentation shall follow the initial notification.
7.3 REMEDIATION AND CLEARANCE REPORTS
Remediation and clearance reports shall document, as applicable:
• Areas evaluated.
• Applicable remediation protocol or abatement work plan.
• Visual inspection results.
• Sampling methods and locations.
• Analytical results.
• Applicable clearance criteria.
• Deviations from the protocol or work plan.
• Areas that passed or failed the established criteria.
• Punch-list or corrective items.
• Final clearance status.
• Required state or regulatory documentation.
• Unresolved conditions and recommended follow-up.
Reports shall be provided as searchable PDF files. Editable files, photographs, field data, annotated plans, and other supporting documentation shall be provided when requested by UT.
8. COORDINATION, SAFETY, AND ENVIRONMENTAL REQUIREMENTS
The Contractor shall:
• Coordinate building access and field work with the UT Project Manager.
• Minimize disruption to building occupants and University operations.
• Obtain UT approval before performing destructive or invasive testing.
• Follow applicable UT access, safety, badging, parking, confidentiality, and incident-reporting requirements.
• Provide required PPE and field safety equipment.
• Properly manage sampling waste and investigative debris.
• Prevent uncontrolled releases and cross-contamination.
• Immediately report suspected hazardous conditions or damage to University property.
• Coordinate after-hours or emergency work with the UT Project Manager.
• Comply with applicable federal, state, and local requirements.
• Maintain required calibration, training, medical-clearance, and respiratory-protection documentation for assigned personnel.
• Restore disturbed areas when specifically included in the authorized scope.
The Contractor shall document existing conditions before destructive or invasive sampling. Restoration of finishes or building materials disturbed by sampling shall be included only when specifically authorized by UT.
9. PROPOSAL REQUIREMENTS
The Contractor shall submit proposals with sufficient detail for UT to evaluate the proposed work, schedule, qualifications, and price.
Each proposal shall include:
• Understanding of the requested assignment.
• Proposed scope and methodology.
• Applicable licenses and qualifications.
• Assigned personnel.
Exhibit A Page 8 of 9
• Proposed subcontractors and laboratories.
• Schedule and response time.
• Sampling quantities and analytical methods.
• Laboratory turnaround times.
• Deliverables.
• Lump-sum price or T&M NTE estimate.
• Hourly labor rates.
• Laboratory and unit pricing.
• Equipment charges.
• Subcontractor or laboratory markups.
• Assumptions and exclusions.
• List of exceptions to the requested scope.
• Proposal validity period.
The Contractor shall clearly identify any proposed trip charges, minimum charges, emergency premiums, after-hours rates, expedited laboratory fees, equipment charges, shipping charges, subcontractor markups, or other additional costs.
10. CONTRACT RATE AND UNIT PRICING
Contractors shall provide pricing for applicable personnel classifications, including:
• Principal or program manager.
• Project manager or senior consultant.
• Certified Industrial Hygienist.
• Mold Assessment Consultant.
• Mold Assessment Technician.
• Asbestos consultant or project manager.
• Asbestos inspector or management planner.
• Asbestos air-monitoring technician or project monitor.
• Lead inspector or risk assessor.
• Industrial hygienist or staff scientist.
• Environmental scientist.
• Field or sampling technician.
• Infrared thermographer.
• Report, CAD, or GIS support.
Contractors shall also provide unit pricing or established markups for:
• Asbestos bulk-sample analysis.
• Asbestos PCM air-sample analysis.
• Asbestos TEM air-sample analysis.
• Mold air-sample analysis.
• Mold surface or bulk-sample analysis.
• Lead paint-chip, dust-wipe, and soil analysis.
• PCB analysis.
• Metals analysis.
• Industrial hygiene sample analysis.
• Microbiological analysis.
• Soil, water, sediment, and building-material analysis.
• Specialized monitoring equipment.
• Subcontracted specialty services.
• Laboratory services.
• Shipping and expedited turnaround.
• Emergency mobilization charges.
Exhibit A Page 9 of 9
11. DELIVERABLES
Deliverables may include:
• Project-specific proposal or work plan.
• Sampling and analysis plan.
• Environmental assessment, inspection, or survey report.
• Mold remediation protocol.
• Asbestos or lead abatement specification.
• Indoor air quality assessment.
• Environmental contamination or release assessment.
• Industrial hygiene exposure assessment.
• Infrared thermal imaging report.
• Daily or periodic field reports.
• In-progress inspection and sampling reports.
• Post-remediation or post-abatement clearance report.
• Laboratory reports and chain-of-custody records.
• Photographs and annotated plans.
• Regulatory forms and certifications.
• Final project report and closeout documentation.
All deliverables shall be complete, accurate, clearly organized, and suitable for use by University facilities personnel, project managers, consultants, contractors, regulators, and other authorized parties.