Exhibit A_Inventory List Tanks_16Apr24.xlsx
XLSX spreadsheet 51 KB Posted
- Solicitation number
- W912CM24Q0014
About this file
This document is a tank inventory list and maintenance schedule for the United States Army Garrison (USAG) Wiesbaden in Germany. It provides detailed information on the various heating oil, diesel, gasoline, waste oil, antifreeze, and propane tanks located across multiple facilities, including their capacity, manufacturer, safety systems, and inspection schedules.
The related federal contract opportunity is for the maintenance and repair services of these aboveground and belowground liquid storage tanks. The Regional Contracting Office - Wiesbaden plans to issue a Request for Quote (RFQ) around July 23, 2024 for a hybrid Firm-Fixed-Price and Time-and-Materials purchase order with a 9-month base period and two 12-month option years. A site visit is tentatively scheduled for August 7, 2024. The solicitation will be posted on the System for Award Management website, and offerors must be registered in SAM at the time of submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - IRS Form W-14.pdf | ||
| Attachment 3 - Instructions for IRS Form W-14.pdf | ||
| Attachment 4 - Reference Information Sheet.pdf | ||
| DRAFT - W912CM24Q0014 Liquid Storage Tank Services.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Heating Oil
| Tank Inventory Maintenance & TUEV Inspection Schedule | |||||||||||
| USAG Wiesbaden | |||||||||||
| Heating Oil Tanks | HEO-POL Section | ||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Remarks | last PM | next PM | |
| 1 | Clay | 1072-1 | Heating Oil | 5,000 | UST | 50/109146 | Stefan Nau | doublet Wallet Tank | Heating System | Nov-19 | Nov-24 |
| 1 | Clay | 1500-2 | Heating Oil | 30,000 | UST | 50/160923 | BTD Altmeyer | Leak detection system | Generator/double Walled Tank | Jun-18 | Jun-24 |
| 1 | Clay | 1507-1 (#1007) | Heating Oil | 4,600 | AST | 16876 | PEMO | Tank with In liner LAG | Generator | Oct-20 | Oct-24 |
| 1 | Clay | 1507-2 | Heating Oil | 5,000 | UST | 50/158630 | Altmeyer | double walled tank | Generator | Oct-20 | Apr-25 |
| 1 | Clay | 3500-1 | Heating Oil | 5000 | UST | 051-3345 | HAASE Tank | double walled tank | Heating System | Nov-22 | Nov-27 |
| 1 | Clay | 3500-4 | Heating Oil | 3500 | UST | 035-1402 | HAASE Tank | double walled tank | Heating System | Nov-23 | Nov-28 |
| 1 | Kastel Storage | 4209-1 | Heating Oil | 32,400 | AST | 3442 | Steyer | Tank with In liner LAG | Heating System | Jul-21 | Jul-26 |
| 1 | Kastel Storage | 4506-1 | Heating Oil | 50,000 | AST | 50/153669 | BTD | double walled tank | Heating System | Nov-19 | Nov-24 |
| 1 | Kastel Storage | 4506-2 | Heating Oil | 50,000 | AST | 50/153690 | BTD | double walled tank | Heating System | Nov-19 | Nov-24 |
| 1 | Golf Course | 5119-1 | Heating Oil | 7000 | UST | 03/43807 | Bierdorf | double walled tank | Heating System | Feb-22 | Feb-27 |
| 1 | Amelia Earhart | 5301-1 | Heating Oil | 60,000 | UST | 38/55612 | Walter Kreamer | double walled tank | Heating System | Feb-20 | Feb-27 |
| 1 | Amelia Earhart | 5301-2 | Heating Oil | 50,000 | UST | 38/55611 | Walter Kreamer | double walled tank | Heating System | Feb-20 | Feb-27 |
| 1 | Mc Cully | 6291-3 | Heating Oil | 30,000 | UST | unknown | unknown | decommisioned | Heating System | Sep-19 | - |
| 1 | Mc Cully | 6264-01 | Heating Oil | 50,000 | UST | unknown | unknown | double walled tank | Heating System | Jan-23 | Jan -28 |
| 1 | Mc Cully | 6264-02 | Heating Oil | 50,000 | UST | unknown | unknown | double walled tank | Heating System | Jan-23 | Jan -28 |
| 1 | Dagger | 4366-1 | Heating Oil | 50,000 | AST | unknown | unknown | double walled tank | Heating System | ||
| 1 | Dagger | 4366-2 | Heating Oil | 50,000 | AST | unknown | unknown | double walled tank | Heating System | ||
| 17 | Heating Oil | 332,500 | Total Capacity |
Diesel
| Tank Inventory Maintenance & TUEV Inspection Schedule | ||||||||||||
| USAG Wiesbaden | ||||||||||||
| Diesel Fuel Tanks | HEO-POL- Section | |||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Remarks | Year of Manufactury | last PM | next PM | |
| 1 | Clay | 1000-1 | Diesel | 25,000 | UST | 50/159321 | Altmeyer BTD | Leak detection system | Generator/double Walled Tank | 2013 | 2018 | 2024 |
| 1 | Clay | 1000-2 | Diesel | 25,000 | UST | 50/159322 | Altmeyer BTD | Leak detection system | Generator/double Walled Tank | 2013 | 2018 | 2024 |
| 1 | Clay | 1000-3 | Diesel | 1,950 | AST | 17866 | Kampritz | Leak detection system | Generator/catch basin | 2013 | 2018 | 2024 |
| 1 | Clay | 1000-4 | Diesel | 1,950 | AST | 17867 | Kampritz | Leak detection system | Generator/catch basin | 2013 | 2018 | 2024 |
| 1 | Clay | 1000-5 | Diesel | 1,950 | AST | 17865 | Kampritz | Leak detection system | Generator/catch basin | 2013 | 2018 | 2024 |
| 1 | Clay | 1086-1 | Diesel | 5,000 | UST | 50/120248 | Stefan Nau | doublet Wallet Tank | Generator | 1986 | Aug-23 | Aug-28 |
| 1 | Kastel Storage | 4009-2 | Diesel | 5,700 | AST | 15013 | Kampritz | doublet Wallet Tank | Generator | 2009 | Jan-23 | Jan-28 |
| 1 | Golf Course | 5136-2 | Diesel | 10,000 | AST | 50/149362 B | Stefan Nau | Double Walled Tank | Gas station | 2001 | Sep-23 | Sep-28 |
| 1 | Amelia Earhart | 5301-4 | Diesel | 12,500 | AST | 8501 | Oesterwiemann | Tank with In liner LAG | Generator | 2007 | Oct-18 | 2024 |
| 1 | Mc Cully | 6294-2 | Diesel | 100,000 | UST | 50/118987 | Stefan Nau | Leak detection system | Double Walled Tank Gas station | 1985 | stillgelegt | - |
| 1 | Mc Cully | 6294-3 | Diesel | 100,000 | UST | 50/118988 | Stefan Nau | Leak detection system | Double Walled Tank Gas station | 1985 | Jan-22 | Jan-27 |
| 1 | Mc Cully | 6294-4 | Diesel | 100,000 | UST | 50/118986 | Stefan Nau | Leak detection system | Double Walled Tank Gas station | 1985 | Nov-19 | Nov-24 |
| 1 | Hainerberg Shopping | 7850-1 | Diesel | 4,000 | UST | 9314-9579 | Generator | Jan-21 | Jan-26 | |||
| 1 | Hainerberg Shopping | 7850-2 | Diesel | 2,000 | UST | 9314-9579 | Jan-21 | Jan-26 | ||||
| 1 | HHA | 7883-4 | Diesel | 50,000 | UST | 50/14482 B | Srefan Nau | Leak detection system | Double Walled Tank | 1998 | Jan-21 | Jan-26 |
| 15 | Diesel | 445,050 | Total Capacity |
Gasoline
| Tank Inventory Maintenance & TUEV Inspection Schedule | ||||||||||||
| USAG Wiesbaden | ||||||||||||
| Gasoline Tanks | HEO-POL Section | |||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Remarks | Year of Manufactury | last PM | next PM | |
| 1 | Kastel Storage | 4505-1 | Gasoline | 10,000 | UST | 50/144411 | Stefan Nau | double walled Tank | leak detection System | 1998 | Sep-23 | Sep-28 |
| 1 | Kastel Storage | 4505-2 | Gasoline | 20,000 | UST | 50/144413 | Stefan Nau | double walled Tank | leak detection System | 1998 | Sep-23 | Sep-28 |
| 1 | Kastel Storage | 4505-3 | Gasoline | 50,000 | UST | 50/144412 | Stefan Nau | double walled Tank | leak detection System | 1998 | Sep-23 | Sep-28 |
| 1 | Golf Course | 5136-1 | Gasoline (Mogas) | 5,000 | UST | 50/147998 | Stefan Nau | double walled Tank | leak detection System | 2000 | Sep-23 | Sep-28 |
| 1 | HHA | 7883-1 | Gasoline | 40,000 | UST | 50/144479 | Stefan Nau | double walled Tank | leak detection System | 1998 | Mar-22 | Mar-27 |
| 1 | HHA | 7883-2 | Gasoline | 40,000 | UST | 50/144480 | Stefan Nau | double walled Tank | leak detection System | 1998 | Feb-22 | Feb-27 |
| 1 | HHA | 7883-3 | Gasoline | 40,000 | UST | 50144481 B | Stefan Nau | double walled Tank | leak detection System | 1998 | Feb-22 | Feb-27 |
| 7 | Gasoline | 205,000 | Total Capacity |
Waste Oil
| Tank Inventory Maintenance & TUEV Inspection Schedule | ||||||||||||
| USAG Wiesbaden | ||||||||||||
| Waste Oil Tanks | HEO-POL | |||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Remarks | Year of Manufactury | last PM | next PM | |
| 1 | Clay | 1004-6 | Waste Oil | 5,000 | UST | 10772 | Oct-23 | Oct-28 | ||||
| 1 | Clay | 1066-1 | Waste Oil | 5,000 | UST | 10807 D | Steinbach | Leak detection system | Double Walled Tank | 1978 | Aug-23 | Aug-28 |
| 1 | Clay | 1211-4 | Waste Oil | 3,000 | UST | 88/69121 | Reuther | Leak detection system | Double Walled Tank | 2001 | Oct-23 | Oct-28 |
| 1 | Clay | 1218-1 | Waste Oil | 3,000 | UST | 93/015470 | Dehoust | Leak detection system | Double Walled Tank | 2001 | Mar-22 | Mar-27 |
| 1 | Clay | 1223-1 | Waste Oil | 3,000 | UST | 50/134731 | Stefan Nau | Leak detection system | Double Walled Tank | 1993 | Mar-22 | Mar-27 |
| 1 | Clay | 1224-1 | Waste Oil | 10,000 | UST | 159528 | Altmeyer BTD | Leak detection system | Double Walled Tank | 2011 | Mar-22 | Mar-27 |
| 1 | Clay | 1224-2 | Waste Oil | 10,000 | UST | 159529 | Altmeyer BTD | Leak detection system | Double Walled Tank | 2011 | Mar-22 | Mar-27 |
| 1 | Clay | 3500-2 | Waste Oil | 3,500 | UST | 035-2103 | HAASE Tank | Leak detection system | Double Walled Tank | 2011 | Aug-22 | Aug-27 |
| 1 | Mc Cully | 6291-2 | Waste Oil | 3,000 | UST | unknown | unknown | Leak detection system | shall be closed | 1900 |
1274826700.ln: 1274826700.ln:
| see in TUEV Certificates 2015-TUEV 6291-2, Altoel,TUEV-Bericht 2511257434 | Sep-19 | - | |||||||||||
| 1 | Mc Cully | 6295-4 | Waste Oil | 3,000 | UST | 50/120346 | Stefan Nau | Leak detection system | decommisioned | 1986 | Jan-20 | - | |
| 1 | Mc Cully | 6295-5 | Waste Oil | 5,000 | UST | 50/118172 | Stefan Nau | Leak detection system | decommisioned | 1985 | Dec-19 | - | |
| 1 | Mc Cully | 7200-1 | Waste Oil | 10,000 | UST | 03/56603 | Stefan Nau | Leak detection system | Double Walled Tank | 1987 | Feb-22 | Feb-27 | |
| 1 | Mc Cully | 7200-2 | Waste Oil | 5,000 | UST | 50/122013 | Walter Kraemer | Leak detection system | decommisioned | 1987 | Feb-22 | - | |
| 1 | KHA | 7539-2 | Waste Oil | 3,000 | UST | 50/117631 | Stefan Nau | Leak detection system | Double Walled Tank | 1984 | Nov-15 | Nov-20 | |
| 14 | Waste Oil | 71,500 | Total Capacity |
Antifreeze Deicing
| Tank Inventory Maintenance & TUEV Inspection Schedule | ||||||||||||
| USAG Wiesbaden | ||||||||||||
| Antifreeze Tanks | HEO-POL- Section | |||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Remarks | Year of Manufactury | last PM | next PM | |
| 1 | Clay | 1211-3 | Antifreeze | 1,000 | UST | 134730 | unknown | Leak detection System | decommisioned | 1993 | Dec-19 | - |
| 1 | Clay | 1223-3 | Antifreeze | 1,000 | UST | 50/134728 | Stefan Nau | Leak detection System | Double Walled Tank | 1993 | Sep-23 | Sep-28 |
| 1 | Clay | 3500-3 | Antifreeze | 3500 | UST | 035-2102 | HAASE Tank | Leak detection System | Double Walled Tank | 2011 | Mar-23 | Mar-28 |
| 1 | Mc Cully | 6291-1 | Antifreeze | 1,000 | UST | unknown | unknown | Leak detection System | shall be closed | 2001 | 2019 | - |
| 1 | Mc Cully | 6295-1 | Antifreeze | 3,000 | UST | 50/120345 | Stefan Nau | Leak detection System | decommisioned | 1985 | 2019 | - |
| 1 | Mc Cully | 6295-2 | Antifreeze | 1,000 | UST | 50/120344 | Stefan Nau | Leak detection system | shall be closed | 1985 | 2019 | - |
| 1 | Mc Cully | 6295-3 | Antifreeze | 3,000 | UST | 50/122424 | Stefan Nau | Leak detection System | decommisioned | 1987 | 2019 | - |
| 1 | Kastel HA | 7539-1 | Antifreeze | 1,000 | UST | 50/123930 | Stefan Nau | Leak detection System | decommisioned | 1989 | 2019 | - |
| 1 | Clay | 1004-1 | De-Icing | 40,000 | AST | unknown | unknown | Leak detection System | Double Walled Tank | unknown | Sep-23 | Sep-28 |
| 1 | Clay | 1004-2 | De-Icing | 40,000 | AST | unknown | unknown | Leak detection System | Double Walled Tank | unknown | Sep-23 | Sep-28 |
| 10 | Antifreeze | 94,500 | Total Capacity |
Propane
| Tank Inventory Maintenance & TUEV Inspection Schedule | |
| USAG Wiesbaden |
Propane Gas Tanks
| Location | Bldg. # | Contents | Capacity | AST | Tank ID # | Manufacturer | Construction | |||
| Ltr. | UST | Year | last PM | next PM | ||||||
| 1 | Mainz-Kastel Station | 4006 | Propan | 4,850 | AST | 157028 | Flamco STAG GmbH | 2016 | Nov-23 | shall be closed |
| 1 | Rheinblick Golf Course | 5136-3 | Propan | 6,400 | AST | 36593 | Walter Kraemer | 1990 | Apr-23 | Apr-28 |
| 1 | Hainerberg Laundrette | 7762-2 | Propan | 6,400 | AST | 39101235 | Vychodoceske Plynarenske Strojirny, a.s. | 2016 | Nov-23 | Nov-28 |
| 1 | Hainerberg Laundrette | 7762-3 | Propan | 6,400 | AST | 39101240 | Vychodoceske Plynarenske Strojirny, a.s. | 2016 | Nov-23 | Nov-28 |
| 4 | Propan | 24,050 | Total Capacity |
| Prüfung nach Betriebssicherheitsverordnung. |
| Kein wassergefährdender Stoff. |
Filling Areas Tank Inventory Maintenance & TUEV Inspection Schedule
| Tank Filling Stations | |||||||||||
| Location | Bldg. # | Contents | Capacity | AST/ UST | Tank ID # | Manufacturer | Safety System | Year of Manufactury | last PM | next PM | |
| 1 | Hainerberg Housing Area PX (DOL) | 7883 | 1 | May-23 | May-28 | ||||||
| 1 | Kastel Storage Station (AAFES) | 4505 | 1 | Sep-23 | Sep-28 | ||||||
| 1 | Golf Course | 5136 | 1 | Jan-23 | Jan-28 | ||||||
| 1 | McCully | 6294 | 1 | Jan-23 | Jan-28 | ||||||
| 1 | Clay | 1000 | 1 | Dec-22 | Dec-27 | ||||||
| 1 | Dagger | 4366 | 1 | ||||||||
| 1 | Clay | 1219 | 1 | ||||||||
| 7 | 7 |
Fuel Pumps
| Technical Exhibit C - Tank Inventory List, Maintenance & TUEV Inspection Schedule | ||||||||||||
| USAG Wiesbaden | ||||||||||||
| Fuel Pumps | ||||||||||||
| Qty | Item | Bldg. # | Installation | Disp. Unit | Disp. Unit Qty | Name of pump | Manufacturer | Type | Permission | Unit-No.: | Hose: | |
| cross section | Noul e | |||||||||||
| (Faucet) | Q max (I/min] | Manuf. |
Year
| 1 | Fuel Pump (Fuel Dispenser) | |||||
| 'MOGAS' | 5135 | Rheinblick Golf | ||||
| Course | 1 | 1 | Hose 1:'MOGAS' | Tokheim | QUANTIUMT/ QUANTIUM 200T | ATAX03/207 |
BA EX edms(a)ll t·2 3
| EN 13617/1;CE 0818; EXII2G; | 524040 | Hose I: DN 20 ZVA mit | ||||||
| Gasrueckfuehrung | 40/4:80/8 | |||||||
| 130/13 LPM | 2005 | |||||||
| 1 | Fuel Pump (Fuel Dispenser) 'Diesel' | 5135 | Rheinblick Golf | |||||
| Course | 1 | 1 | Hose 1:'Diesel' | Salzkotten GmbH | 109 | 512708 | Hose I: DN 20 ZVA | 2000 |
| 0 | Fuel Pump (Fuel Dispenser) 'Diesel' | 6294 | McCully |
Wackernheim
| ***Out Of Service*** | 1 | 2 | Hose1:'Diesel LKW' Hose II:'Diesel PKW' | Tokheim | Quantium 310 |
| MID Mi-006. T 10001 | ATEX Zulassung SIRA |
06 ATEX 9268 X; CE 0618;EXII2G; EN 13617-1-2004
| MID Mi-006.T10001 | D1044072 | Hose 1: DN25 | ||
| Hose II:DN20 | Hose 1: ZVA 25 | |||
| Hose II: ZVA 20 | Rl:130/10 | |||
| R2:40/ 4 | 2010 | |||
| 0 | Fuel Pump (Fuel Dispenser) 'Diese'l | 6294 | McCully |
Wackernheim
| ***Out Of Service** | 1 | 2 | Hose 1:'Diesel LKW' Hose II:'Diesel PKW' | Tokheim | Quantium 310 |
| MID Mi -006. T 10001 | ATEX Zulassung SIRA |
06 ATEX 9268 X; CE 0618;EXII2G; EN 13617·1·2004
| MID Mi -006.TlOOOl | 1044071 | Hose1: DN25 |
| Hose II:DN20 | Hose1: ZVA 25 | |
| Hose II: ZVA 20 | R:l130/ 10 | |
| R2:40/4 | 2010 | |
| 2 |
File details come from the government source that posted it. Updated .