This document is a City of Delray Beach Neighborhood Services Division Work Write-Up for a comprehensive residential rehabilitation project located at 908 SW 3rd St in Delray Beach, Florida. The project involves extensive repairs and upgrades to a single-family home, including lead-based paint hazard control, roof replacement, window and door replacements, structural modifications, plumbing and electrical system updates, and complete exterior and interior painting. The scope of work encompasses multiple critical tasks such as removing and replacing tie beams, fascia, and soffit, installing impact windows and doors, returning a garage to its original carport configuration, installing a new heat pump system, replacing bathroom fixtures, and performing global lead paint encasement.
The document does not specify a total project cost, but outlines detailed specifications for each renovation task with placeholders for item costs. The project requires strict compliance with multiple regulatory standards, including HUD Lead Safe Housing requirements, EPA regulations (40 CFR Part 745), OSHA guidelines (29 CFR Part 1926), and the 2023 Florida Building Code 8th edition. All work must be performed by licensed and certified contractors, with specific requirements for plumbing, roofing, and electrical work. The rehabilitation is subject to multiple inspections, including mandatory reviews by the Rehabilitation Compliance Inspector, and requires a final clearance examination. Neighborhood Services will cover the cost of one initial clearance test, with subsequent tests charged to the contractor at $295 each.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100NW 1st Avenue
CITY OF DELRAY BEACH
Work Write-Up
Property Information 908SW 3rd St
Delray Beach Florida
Owner Information Harry Mitchell Sr 908SW 3rd St
Delray Beach Florida 33444-0876 mtch60@gmail.com
561-248-5304 I
NEIGHBORHOOD SERVICES DIVISION
Case#: 22-097 Job Total:$ _
Bid Closing Date:
Bid Opening Date: _
Contractor Information Name:
d]ne.,S, Voice:
Fax:
Email:
Diray BeachFonda 33444
Pone 561-243- 7280
8/27/2025 3:26:38 PM Page 1
QUOTE APPROVAL STATEMENT
The below owner signature hereby declares that the work write - up has been reviewed by the applicant. Furthermore, the owner understands the scope of work to be performed on the owner's property. The applicant understands that there will be no changes to the work write up specifications except to meet housing and or building code requirements. The owner is authorizing the City of Delray Beach to obtain quotes for the work contained in the write up.
•l, tt4e • 1/1/45 »»
Signed; Date;2o25
The below quote's signature hereby declares he/she has received a copy of the Neighborhood Services Division's Instructions to Bidders which includes General Conditions, Parts I and II as well as Special Conditions. By signing this proposal, the bidder is asserting he/she has made a full examination of the existing condition of the location of where the scope of work on this project is to be performed. The bidder hereby also declares that in order to complete the full scope of work he/she agrees to furnish, unless otherwise provided, all implements, machinery, equipment, transportation, tools, materials, supplies, labor and all other necessary items which are to be included in the quote amount submitted above within the following time frame:
The successful bidder will start permit process within three (3) days of the date on the Notice to Proceed. The notice establishes that the work be completed within sixty (60) days from issuance of permit. The bidder understands that the right is reserved by the property owner and the City of Delray Beach, Neighborhood Services Division to reject any and all quotes."
Signed:Date.2O25
Signed: Date:?o25
8/27/2025 3:26:38 PM Page 2
Single Family - ] Single Family - ] Whole Unit - Lead I All Walls - Lead
S.No Workltem Code
0321070116
Units
26.00
Unit Type
LF
Cost Factor
1.00
Priority Item Cost
Task; Remove the Existing Tie Beams
Per HUD Lead Safe Housing requirements, remove and replace with new exterior wood tie beam located on the front porch, and carport of the home. replacement of tie beams are to be replaced per the contractor supplied plans.
Clean the areas per HUD three step process for final clearance compliance.
All repairs per HUD Lead Safe Housing requirements with debris disposal per EPA requirements.
Please refer to the Lead Inspection report for further information on lead based paint test results and location
All repairs are to comply with local codes and Performance Manual guidelines. Install new materials as per manufacturer's recorrmendations with inspections and permits when applicable
Note; Neighborhood Services will pay for (1) clearance, All repeated clearance inspections will be charged to the Contractor at the rate of$295.00 each
IMPORTANT: The above work must be performed by a firm/individuals who hold a valid EPA certificate obtained according to 40 CFR Part 745.
Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA 29 CFR Part 1926. Clearance examination (clearance testing) is required in connection with this work.
0321090108 225.00 I.f. 1.00 2 Lead Hazard Control - Lead Hazard Control $ _
[ask; Remove AII Fascia and Soffit
Remove ALL existing soffi! and fascia per HUD Lead Safe Housing requirements with debris disposal per EPA requirements.
Clean the areas per HUD three step process for final clearance compliance.
All repairs per HUD Lead Safe Housing requirements with debris disposal per EPA requirements. Please refer to the Lead Inspection report for further information on lead based painttest results and location
All repairs are to comply with local codes and Performance Manual guidelines. Install new materials as per manufacturer's recommendations with inspections and permits when applicable.
Note; Neighborhood Services will pay for (1) clearance, All repeated clearance inspections will be charged tothe Contractor at the rate 0f $295.00 each
IMPORTANT: The above work must be performed by a firm'individuals who hold a valid EPA certificate obtained according to 40 CFR Part 745.
Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA 29 CFR Part 1926. Clearance examination (clearance testing) is required in connection with this work.
0329993333
8/27/2025 3:26:38 PM
508.00 sqft 1.00
Task; Install Mulch
Rake the soil and remove paint debris and paint chips. Place non-floating mulch 4" deep. Raking and mulch coverage shall begin at the exterior walls and extend outward away from the walls for a distance of four (4'0") feet.
Location: around the entire perimeter of structure
Note: All paint chip debris associated with this item must be removed from the site prior to the general contractor requesting the LBP clearance test.
Note; Neighborhood Service s will pay for (1) clearance, All repeated clearance inspections will be charged to the Contractor at the rate of $295.00 each
IMPORTANT: The above work must be performed by a firmindividuals who hold a valid EPA certificate obtained according to 40 CFR Part 745.
Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA 29 CFR Part 1926. Clearance examination (clearance testing) is required in connection with this work.
4 0321030101 1.00 ea 1.00 $ _
Iask; Remove and Replace Entry Door Unit
Per HUD Lead Safe Housing requirements, remove the existing Kitchen exterior door, jamb, trim and threshold and dispose of all debris. Provide and install, primed, prehung steel insulated raised panel, exterior 1-3/4" entry door with trim. Include keyed lockset, doorstop, deadbolt, and vinyl bubble weather-stripping. Include any repair to interior walls to bring to original condition. Owner may choose a solid steel door, steel with half moon light panel at top or a nine light panel door.
Clean the areas per HUD three step process for final clearance compliance.
Owner may paint the primed door a color of their choosing after construction and clearance is complete.
• Doors must be energy rated and all warranty paperwork to be given to the owner upon completion
All repairs per HUD Lead Safe Housing requirements with debris disposal per EPA requirements.
Please refer to the Lead Inspection report for further information on lead based paint test results and location.
All repairs are to comply with local codes and Performance Manual guidelines.
Install new materials as per manufacturer's recommendations with inspections and permits when applicable.
Note; Neighborhood Services will pay for (1) clearance, All repeated clearance inspections will be charged tothe Contractorat the rate of $295,00 each
IMPORTANT: The above work must be performed by a firmindividuals who hold a valid EPA certificate obtained according to 40 CFR Part 745.
Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA 29 CFR Part 1926. Clearance examination (clearance testing) is required in connection with this work.
0321070000
8/27/2025 3:26:38 PM
10.00 sq.ft 1.00
Task; Global Encasement
Encase (encapsulate) the below identified building component containing lead-based paint using Prepless Primer and Lead/ock manufactured by Global Encasement, Inc. Contractor shall follow manufacturer's instructions for surface preparation, product application and product coverage.
Contractor may not spray this product (only brush or roller application shall be permitted). When ordering product from manufacturer contractor may use Sherwin Williams color name and color code.
Contractor shall be a "manufacturer approved applicator" and shall provide documentation evidencing such. Contractor shall submit a twenty (20) year manufacturer's performance warranty for work performed at this address with the final closeout package.
Mandatory Inspection: The general contractor shall schedule an inspection with the assigned Rehabilitation Compliance Inspector after applying the Prep/ess Primer and before applying the Leadlock.
Component/Locations: Kitchen as per Lead Report.
Note: All lead based paint contaminated debris associated with this item must be removed from the site prior to the general contractor requesting the LBP clearance test.
Note; Neighborhood Serviceswill pay for (1) clearance, All repeated clearance inspections will be charged to the Contractor at the rate of $295 oo each
IMPORTANT; The above work must be performed by a firm'individuals who hold a valid EPA certificate obtained according to 40 CFR Part 745.
Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA: 29 CFR Part 1926. Clearance examination (clearance testing) is required in connection with this work.
6 0300090129 1.00 EA 1.00 $
Tak; HEPA/WET CLEAN/HEPA, INTERIOR CLEANING
After completion of all abatement, removal of containment and repositioning of all ftmitu-e.
HEPA vacuum all visible su-faces in the dwelling including walls, floors, ceilings and all horizontal su-faces. Wet wipe all surfaces with a lead specific detergent or equivalent and rinse. After surface is dry, HEPA vacuum all visible surfaces except ceiling.
All work to be done per HUD Lead Safe Housing requirements with debns disposal per EPA requirements Please referto the Lead Inspection report for further informationon lead based painttest resultsand location
Note. Neighborhood Services will pay for (1) clearance, All repeated clearance inspections will be charged to the Contractor at the rate of $295.00 each.
4¢4444444444¢44¢44ff444444444444444444444
MPORTANT. The above work must be performed by a firm/individuals who hold a valid EPA certificate obtained according to 40 CFR Part 745. Work must at minimum comply with HUD: 24 CFR Part 35, EPA: 40 CFR Part 745, and OSHA: 29 CFR Part 1926. Clearance examination (clearance testing) is required in comection with this fk 4444%%%%%%%f%%%%%%¢¢¢¢¢44444¢¢%%%¢%%44
Single Family - ] Single Family - ] Whole Unit - Roof I Roof -
S.No Workltem Code Units Unit Type Cost Factor Priority Item Cost
7 0070010001 1067.00 SF 1.00 $
8/27/2025 3:26:38 PM Page 5
Task; Tear Off Existing Roof and Install New
All roofing work must be performed by a roofing contractor who holds a current CC and RC license with the State of Florida.
Remove entire sloped roof covering. Replace damaged sheathing, replace / repair damaged rafters, and related roof components. All fascia, soffit repair/replacement is included in line item cost. Replace defective or damaged soffit venting/screening to match existing as needed. Contractors shall include in their bid replacing up to 48 If of rafter/trusses top chords, and up to "5" full sheets of sheathing or 160 sq ft of exposed planking if needed Damage in excess of "5" Sheets of sheathing or 160 sq ft of planking and up to 48 If of rafter/truss top chords shall be addressed in a change order. Replacement sheathing shall be minimum 19/32" plywood but may be thicker to match existing sheathing. In instances where the sheathing is an exposed ceiling, replacement sheathing shall match existing and may be planks.
Contractors shall submit the installed unit cost for change order material above the covered damage as follows:
Sheet of plywood sheathing (each) above the covered 5 sheets $ _ Square foot of planking above the covered 160 sq ft $ _ Liner foot of rafter/trusses top chords above the covered 48 If $ _
Plywood sheathing joints shall be covered with a 4"-6" self-adhering bitumen, and plank ortongue and groove sheathing shall be covered with a double layerofASTM30 lb. felt paper, Secondary waterbarrierwill be applied directly to the plywood sheathing.
Contractorshall submitphotos ofthe secondarywater barrierwhen requesting payment forthis item
All roof sheathing/decking nailing shall be brought up to meet the 2023 Florida Building Code 8th edition. Existing fasteners may be used to partially satisfy this requirement and additional nailing shall consist of the required ring shank nails.
Install two (2) layers of ASTM 30 lb. felt paper. Then install 40 year rated quality or equal, laminated (dimensional) shingle, self-sealing, fungus resistant fiberglass shingles, to meet the 2023 Florida Building Code 8th edition. Install new ridge vent per shingle manufacturer's specifications over all roof ridge. New 3"x 3" metal drip edge (see note below) and flashing shall be installed throughout the entire roof system. The entire new roof system shall conform to building code of the City of Delray Beach Building Division.
Note 1: Contractor shall replace existing 1 "x 2" build-out for the drip edge at the top of fascia. If no 1 "x 2" exists at the top of the fascia, the contractor shall install all new 1"x 2" primed and painted to match existing fascia color.
Note 2: The metal drip edge shall be a minimum 3"x 3". Fastening of the drip edge shall be with nails placed into the sheathing, roof rafter, truss, or sub-fascia. No fasteners shall penetrate intothe fasciaor1 x 2 wood drip edge nailer.
Note 3: This item will have a mandatory inspection with the rehabilitation inspector.
Note 4: Owner shall have choice of shingle color.
Note 5: One 36" layer of self-adhering modified underlayment shall be placed above flashing in all valleys.
Note 6: Replace deteriorated fascia and soffit. A rrinimum of 6 feet must be maintained between joints or corners. Fill all nail holes in all affected wood, seal with caulking the seams of joints of wood where they meet the soffi! and prepare for paint apply one (1) coat of acrylic primer/sealer and two (2) coats of acrylic exterior grade paint. Paint is to match existing color as close as possible. Masonry grade paint or wood grade paint, as appropriate, shall be applied. Primer and paint shall be of the same manufacturer, Sherwin Williams or equal. Replace deteriorated soffi! and venting to match existing as needed.
8 0070010008 256.00 SF 1.00 $
8/27/2025 3:26:38 PM Page 6
Iask;Flat Deck Cap Sheet Roof w/ Slope Roof Transition
All roofing work must be performed by a roofing contractor who holds a current CC/RC licence with the State of Florida.
Remove entire flat deck roof covering. Replace damaged sheathing, repair/replace damaged rafters and related roof components. Replace defective or damaged soffi! venting/screening to match existing as needed. Contractors shall include in their bid replacing up to 48 If of rafter/trusses top chords, and up to "5" full sheets of sheathing or 160 sq ft of exposed planking if needed Damage in excess of "5" Sheets of sheathing or 160 sq fl of planking and up to 48 If of rafler/truss top chords shall be addressed in a change order. Replacement sheathing shall be minimum 19/32" plywood but may be thicker to match existing sheathing. In instances where the sheathing is an exposed ceiling, replacement sheathing shall match existing and may be planks.
Contractors shall submit the installed unit cost for change order material above the covered damage as follows:
Sheet of plywood sheathing (each) above the covered 5 sheets $ _ Square foot of planking above the covered 160 sq ft $ _ Liner foot of rafter/trusses top chords above the covered 48 If $. _
All roof sheathing/decking nailing shall be brought up to meet the 2023 Florida Building Code 8th edition. Existing fasteners may be used to partially satisfy this requirement and additional nailing shall consist of the required ring shank nails. Plywood sheathing joints shall be covered with a secondary water barrier.
Place 16" wide, 26 gauge ,valley sheet metal along the length of transition from the shingles roof into the new flat deck roof. Install a 4 ply built up roof system consisting of 75# fiberglass base sheet, 3 plys of hot mopped fiberglass finishing with a hot mopped mineral surfaced modified fiberglass cap sheet. New 3"x 3" metal drip edge (see note below) and flashing shall be installed throughout the entire roof system. The entire new roof system shall conform to the 2023 Florida Building Code 8th edition.
Note 1: Contractor shall replace existing 1"x 2" build-out for the drip edge at the top of fascia. If no 1"x.2" exists at the top of the fascia, the contractor shall install all new 1"x 2" primed and painted to match existing fascia color.
Note 2: The metal drip edge shall be a minimum 3"x 3". Fastening of the drip edge shall be with nails placed into the sheathing, roof rafter, truss, or sub-fascia. No fasteners shall penetrate into the fascia or 1x2 wood drip edge nailer.
Note 3: This item will have a mandatory inspection with the rehabilitation inspector.
Note 4: Hot mopped tar overlapping cap sheet and flashing shall have the cap sheet mineral granules spread on the tar to protect it from UV (Sun) damage.
Note 5: Plywood sheathing joints shall be covered with a 4"-6" self adhering bitumen secondary water barrier applied directly to the plywood sheathing. If planks Two layers of 30# felt will be used. Contractor shall submit photos of the secondary water barrier when requesting payment for this item.
Single Family - ] Single Family - [ Sidewalls - ] Walls -
S.No Workltem Code Units Unit Type Cost Factor Priority Item Cost
9 0000000001 1.00 Set 1.00 $
Task; Provide Certified Plans
Contractor is to provide certified plans for submittal to the building department as required. Plans are to include new posts with needed material, structural details, footers, new tie beams to replace lead contaminated tie beams. Include connection details for the following locations as required.
• Locations: Front Porch, New Car Port
Enclosed Garage Back To Car Port "Original Use" (Match Carport Design to House East of Property
10 0010070006 78.00 SF 1.00 $
Task; Replace Porch Structure
Remove and dispose of all defective materials existing front porch structure including supporting post's. Rebuild new porch, and support posts according to contractor supplied approved certified and sealed plans that is previous included in this work write-up. Mer construction, match existing finishes and prepare for paint.
11 0177060101 1.00 SF 1.00 $
8/27/2025 3:26:38 PM Page 7
Iask; Return Garage to Carport - Original Use
Remove exterior walls that were added to enclose garage according to certified plans acquired by winning contractor supplied plans. Rebuild new carport, according to contractor supplied approved certified and sealed plans that is previous included in this work work-up. After construction match existing finishes and prepare for paint.
(Match Carport Design to House East of Property as close as possible)
12 0010100001 11.00 NO 1.00 $
Task; Install Impact Windows
Remove ALL existing windows. Replace windows with new missile resistant single hung windows with aluminum framed screen. Bathrooms shall have obscure glass. One egress window shall be installed in each sleeping room. Replace/repair damaged window sills with marble sill(s) or match existing finish. Provide Modifications to openings and move electric outlets or switches as necessary to accommodate the new windows.
Note 1: Contractor shall submit 2023 Florida Building Code 8th edition approvals, stamped by the City of Delray Beach Building Department, with this Project's close-out package.
Note 2: Patch holes and touch up the paint patches and discolored finish resulting from the removal of existing window(s) to match existing as close as possible. The inspector shall be responsible for determining if the touch-up paint matches as close as possible.
13 0010090006 2.00 EA 1.00 $
Task; Install Prehung Exterior Impact Door
Remove the existing front door3+ and jamb(s), prepare (a) sufficient door buck(s), and install a pre-hung metal clad six (6) panel door(s). The door must be Hurricane impact Test Rated and meet or exceed 2023 Florida Building Code 8th edition standards. Patch to match interior and exterior walls, install new interior wood casing and exterior wood brick mold. Prepare new door assembly for painting by washing with TSP and a light sanding then apply one (1) coat of acrylic primer/sealer and two (2) coats of acrylic seni-gloss paint to match existing finishes.
Door installation shall include keyed entry lockset with lever handle both sides: "Schlage", Flair F51 and matching deadbolt or approved equal, deadbolt keyed one side to the lockset, peep hole, vinyl bubble weatherstripping, wind crash chain stop, and aluminum threshold.
Note 1: Doorpaint color choice shall be by ownerin accordance with deed restrictions, homeowner'sassociation, and building codeof jurisdiction Contractor shall comolywith manufacturer recommended time intervals between coats of paint and shall deliver a smoothfull paint coverage., Roller and brush marks. runs. orange peels. and otherdefective paint application shall not be accepted
Note 2: Touch-up paint affected finishes resulting from the replacement of the door(s). to match existing as close as possible. Inspector shall be responsible for determining if the touch-up paint matches as close as possible.
Note 3: Contractor shall subnit Impact Resistant Rated Florida Building Code product approvals, stamped by the Delray Beach Building Division, with this Project's close-out package. Door assembly shall meet current 2023 Florida Building Code 8th edition product approval without using interior slide bolts.
Note 4: A landing is required according to code. In the absence of a landing, Contractor shall construct a concrete landing in front of the door as required by code, (or where a landing exists, Contractor shall re-construct/modify the existing landing in order to meet code.)
14 0100020001 1325.00 SF 1.00 $ _
Task; Paint House Complete
Pressure clean with water, fill all cracks and holes, and prepare for paint by scraping off loose and peeling paint, and light sanding of all the exterior wood including, fascia, soffit, doors, garage door, trim, and columns. Contact the rehabilitation inspector and request an inspection (24 hour notice to inspect will be made available). Upon an approval given of pressure cleaning, proceed and apply one (1) coat of acrylic primer/sealer and two (2) coats of acrylic exterior grade paint. Masonry grade paint or wood grade paint, as appropriate, shall be applied. Primer and paint shall be of the same manufacturer, Sherwin Williams or equal. Include all trim and shutters with complete house painting.
Note #1: Paint color choice shall be by owner in accordance with deed restrictions, homeowner's association, and building code of jurisdiction.
Note #2: Masonry surfaces painted with a spray applicator shall be back-rolled to ensure complete coverage.
Note #3: Contractor shall comply with manufacturer recommended time intervals between coats of paint.
Note #4: Contractor shall deliver a smooth full paint coverage over the average substrate finish. Roller and brush marks, runs, orange peels, and other defective paint application shall not be accepted.
Single Family - ] Single Family - ] Whole Unit - ] Floor - Interior
S.No Workltem Code Units Unit Type Cost Factor Priority Item Cost
15 0010090024 3.00 NO 1.00 $
8/27/2025 3:26:38 PM Page 8
Task; Install Bi- Fold Doors
Remove existing bi-fold doors and replace them with new double louver sliding bi-fold barn door with hardware kit. Include all necessary hardware to function as designed. Fill all holes and apply one (1) coat of acrylic primer/sealer and paint with two (2) coats of serri-gloss acrylic enamel paint to door and its trim.
Locations: All bedrooms
Note 1: Door paint color choice shall be by owner. Contractor shall comply with manufacturer recommended time intervals between coats of paint and shall deliver smooth full paint coverage. Roller and brush marks, runs, orange peels, and other defective paint application shall not be accepted
Note 2: Touch-up paint affected finishes resulting from the replacement of the door(s). to match existing as close as possible. Inspector shall be responsible for determining if the touch-up paint matches as close as possible.
16 0090010002 1.00 EA 1.00 $ _
Task; Repair Drywall
Remove wall NC unit from North living room wall and dispose of properly. close in with studs, sheathing, siding, insulation, furring and/or masonry as required. and install insulation as needed. Finish inside with drywall and base and shoe if required. Patch wall and ceiling area using similar materials, and match to the average existing finish tape all joints and finish with 3 coat process. The contractor may patch with drywall, tape and finish in the 3-coat process. Apply acrylic primer/sealer and paint corner-to-corner with two coats to match as close as possible.
17 0120040002 2.00 EA 1.00
Task; Install Heat Pump 2 Ton System hstall new 2 Ton 16 Seer mini-split heat pump system, per manufactures instructions, 9,000 BTU indoor air handler with remote control Requires 240/ 25A., 10 yr limited.
Mount and secure condenser to new pad. Connect air handlers and mount unit.
1)size the new furnace/heat pump to the home per ACCA Manual J, Residential Load Calculations, submit your load calculation form wth your bid showing the sizing of the furnace for the design heal load. Do noi over size the 1.111!. NOTE: Urit size may round up lo nearest 1/2 ton, but must noi be undersized.
2) electrical supply must be a dedicated circuit.
3) unit must have a minimum 30 inch front clearance, when installed.
4) check the temp. nise and match to the unit (PMI) All furnace work musi meet or exceed NFPA #54, as well as any other local codes hnstall the ductwork for best possible efficiency, Use a reduced plenum system if possible.
size all ducts for best performance ( PMI ) 1)all joints in retumn air and supply ducts must be sealed
2) install a fillter chamber with a cover
3) filter to be of common, readily available size
Note: All attic installations of combined heating/cooling or condensing furnace equipment, requires the addition of a properly drained overflow pan.
Single Family - ] Single Family - ] Bathroom - ] All Walls - Bathroom
S.No Workltem Code Units Unit Type Cost Factor Priority Item Cost
18 0130040006 1.00 NO 1.00
Iask; Replace Bathroom Sink
Remove and dispose of old sink and replace to code. Include trap, faucets, shut off valve, basket, caulk etc.
All Plumbing work must be performed by a plumbing contractor who holds a current CF and RF license with the State of Florida.
Remove and dispose of old sink and replace to code. Replace with a new sink of the same dimensions, Install new water supply valves, supply lines, and escutcheons, strainer assembly, p-trap and tail assembly, and single handle washer less faucet, Moen or equal quality.
19 0130040023 1.00 NO 1.00
Task; Install Toilet
All Plumbing work must be performed by a plumbing contractor who holds a current CF and RF license with the State of Florida.
Remove the existing toilet, supply water valve and tubing. Replace the toilet with an American Standard "Renaissance", or approved equal, elongated toilet with water saver tank, complete with new seat, bullock, water supply valve, escutcheon and tubing.
Locations:
Note: Toilet shall be grouted where the base meets the floor.
8/27/2025 3 :26:38 PM Page 9
20 0130040019 1.00 EA 1.00 $ _
[ask; Remove Tub / Install Shower
All Plumbing work must be performed by a plumbing contractor who holds a current CF and RF license with the State of Florida.
Remove existing tub down to framing Remove wall materials affected by framing of the new shower. Replace damaged studs, Install wood backing to fasten handicap bars and prepare for cementitious tile backer for the new shower. Remove existing diverter assembly. Replace with new Moen washer-less single handle diverter assembly faucet valves with screwdriver stops. Install new water saving shower head. Reinforce existing floor/sub-floor as necessary and install Kohler Tresham Single Threshold Left-Hand Drain Shower Base with Right-Hand Seat (or equal that sets in mortar). New shower pan shall be set in mortar and positively level. Install new water saving shower head. Install cementitious tile backer and propitiatory fasteners as per manufacturers recommendations. Cementitious tile backer shall be equal to or better than "Wonderboard". Install new ceramic tile, new tile can be up to 12" x 24" Install new bull nose trim around perimeter. Tile to finish a minimum of 6" above the shower head or a minimum of (7) feet.
Accessories shall include a ceramic soap dish and shower niche 24"Wx 12"H placed in the same setting material used for the cerarne tile. Color choice shall be white or bone in color as chosen by the home owner. Install fixed shower curtain rod wall mounted.
Install (3) three stainless steel covered flange grab bars, one on each side (2) two 18" and (1) one 36" Installed per manufactures specifications.
Location: Bathroom
Note 1: Place wood backing to fasten handicap bars prior to hanging cementitious tile backer.
Note 2: Inspections needed during process Rough, Top out, Framing. Plumbing Final
Attention: This work will require a framing inspection from City of Delray Building Division.
21 0130060001 1.00 NO 1.00 $ _
[ask; Install Hot Water Heater All Plumbing work must be performed by a plumbing contractor who holds a current CF and RF license with the State of Florida.
Remove existing water heater, electrical pig tail, and water supply valves. Install a new energy efficient 40 gallon water heater, and Drain Pan with dual 250 volt, 2500 watt heating elements, water supply valves, and pressure relief valve with 3/4" copper piped to the exterior or the new drain pan. Sweat solder copper fittings to connect the new water heater. The electrical connection shall be hard wired.
22 0090040004 75.00 SF 1.00 $
Task; Remove Ceramic Tile
Remove all ceramic tile and repair surface beneath smooth, ready to receive new covering. Bathroom
Single Family - ] Single Family - I Whole Unit - Electrical I All Walls - Electrical
S.No Workltem Code Units Unit Type Cost Factor Priority Item Cost
23 0110040012 4.00 EA 1.00
Task; Carbon Monoxide / Smoke Detector w/ Arc Fault
Install UL approved Combination Carbon Monoxide/Smoke Detectors, wired 115 volt with battery backup. Place in accordance with the electrical and building code of jurisdiction. Contractor shall run a new Ne Fault protected circuit to energize all smoke detectors.
Note: Jurisdiction may require two smoke detectors in hallway and in each bedroom.
24 0110040001 1.00 EA 1.00 $ _
Iask; Install Bathroom Light Fixture
Install new bathroom light fixture, Progress or approved equal. $75 fixture allowance.
Job Total Cost $ ------------------------