Exhibit A-Engineer Proposal Form.pdf
PDF 52 KB Posted
- Solicitation number
- RFP_F-NP-0000000004
- Issued by
- Georgetown County, South Carolina
About this file
This document is an Engineer Proposal Form for the Emanuel Street Sidewalk Project No. 1240, likely involving local municipal engineering services. The project encompasses four primary tasks with specific durations: Preliminary Engineering (2 months), Final Engineering (2 months), Bidding & Procurement Phase (3 months), and Construction Management Phase (5 months). Key activities include design kick-off meetings, survey work, civil plan development at 60% and 90% stages, permitting with DES and SCDOT, bid process management, pre-construction meetings, field observations, and project closeout. The proposal includes comprehensive engineering services from initial design through construction completion.
The proposal is structured as a lump sum (LS) pricing model with five primary cost categories, including four task-specific subtotals and a reimbursables line item covering mileage and document production. While specific dollar amounts are not filled in, the document provides a detailed breakdown of expected engineering work and allows for a prospective engineering firm to complete the proposal with their specific pricing. The form includes sections for company information, business structure declaration, and authorization for the proposal submission, indicating it is a formal solicitation for engineering services for a municipal sidewalk infrastructure project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit C-Emanuel Street Sidewalk Site Map.pdf | ||
| Exhibit D. Consulting Agreement.pdf | ||
| Exhibit B-Mandatory Local Vendor Submittal Form.pdf | ||
| 1 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emanuel Street Sidewalk Project No. 1240
No. TASKS QTY. UNIT FEE
1 Preliminary Engineering - 2 MONTH DURATION
Design Kick-off Meeting
Survey
Preliminary Civil Plans 60%
SUBTOTAL 1 LS
2 Final Engineering- 2 MONTH DURATION
Civil Plans -90% Permit Set
Civil Plans -100% Construction Bid Set
DES and SCDOT Permitting
Attend Design Meetings
Incorporate City's front-end documents with technical specifications
SUBTOTAL 1 LS
3 TASK 3: BIDDING & PROCUREMENT PHASE - 3 MONTH DURATION
Permit Filing and Approvals
Pre-Bid Conference
Bid Addenda
Notice of Award Recommendation
Bid Tab Certification
Answer to bidder's questions
SUBTOTAL 1 LS
4 TASK 4: CONSTRUCTION MANAGEMENT PHASE - 5 MONTH DURATION
Project Management
Pre-Construction Meeting and Meeting Minutes
RFI's, Submittals, and Pay App Reviews
Change Order Reviews
Closeout
Construction Field Observations and Field Reports-Five Site Visits
Perform Punch List Inspection(s) and Review As-builts
Issue Notice of Termination to SCDES and SCDOT
SUBTOTAL 1 LS
5 REIMBURSABLES (Mileage and document production only) 1 LS
Company Name:
Respectfully Submitted By:
(Type/Print Name)
(Title)
Date:
Street:
City, State, Zip Code:
Telephone:
Email:
It is agreed that no person or persons or company other than the firm listed below or as otherwise indicated hereinafter has any interest whatsoever in this proposal or the contract that may be entered into as a result thereof, and that in all respects the
ENGINEER PROPOSAL FORM
The undersigned declares that his/her firm is (use as applicable):
A corporation organized and existing under the laws of the State of ___________________________________
A partnership consisting of: __________________________________________
An individual or sole proprietor: ______________________________________The undersigned declares that the person signing this proposal is fully authorized to sign the proposal on behalf of the firm listed and to fully bind the firm listed to all the conditions and provisions thereof.
TOTAL FEE
File details come from the government source that posted it. Updated .