The file's text, extracted by GovTribe without its formatting.
Ordering Year 1
| Contractor Name: | | | | | |
| SECTION B: CLIN 0001 | | | | | |
| EXHIBIT A: ORDERING YEAR ONE | | | | | |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER (U/I) | AMOUNT |
| A001 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch nominal pipe size (NPS) and smaller. | | | | |
| A001AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| A001AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A001AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A001 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A002 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| A002AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| A002AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A002AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A002 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A003 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty four (24) inch NPS. | | | | |
| A003AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| A003AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| A003AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| A003 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A004 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| A004AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| A004AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A004AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A004 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A005 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| A005AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| A005AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A005AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A005 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A006 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| A006AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| A006AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| A006AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| A006 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A007 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| A007AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| A007AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A007AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A007 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A008 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| A008AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| A008AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| A008AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| A008 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A009 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| A009AA | Temperature of 125 degrees and lower. | 100 | LF | | $0.00 |
| A009AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| A009AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| A009 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A010 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| A010AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| A010AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| A010AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| A010 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A011 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| A011AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| A011AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| A011AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| A011 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A012 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| A012AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| A012AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| A012AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| A012 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A013 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| A013AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| A013AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| A013AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| A013 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A014 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (4) inch NPS to nine (9) inch NSP. | | | | |
| A014AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| A014AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| A014AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| A014 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A015 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NSP. | | | | |
| A015AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| A015AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| A015AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| A015 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A016 | Install new fixed insulation and lagging and/or reusable covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| A016AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| A016AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| A016AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| A016 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A017 | Remove existing and install new insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| A017AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| A017AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| A017AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| A017 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A018 | Patch, repair, and/or re-cloth insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| A018AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| A018AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| A018AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| A018 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A019 | Install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| A019AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| A019AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| A019AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| A019 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A020 | Remove existing and install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| A020AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| A020AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| A020AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| A020 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A021 | Removal of existing and installation of new epoxy covered lagging on steam atomization piping in accordance with the statement of work. | | | | |
| A021AA | Removal of existing epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| A021AB | Installation of new epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| A021 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A022 | Remove existing and install new metal sheathing over piping insulation and lagging in accordance with the statement of work. | | | | |
| A022AA | Removal of existing aluminum sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| A022AB | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| A022AC | Removal of existing aluminum sheathing on piping insulation and lagging, Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| A022AD | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| A022AE | Removal of existing aluminum sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| A022AF | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| A022AG | Removal of existing CRES sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| A022AH | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| A022AI | Removal of existing CRES sheathing on piping insulation and lagging, Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| A022AJ | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| A022AK | Removal of existing CRES sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| A022AL | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| A022 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A023 | Insulation and lagging for Engine Exhaust Uptakes (Gas Turbine, Diesel Engine, Steam Boiler) in accordance with the statement of work. | | | | |
| A023AA | Install new insulation and lagging | 150 | SF | | $0.00 |
| A023AB | Remove existing and install new insulation and lagging | 150 | SF | | $0.00 |
| A023AC | Patch, repair, and/or re-cloth insulation and lagging | 150 | SF | | $0.00 |
| A023 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A024 | REMOVAL ONLY: Remove existing insulation and lagging on different piping systems for the following piping sizes in accordance with the statement of work. | | | | |
| A024AA | Pipe size: Three and one-half (3 1/2) inch nominal pipe size (NPS) and smaller. | 150 | LF | | $0.00 |
| A024AB | Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 150 | LF | | $0.00 |
| A024AC | Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | LF | | $0.00 |
| A024 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A025 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | | | | |
| A025AA | Laboratory testing/analysis of insulation and/or lagging. Applicable to the compartment(s) where the insulation and/or lagging were removed under ELINS A004, A005, A006, A013, A014, A015, A017, A021, A023AB and A024. | 200 | EA | | $0.00 |
| A025AB | Disposal of insulation and lagging removed. Applicable to insulation and lagging removed under ELINS A004, A005, A006, A013, A014, A015, A017, A021, A023AB and A024 | 5,000 | EA | | $0.00 |
| A025 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A026 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | | | | |
| A026AA | CERTIFICATION OF COMPARTMENTS. | 10 | EA | | $0.00 |
| A026 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A027 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | | | | |
| A027AA | Mold Remediation for different piping systems and all NPS pipe sizes. | 100 | SF | | $0.00 |
| A027AB | MOLD REMEDIATION - PROCESSING, ROUTING, APPROVAL, AND COMPLETION OF PCP (PROCESS CONTROL PROCEDURE) | 5 | EA | | $0.00 |
| A027 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A028 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of insulation and lagging services in accordance with the statement of work. | | | | |
| A028AA | Rolling Scaffolding | 50 | HR | | $0.00 |
| A028AB | Fixed Scaffolding | 50 | HR | | $0.00 |
| A028AC | Hanging Scaffolding | 50 | HR | | $0.00 |
| A028AD | Crane Services | 10 | HR | | $0.00 |
| A028 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A029 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | | | | |
| A029AA | ADDITIONAL WORK - LABOR | | | | |
| NOTE: The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HRS | | $0.00 | | |
| A029AB | ADDITIONAL WORK - MATERIALS | | | | |
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate: ______% to be applied to SubELIN A029AB. | 10,000 | Dollars, U.S. | | $0.00 | | |
| A029 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| A030 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A029AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A029 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN A029). | | | | |
| A001 - A029 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | | | | $0.00 |
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | | | | $0.00 |
| ADDITIONAL PERCENT FEE PROPOSED: | | Lot | | $0.00 |
| A030 | ITEM NUMBER TOTAL | 1 | Lot | | $0.00 |
ELIN SUMMARY - ORDERING YEAR ONE
| A001TOTAL | $0.00 | |
| A002 TOTAL | $0.00 | FINAL TOTAL |
| ORDERING YEAR ONE | | | $0.00 |
| A003 TOTAL | $0.00 | |
| A004 TOTAL | $0.00 | |
| A005 TOTAL | $0.00 | |
| A006 TOTAL | $0.00 | |
| A007 TOTAL | $0.00 | |
| A008 TOTAL | $0.00 | |
| A009 TOTAL | $0.00 | |
| A010 TOTAL | $0.00 | |
| A011 TOTAL | $0.00 | |
| A012 TOTAL | $0.00 | |
| A013 TOTAL | $0.00 | |
| A014 TOTAL | $0.00 | |
| A015 TOTAL | $0.00 | |
| A016 TOTAL | $0.00 | |
| A017 TOTAL | $0.00 | |
| A018 TOTAL | $0.00 | |
| A019 TOTAL | $0.00 | |
| A020 TOTAL | $0.00 | |
| A021 TOTAL | $0.00 | |
| A022 TOTAL | $0.00 | |
| A023 TOTAL | $0.00 | |
| A024 TOTAL | $0.00 | |
| A025 TOTAL | $0.00 | |
| A026 TOTAL | $0.00 | |
| A027 TOTAL | $0.00 | |
| A028 TOTAL | $0.00 | |
| A029 TOTAL | $0.00 | |
| A030 TOTAL | $0.00 | |
Ordering Year 2
| Contractor Name: | | | | | |
| SECTION B: CLIN 0001 | | | | | |
| EXHIBIT B: ORDERING YEAR TWO | | | | | |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER (U/I) | AMOUNT |
| B001 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch nominal pipe size (NPS) and smaller. | | | | |
| B001AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| B001AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B001AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B001 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B002 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| B002AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| B002AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B002AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B002 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B003 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty four (24) inch NPS. | | | | |
| B003AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| B003AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| B003AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| B003 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B004 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| B004AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| B004AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B004AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B004 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B005 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| B005AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| B005AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B005AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B005 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B006 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| B006AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| B006AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| B006AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| B006 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B007 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| B007AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| B007AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B007AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B007 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B008 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| B008AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| B008AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| B008AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| B008 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B009 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| B009AA | Temperature of 125 degrees and lower. | 100 | LF | | $0.00 |
| B009AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| B009AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| B009 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B010 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| B010AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| B010AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| B010AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| B010 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B011 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| B011AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| B011AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| B011AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| B011 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B012 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| B012AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| B012AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| B012AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| B012 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B013 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | | | | |
| B013AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| B013AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| B013AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| B013 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B014 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (4) inch NPS to nine (9) inch NSP. | | | | |
| B014AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| B014AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| B014AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| B014 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B015 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NSP. | | | | |
| B015AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| B015AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| B015AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| B015 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B016 | Install new fixed insulation and lagging and/or reusable covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| B016AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| B016AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| B016AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| B016 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B017 | Remove existing and install new insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| B017AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| B017AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| B017AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| B017 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B018 | Patch, repair, and/or re-cloth insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| B018AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| B018AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| B018AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| B018 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B019 | Install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| B019AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| B019AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| B019AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| B019 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B020 | Remove existing and install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| B020AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| B020AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| B020AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| B020 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B021 | Removal of existing and installation of new epoxy covered lagging on steam atomization piping in accordance with the statement of work. | | | | |
| B021AA | Removal of existing epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| B021AB | Installation of new epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| B021 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B022 | Remove existing and install new metal sheathing over piping insulation and lagging in accordance with the statement of work. | | | | |
| B022AA | Removal of existing aluminum sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| B022AB | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| B022AC | Removal of existing aluminum sheathing on piping insulation and lagging, Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| B022AD | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| B022AE | Removal of existing aluminum sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| B022AF | Installation of new aluminum sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| B022AG | Removal of existing CRES sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| B022AH | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |
| B022AI | Removal of existing CRES sheathing on piping insulation and lagging, Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| B022AJ | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 10 | LF | | $0.00 |
| B022AK | Removal of existing CRES sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| B022AL | Installation of new CRES sheathing on piping insulation and lagging. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 10 | LF | | $0.00 |
| B022 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B023 | Insulation and lagging for Engine Exhaust Uptakes (Gas Turbine, Diesel Engine, Steam Boiler) in accordance with the statement of work. | | | | |
| B023AA | Install new insulation and lagging | 150 | SF | | $0.00 |
| B023AB | Remove existing and install new insulation and lagging | 150 | SF | | $0.00 |
| B023AC | Patch, repair, and/or re-cloth insulation and lagging | 150 | SF | | $0.00 |
| B023 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B024 | REMOVAL ONLY: Remove existing insulation and lagging on different piping systems for the following piping sizes in accordance with the statement of work. | | | | |
| B024AA | Pipe size: Three and one-half (3 1/2) inch nominal pipe size (NPS) and smaller. | 150 | LF | | $0.00 |
| B024AB | Pipe size: Four (4) inch NPS to nine (9) inch NPS. | 150 | LF | | $0.00 |
| B024AC | Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | LF | | $0.00 |
| B024 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B025 | Laboratory testing/analysis and disposal of insulation and lagging in accordance with the statement of work. | | | | |
| B025AA | Laboratory testing/analysis of insulation and/or lagging. Applicable to the compartment(s) where the insulation and/or lagging were removed under ELINS B004, B005, B006, B013, B014, B015, B017, B021, B023AB and B024. | 200 | EA | | $0.00 |
| B025AB | Disposal of insulation and lagging removed. Applicable to insulation and lagging removed under ELINS B004, B005, B006, B013, B014, B015, B017, B021, B023AB and B024 | 5,000 | EA | | $0.00 |
| B025 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B026 | CERTIFICATION OF COMPARTMENTS. Provide labor services, equipment and materials for a certified Marine Chemist to certify compartment(s) as "SAFE FOR WORKERS" for the duration of the Period of Performance in accordance with the statement of work. | | | | |
| B026AA | CERTIFICATION OF COMPARTMENTS. | 10 | EA | | $0.00 |
| B026 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B027 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements in accordance with the statement of work. | | | | |
| B027AA | Mold Remediation for different piping systems and all NPS pipe sizes. | 100 | SF | | $0.00 |
| B027AB | MOLD REMEDIATION - PROCESSING, ROUTING, APPROVAL, AND COMPLETION OF PCP (PROCESS CONTROL PROCEDURE) | 5 | EA | | $0.00 |
| B027 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B028 | Scaffolding and Crane Services. Provide labor, services, equipment, and materials for the erection, offload, certification, dismantle and offload of scaffolding in support of insulation and lagging services in accordance with the statement of work. | | | | |
| B028AA | Rolling Scaffolding | 50 | HR | | $0.00 |
| B028AB | Fixed Scaffolding | 50 | HR | | $0.00 |
| B028AC | Hanging Scaffolding | 50 | HR | | $0.00 |
| B028AD | Crane Services | 10 | HR | | $0.00 |
| B028 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B029 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | | | | |
| B029AA | ADDITIONAL WORK - LABOR | | | | |
| NOTE: The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 200 | HRS | | $0.00 | | |
| B029AB | ADDITIONAL WORK - MATERIALS | | | | |
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate: ______% to be applied to SubELIN B029AB | 10,000 | Dollars, U.S. | | $0.00 | | |
| B029 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | % PROPOSED | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| B030 | ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B029AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B029 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B029). | | | | |
| B001 - B029 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | | | | $0.00 |
| ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): | | | | $0.00 |
| ADDITIONAL PERCENT FEE PROPOSED: | | Lot | | $0.00 |
| B030 | ITEM NUMBER TOTAL | 1 | Lot | | $0.00 |
ELIN SUMMARY - ORDERING YEAR TWO
| B001TOTAL | $0.00 | |
| B002 TOTAL | $0.00 | FINAL TOTAL |
| ORDERING YEAR TWO | | | $0.00 |
| B003 TOTAL | $0.00 | |
| B004 TOTAL | $0.00 | |
| B005 TOTAL | $0.00 | |
| B006 TOTAL | $0.00 | |
| B007 TOTAL | $0.00 | |
| B008 TOTAL | $0.00 | |
| B009 TOTAL | $0.00 | |
| B010 TOTAL | $0.00 | |
| B011 TOTAL | $0.00 | |
| B012 TOTAL | $0.00 | |
| B013 TOTAL | $0.00 | |
| B014 TOTAL | $0.00 | |
| B015 TOTAL | $0.00 | |
| B016 TOTAL | $0.00 | |
| B017 TOTAL | $0.00 | |
| B018 TOTAL | $0.00 | |
| B019 TOTAL | $0.00 | |
| B020 TOTAL | $0.00 | |
| B021 TOTAL | $0.00 | |
| B022 TOTAL | $0.00 | |
| B023 TOTAL | $0.00 | |
| B024 TOTAL | $0.00 | |
| B025 TOTAL | $0.00 | |
| B026 TOTAL | $0.00 | |
| B027 TOTAL | $0.00 | |
| B028 TOTAL | $0.00 | |
| B029 TOTAL | $0.00 | |
| B030 TOTAL | $0.00 | |
Ordering Year 3
| Contractor Name: | | | | | |
| SECTION B: CLIN 0001 | | | | | |
| EXHIBIT C: ORDERING YEAR THREE | | | | | |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER (U/I) | AMOUNT |
| C001 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: three and one-half (3 1/2) inch nominal pipe size (NPS) and smaller. | | | | |
| C001AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| C001AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C001AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C001 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C002 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| C002AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| C002AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C002AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C002 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C003 | Install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty four (24) inch NPS. | | | | |
| C003AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| C003AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| C003AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| C003 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C004 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: three and one-half (3 1/2) inch NPS and smaller. | | | | |
| C004AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| C004AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C004AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C004 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C005 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| C005AA | Temperature of 125 degrees and lower. | 500 | LF | | $0.00 |
| C005AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C005AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C005 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C006 | Remove existing and install new insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| C006AA | Temperature of 125 degrees and lower. | 50 | LF | | $0.00 |
| C006AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| C006AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| C006 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C007 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: three and one-half (3 1/2) inch NPS and smaller. | | | | |
| C007AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| C007AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C007AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C007 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C008 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| C008AA | Temperature of 125 degrees and lower. | 1,000 | LF | | $0.00 |
| C008AB | Temperature of 126 degrees to 400 degrees. | 1,000 | LF | | $0.00 |
| C008AC | Temperature of 401 degrees and higher. | 100 | LF | | $0.00 |
| C008 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C009 | Patch, repair, and/or re-cloth insulation and lagging on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| C009AA | Temperature of 125 degrees and lower. | 100 | LF | | $0.00 |
| C009AB | Temperature of 126 degrees to 400 degrees. | 200 | LF | | $0.00 |
| C009AC | Temperature of 401 degrees and higher. | 50 | LF | | $0.00 |
| C009 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C010 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: three and one-half (3 1/2) inch NPS and smaller. | | | | |
| C010AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| C010AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| C010AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| C010 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C011 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Four (4) inch NPS to nine (9) inch NPS. | | | | |
| C011AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| C011AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| C011AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| C011 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C012 | Install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS. | | | | |
| C012AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| C012AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| C012AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| C012 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C013 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: three and one-half (3 1/2) inch NPS and smaller. | | | | |
| C013AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| C013AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| C013AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| C013 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C014 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (4) inch NPS to nine (9) inch NSP. | | | | |
| C014AA | Temperature of 125 degrees and lower. | 100 | EA | | $0.00 |
| C014AB | Temperature of 126 degrees to 400 degrees. | 100 | EA | | $0.00 |
| C014AC | Temperature of 401 degrees and higher. | 25 | EA | | $0.00 |
| C014 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C015 | Remove existing covers and install new reusable insulation and lagging covers on valves and flanges on the following piping systems in accordance with the statement of work. Pipe size: Ten (10) inch NPS to twenty-four (24) inch NSP. | | | | |
| C015AA | Temperature of 125 degrees and lower. | 50 | EA | | $0.00 |
| C015AB | Temperature of 126 degrees to 400 degrees. | 50 | EA | | $0.00 |
| C015AC | Temperature of 401 degrees and higher. | 20 | EA | | $0.00 |
| C015 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C016 | Install new fixed insulation and lagging and/or reusable covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| C016AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| C016AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| C016AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| C016 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C017 | Remove existing and install new insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| C017AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| C017AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| C017AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| C017 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C018 | Patch, repair, and/or re-cloth insulation and lagging and/or covers on machinery, pumps, heat exchangers, water heaters, pipe unions, pipe hangers, and bulkhead penetrations on the following systems in accordance with the statement of work. | | | | |
| C018AA | Temperature of 125 degrees and lower. | 300 | SF | | $0.00 |
| C018AB | Temperature of 126 degrees to 400 degrees. | 300 | SF | | $0.00 |
| C018AC | Temperature of 401 degrees and higher. | 100 | SF | | $0.00 |
| C018 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C019 | Install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| C019AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| C019AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| C019AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| C019 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C020 | Remove existing and install new silicone coated aluminized glass cloth spray shields on the following pipe flanges in accordance with the statement of work. | | | | |
| C020AA | Pipe flanges, three and one-half (3 1/2) inch NPS and smaller. | 50 | EA | | $0.00 |
| C020AB | Pipe flanges, four (4) inch NPS to nine (9) inch NPS. | 50 | EA | | $0.00 |
| C020AC | Pipe flanges, ten (10) inch NPS to twenty-four (24) inch NPS. | 50 | EA | | $0.00 |
| C020 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C021 | Removal of existing and installation of new epoxy covered lagging on steam atomization piping in accordance with the statement of work. | | | | |
| C021AA | Removal of existing epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| C021AB | Installation of new epoxy covered lagging on steam atomization piping, all NPS size pipes. | 10 | LF | | $0.00 |
| C021 | ITEM NUMBER TOTAL | | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT OF ISSUE (U/I) | ESTIMATED PRICE PER U/I | AMOUNT |
| C022 | Remove existing and install new metal sheathing over piping insulation and lagging in accordance with the statement of work. | | | | |
| C022AA | Removal of existing aluminum sheathing on piping insulation and lagging. Pipe size: three and one-half (3 1/2) inch NPS and smaller. | 10 | LF | | $0.00 |