Exhibit_A.pdf
PDF 2 MB Posted
- Attached to
- Repair of the E-3/C-130H Power Supply
- Solicitation number
- FA8117-26-R-B010
About this file
This document is a compilation of Data Item Descriptions (DIDs) that specify format, content, and delivery requirements for various contractor-generated reports and data products used in Department of Defense contracts.
The DIDs cover multiple reporting categories essential to contract performance and asset management. DI-MGMT-80441D specifies the Government Property (GP) Inventory Report format in .xls or .xlsx, requiring contractors to report both Government Furnished Property (GFP) and Contractor Acquired Property (CAP) with detailed column headers including contract number, asset identification, item description, manufacturer details, quantity, unit cost, location, property type, classification, physical inventory dates, and federal condition codes. DI-MGMT-80969 addresses Production Surge Plans, requiring contractors to document maximum sustainable production rates, lists of long-leadtime and critical items, subcontractor capabilities, and material and equipment requirements. DI-MGMT-81838 establishes Commercial Asset Visibility (CAV) Reporting through web-based automated tracking of government-owned reparable assets at commercial repair facilities, including transaction types such as asset receipts, inductions, completions, shipments, and various reporting and maintenance functions. DI-MISC-81832 specifies a Counterfeit Prevention Plan requiring procurement practices from OEM sources, monitoring procedures, receiving inspector training, counterfeit verification processes, and a six-step notification procedure for suspected counterfeit parts. DI-PSSS-81534B defines the Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report in text-searchable format with embedded models, analyzing equipment deficiencies across nine failure categories including workmanship, material failure, design deficiency, and handling deficiencies. DI-PSSS-81656B specifies Bill of Materials (BOM) for Logistics and Supply Chain Risk Management in CSV format, requiring detailed component information including OEM part numbers, CAGE codes, indenture levels, manufacturer details, and obsolescence-related data down to component level. DI-SESS-80639E addresses Engineering Change Proposals (ECP) using DD Form 1692 or acquirer-approved formats. DI-PSSS-81995A establishes Contract Depot Maintenance (CDM) Monthly Production Reports documenting reparables received, inducted, in-process, produced, shipped, and condemned, with performance forecasting and production summaries as required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA811726RB01_00001 SF 30.pdf | ||
| Solicitation - FA811726RB010.pdf | ||
| Package Requirements.pdf | ||
| GFP_Attachment.pdf | ||
| DATA AND REPORTS.pdf | ||
| CDRL_Requirements.pdf | ||
| PWS.pdf | ||
| OA_Chart.pdf | ||
| Transportation_Data.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: Government Property (GP) Inventory Report Number: DI-MGMT-80441D Approval Date: 20200609 AMSC Number: 10184 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2020-012 Applicable Forms: None
Use/Relationship: The Government Property (GP) Inventory Report enables the contractor to periodically provide to the Department of Defense (DoD) Service or Agency an inventory listing of GP (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This Data Item Description (DID) is applicable to all contracts where GP will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
This DID supersedes DI-MGMT-80441C.
Requirements:
1. Reference documents. None.
2. Format. The report shall be in an electronic .xls or .xlsx compatible format.
3. Content. The report shall contain the following column headers (i.e., data fields):
A. Contract Number B. Agency or Service Asset Identification Number (GFP Only) C. Contractor Asset Identification Number D. Item Description E. Manufacturer Part Number F. Manufacturer Model Number G. Manufacturer Serial Number H. National Stock Number (NSN) (if applicable) I. Quantity J. Unit of Measure K. Unit Acquisition Cost L. Unique Item Identifier (if registered in the Item Unique Identification (IUID) Registry;
GFP only) M. Asset Location N. Asset Sub-Location (if applicable) O. Type of Government Property (i.e., Government Furnished Property (GFP) or
Contractor Acquired Property (CAP) P. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling
DI-MGMT-80441D
(ST))
Q. Date of Last Physical Inventory R. Federal Condition Code
END OF DI-MGMT-80441D
Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING
Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A
Use/relationship:
The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.
Requirements:
1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.
2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:
A. Receipt of Asset
1) On Contract
2) Not on Contract
3) Procurement
4) "A" Condition
5) Rotable Pool
6) Loaned Asset
B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments
DI-MGMT-81838
G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers
3. End of DI-MGMT-81838.
TITLE: COUNTERFEIT PREVENTION PLAN
Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:
DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A
Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.
a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.
b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).
c. This DID is related to “As Designed” and “As Built” Parts List.
d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).
Requirements:
1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:
a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.
b. Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.
c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.
d. Training/certification program for receiving inspectors.
e. Process to verify counterfeit.
DI-MISC-81832
- 2 -
f. Processes to identify, store, and report counterfeit parts.
g. Process to ensure subcontracts contain the following requirements (As a minimum):
(1) Requirements to procure only from Original Equipment Manufacturer (OEM) or OEM franchised distributors
(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained
(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain
(4) Training/certification program for receiving inspectors
(5) Process to verify counterfeit
(6) Processes to identify, store, and report counterfeit parts.
(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)
h. Self-audit of internal processes.
i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.
j. Notification Procedure:
(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.
(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.
Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.
DI-MISC-81832
- 3 -
(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:
a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information
b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence
c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)
d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests
e. List of company products affected
(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)
(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.
(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team
END OF DI-MISC-81832
Title: Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report
Number: DI-PSSS-81534B Approved Date: 20220809
AMSC Number: F10348 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2022-004
Applicable Forms: N/A
Use/Relationship: The Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.
a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired, or, when detailed analysis is required for components undergoing a teardown investigation.
b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
c. This DID supersedes DI-PSSS-81534A.
Requirements:
1. Reference documents. None.
2. Format. The ASDP Teardown Deficiency Report shall be in a text searchable format. If a model (e.g., Cameo, CAD, etc.) is used for the analysis or resolution of problems, the model shall be embedded in its native format. The Data Objects/Attributes and Associated Metadata (DOAM) listing shall be in Microsoft Excel spreadsheet format in accordance with the template provided in the DOAM Specification attached to the contract. All data shall be in the English language.
3. Content. The Teardown Deficiency Report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:
a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.
b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.
c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.
Equipment conforms to specifications and TO standards and procedures.
d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.
DI-PSSS-81534B
e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.
f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.
g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.
h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.
i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.
3.1 DOAM. The completed Teardown Deficiency Report template, provided in the DOAM Specification attached to the contract, shall comply with the format requirements (see 2. above) so that it can be ingestible into a Product Lifecycle Management (PLM) solution to ensure proper tying, tracing, and linking to the lowest component of the end item to which the delivered Teardown Deficiency Report Information is applicable. Any field that is not applicable shall be
End of DI-PSSS-81534B.
Title: BILL OF MATERIALS (BOM) FOR LOGISTICS AND SUPPLY CHAIN RISK
MANAGEMENT
Number: DI-PSSS-81656B Approval Date: 20160901 AMSC Number: N9724 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: No Preparing Activity: SA Project Number: PSSS-2016-021 Applicable Forms: N/A
Use/relationship: The Bill of Materials (BOM) will provide information that can be used to establish the production status of parts used in a system. The BOM will also provide Diminishing Manufacturing Sources and Material Shortages (DMSMS) management essential information that enables the identification, forecasting, mitigation, and management of Hardware and Software obsolescence as a part of System Life Cycle Management responsibilities. The data will be used in DMSMS forecasting tools to allow for standard and efficient sharing of information on common items.
The BOM will also provide logisticians and supply chain risk managers with additional data they require to ensure supportability requirements and supply chain risks are identified or mitigated during the development of a system.
This Data Item Description (DID) contains the format, content, and intended use of information for the data product resulting from the work task described by the contract.
The data may be obtained during any program life cycle phase.
This DID supersedes DI-PSSS-81656A.
Requirements:
1. Format. The BOM shall be in a format similar to that of Figure 1.
2. Content. The BOM shall contain all of the information specified in Figure 1, with the path to the system level identified using the part/Next Higher Assembly method detailed in the table.
All fields shall be included. Fields which do not require data shall be left blank. The information shall be included to the lowest indenture level (component level) specified in the contract
D I-
P
SS
S-
6B
F
IG
U R
E
T ab le
: F ie ld
D ef in it io ns a nd
I ns tr uc ti on s
F ie ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
O E
M P ar t
N um be r
T he p ar t n um be r as si gn ed b y th e
O ri gi na l E qu ip m en t
M an uf ac tu re r (O
E M
T hi s m ay b e th e sa m e as th e di ff er en t.
S om et im es r ef er re d to th e
C on fi gu ra ti on P ar t
N um be r or th e D ra w in g
N um be r
R eq ui re d.
R ef er re d to a s th e A lp ha nu m er ic
O
M N am e
T he f ul l l eg al n am e of th e en ti ty th at is p ro vi di ng th e re fe re nc ed p ar t t o th e go ve rn m en t.
S om et im es r ef er re d to a s th e
Pr im e In te gr at or o r
P ri m e
R eq ui re d A lp ha nu m
M C
A G
C om m er ci al a nd
G ov er nm en t E nt it y (C
A G
E co de o f th e
O
M eq ui re d A lp ha nu m er ic
5)
, i nc lu di ng co un tr y R eq ui re d
A lp ha nu m ui re d w he n th e
O E
M h as a w eb si te ha nu m le ar an ce L ev el fa ci lit y ho ld s
R eq ui re d A lp ha nu m
(N on e, fi de nt ia l, S ec re t, T op
S ec t) is io n
D es ig na to r
T he d es ig na to r of th e re vi si on o f th e re fe re nc ed p ar t R eq ui re d if a ss ig ne d
A lp ha nu m
S of tw ar e
F ir m w ar e
V er he d es ig na to r as si gn ed to th e ve rs io n of s of tw ar e fi rm w ar e us ed o n th e re fe re nc ed p ar t
R eq ui re d fo r al l p ar ts c on ta in in g so ft w ar e or f ir m w ar e A lp ha nu m
In de nt ur e L n um be r th at r ep re se nt s th e sp ec if ic le ve l o f th e to p do w n st ru ct ur e sp ec if ie d on th e
B il l o f
M at er ia ls ta rt s w it h th e to p le ve l a s on e N um ef er en ce es ig na to r
A r ef er en ce d es ig na to r id en ti fi es th e re fe re nc ed p ar t.
A
S M
E Y
.4
4-a nd I
E E
E -3
-1 pr ov id e de ta il s fo r th e pr op er c on fi gu ra ti on a nd u se o f re fe re nc e de si gn at or s.
ui re d if a ss ig ne d A lp ha nu m
P
SS
S-
6B
F ie ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
F in d N um be r F in d nu m be r re fe rs to th e or di na l n um be r th at gi ve s an
I D ta g to th e re fe re nc ed p ar t i n a pa rt s li st lis t o f m at er ia ls , b il l o f m at er ia ls ui re d if a ss ig ne d A lp ha nu m
N H
A P ar t
N um be r pa nt
N ex t H ig he r A ss em bl y
(N H
A
. I f th e re fe re nc ed p ar t i s so ft w ar e or f ir m w ar e th en th e N
H A is th e it em th e so ft w ar e is u se d ui re d fo r al l p ar ts e xc ep t t to p le ve l a ss em bl y
A lp ha nu m
A C
A
G E c od e of th e
O E
M o f th e N ui re d fo r al l p ar ts e xc ep t t p le ve l a ss em bl y A lp ha nu m er ic om en cl at ur e T he n am e or d es ig na ti on o f th e re fe re nc ed p ar t R eq ui re d fo r al l p ar ts ha nu m
Q ua nt it y
T he c ou nt o f th e re fe re nc ed p ar t p er
N ui re d fo r al l p ts um io na l S to ck
N um be r
(N S
N of th e re fe re nc ed p ar t R eq ui re d if it em h as N gn ed ha nu m og ni za nc e
(C O
G
C od e:
A tw o-pa rt a lp ha nu m gn at or u se d by th e N av y to p ro vi de s up pl y m an ag em en t i nf or m at io n
R eq ui re d if a ss ig ne d A lp ha nu m
P t N um be r
T he p ar t n um be r as si gn ed b y th e ac tu al m an uf ac tu re r of e re fe re nc ed it em . T hi s nu m be r w il l b e us m ito r th e pa rt f or o bs ol es ce nc e is su ui re d (m ay b e th e sa m re fe re nc ed p ar t i f th e pa rt is m an uf ac tu re d by th e O
E M
A lp ha nu m
M N am e T he f ul l l eg al n am e of th e en ti ty th at a ct ua ll y m an uf ac tu re rs th e re fe re nc ed p ar t R eq ui re d
A lp ha nu m
C
A G
E c od e of th e en ti ty th at a ct ua ll y m an uf ac tu re rs th e re fe re nc ed p ar t
R eq ui re d A lp ha nu m er ic uf ac tu A dd ss in cl ud in g co un tr y
R eq ui re d A lp ha nu m
W eb ui re d w he n th e m an uf ac tu re r ha s a w eb ha nu m ac il it y C le ar ce
L fa ci li ty h ol ds ui re d
A lp ha nu m
(N e, fi de nt ia l, S ec re t, T op S ec t)
P
SS
S-
6B ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
A lt er na te
O E
M p ar t n um be r of th e it em th e re fe re nc ed p ar t i s th e al te rn at e fo r
R eq ui re d if th e re fe re nc ed p ar t i s an a lt er na te to a no th er p at in th e B ha nu m ss em bl y T yp e
Id en tif ie s w he th er th e ite m is
C om m er ci al
O ff th e
Sh el f (C
O T
S
N on
-D ev el op m en ta l I te m
N
D I)
, o r
D ev el op m en ta l I te m
I) ui re d if th e pa rt is a n as se m bl y co ns id er ed C
O
S, I, o r D
I.
S ee th e de fi ni tio ns se ct io n of
C
FR
.1 f fi ni ti ha nu m
(C
T S
, N D
I, o r
I)
B te ri
In di ca te s w he th er a n it em c on ta in s ba tt er ui d.
If e re fe re nc ed p ar t co nt ai ns b at te ri es a nd is a su ba ss em bl y, it s N
H A s ho ul d in di ca te th at it a ls o co nt ai ns ba tt er ie s
Y es
N o
S er vi ce
B ul le tin pp li ca bi lit y
In fo rm at io n re qu ir ed to s ub sc ri be to s er vi ce b ul le ti ui re d if th e pa rt w ill h av e se rv ic e bu lle ti ns is su ed a ga in st it ha nu m
3.
ia R eq ui re m en t:
T he
B O
M s ha ll b e pr ov id ed a s an e le ct ro ni ca ll y ed ita bl e, m ac hi ne -r ea da bl e, C om m a
S ep ar at ed V al ue s (C
S V te xt f il e w ith a lp ha nu m er ic f ie ld s en cl os ed in d ou bl e qu ot at io n m ar ks
E nd o f
D I-
P S
SS
-8
B
Title: ENGINEERING CHANGE PROPOSAL (ECP)
Number: DI-SESS-80639E Approval Date: 20200211
AMSC Number: N10140 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: NM Project Number: SESS-2020-003
Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)
Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and specifies how the proposed change will be implemented.
a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside
USA]).
b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for NORs and Specification Change Notices (SCN) should be contractually imposed in conjunction with this DID.
c. This DID supersedes DI-SESS-80639D.
d. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at https://www.esd.whs.mil/dd/.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. The ECP shall be in one of the following formats:
a. DD Form 1692, Engineering Change Proposal (ECP),
b. or
c. format.
3. Content. The ECP shall contain all the information required by DD Form 1692.
End of DI-SESS-80639E
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Title: CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT
Number: DI-PSSS-81995A Approved Date: 20201130
AMSC Number: F10209 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 70 (419 SCMS/GUBA) Project Number: PSSS-2020-012
Applicable Forms: N/A
Use/Relationship: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.
a. This DID may be used on any depot level maintenance contract.
b. This DID supersedes DI-PSSS-81995.
Requirements:
1. Reference documents. None.
2. Format. The CDM Monthly Production Report shall be in the Table I format below.
3. Content. The CDM Monthly Production Report shall include the following data, provided by the Production Management Specialist (PMS) and the Contractor, through the end of the month:
3.1 Part I: Blocks 1 through 4 of the report shall contain the following information provided by the PMS:
a. As of date: The day, month, and year (DDMMMYYYY) applicable to the report. Data shall be through the end of the month.
b. Block 1: PMS’s name, PMS’s code, PMS’s email address, and PMS’s phone number.
c. Block 2: Contractor name, the Department of Defense Activity Address Code (DoDAAC) assigned to the contractor for shipment of material, the contractor’s Commercial and Government Entity (CAGE) code, the contractor’s email address, and the contractor’s phone number.
d. Block 3: Contract number and Program (PRGM) or Weapon System (WS) supported.
e. Block 4: Government item manager’s or technical Point of Contact’s (PoC’s) name.
3.2 Blocks A through O of the report shall contain the following information:
a. Block A: Item identification, which shall include the Federal Supply Class (FSC) under A-1, and the National Item Identification Number (NIIN) of the item being reported under A-2.
b. Block B: Delivery/Call Order number. When the awarded contract is a delivery/call order type, this is the applicable order number. When an item is awarded on more than one order, the order number is repeated for each order until completed. If the current report completes the call, the word “completed” shall be added.
c. Block C: The contract line item number (CLIN), which shall be the CLIN assigned to the National Stock Number (NSN) in the contract.
DI-PSSS-81995A
d. Block D: Quantity on contract or delivery order (DO)/call
e. Block E: Reparables received, which shall be the number of reparable items received for repair, and shall include the quantity of reparables received during the report month under E-1 and the cumulative quantity of reparables received from the start of the contract through the report month under E-2.
f. Block F: Miscellaneous (Misc.) assets received that are not part of the contract, in various condition codes, which shall include the quantity received during the report month under F-1 and the cumulative total received from the start of the contract through the report month under F-2.
g. Block G: Reparables (REPS) on hand, which shall be the number of reparables on hand waiting for induction into repair.
h. Block H: Total number of reparables currently inducted (IND) into work.
i. Block I: Quantity of reparables awaiting parts (AWP).
j. Block J: Quantity (QTY) produced (PROD), which shall include the quantity that completed repair and was produced during the report month under J-1 and the cumulative total that completed repair and was produced from the start of the contract through the report month under J-2.
k. Block K: Serviceables (SERV) on hand, which shall be the quantity of serviceables on hand awaiting shipping action.
l. Block L: Serviceables shipped, which shall be the number of serviceables shipped from the repair facility, and shall include the number of serviceables shipped during the report month under L-1 and the cumulative number of serviceables shipped from the start of the contract under L-2.
m. Block M: QTY condemned, which shall include the quantity of reparables condemned during the report month under M-1 and the cumulative quantity of reparables condemned from the start of the contract under M-2.
n. Block N: Misc. Shipped/Condemned Shipped, which shall include the misc. assets received in Block F that are not part of the contract, in various condition codes or condemned assets shipped during the report month under N-1 and the misc. or condemned assets shipped from the start of the contract through the report month under N-2.
o. Block O: Next Month Forecast PROD, which shall be the quantity of items scheduled to be produced next month.
3.3 Part II, Production Summary. A Production Summary shall be included only if:
a. The previously reported production forecast was not shipped,
b. The current production forecast does not equal the contract scheduled quantity, or
c. The Contractor anticipates a problem with production in the near future.
P
S S
S -8 d o f
D I-
P S
S S
-8
File details come from the government source that posted it. Updated .