Exhibit A.pdf

PDF 1 MB Posted

Attached to
Level 1 HY-80 Plate
Solicitation number
SPMYM326Q5054
Issued by

About this file

This is a Contract Data Requirements List (CDRL) for HY-80 PLATE materials, containing 11 data items required under Contract Line Item Number 0002, Exhibit A. The contract requires vendor submission of detailed technical and certification documentation to Portsmouth Naval Shipyard for review and acceptance prior to each material shipment.

The required data items include: (A001) Inspection and Test Plan with inspection system procedures per DI-QCIC-81110; (A002) Certification data for special emphasis material covering chemical/mechanical properties per DI-MISC-81020; (A003) Special emphasis certificate of conformance per DI-MISC-80678; (A004) Ultrasonic (UT) test procedures approval prior to any testing, referencing T9074-BD-GIB-010/0300, T9074-AS-GIB-010/271, and ASTM-A435; (A005) NDT ultrasonic test certifications per DI-MISC-80678; (A006) First Article Testing certification per DI-MISC-80809 per T9074-BD-GIB-010/0300 Chapter B.4.3; (A007) Process Control Plan certification per T9074-BD-GIB-010/0300; (A008) Qualification Plan certification per DI-NDTI-80809; (A009) Chemical or spectrographic analysis certification per DI-MISC-80678; (A010) Tension test certification per T9074-BD-GIB-010/0300; and (A011) Impact test certification per T9074-BD-GIB-010/0300. All submissions require one final copy with distribution to the Purchasing Activity and must be submitted under separate shipment numbers. Payment and submission reference clauses 252.232-7006, 252.232-7003, or 52.232-36. The document was prepared by Jason Laflamme on 03/28/2026 and approved by Edward Walsh on 03/31/26.

View the file

Other files

File Type Posted
Attachment 1 -TDP-LLDAX1041- VER 001.pdf PDF
Solicitation - SPMYM326Q5054.pdf PDF
Attachment 2 -TDP-LLDAX1039- VER 001.pdf PDF
Attachment 3 -TDP-LLDAX1040- VER 001.pdf PDF
Exhibit B.pdf PDF
Exhibit C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

INSPECTION AND TEST PLAN

3. SUBTITLE

INSPECTION SYSTEM PROCEDURES

4. AUTHORITY (Data Acqisition Document No.)

DI-QCIC-81110 (SE)

5. CONTRACT REFERENCE

TDP: PARA 3.11.3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Paragraph 10.4 of DI-QCIC-81110 does not apply.

Code 136.2 0 1 0

15. Total 0 1 0

G. PREPAREDBY

Jason Laflamme

H. DATE I. APPROVED BY J. DATE

Page 1 of 11 Page(s) SD Form 1423-1, JUN 90

S/N 0102-LF-010-5600

03/28/2026

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

Edward Walsh 03/31/26

A0002

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

CERT DATA FOR SPECIAL EMPHASIS MATL

3. SUBTITLE

CHEMICAL/ MECHANICAL

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-81020 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.18

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

CODE 133.2 0 1 0

15. Total 0 1 0

G. PREPAREDBY

Jason LaFlamme

H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 2 of 11 Page(s)

S/N 0102-LF-010-5600

03/28/2026 Edward Walsh 03/31/26

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

SPECIAL EMPHASIS C OF C

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (CCDD)

5. CONTRACT REFERENCE

TDP: PARA 3.23

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

CODE 133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 3 of 11 Page(s)

S/N 0102-LF-010-5600

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

PROCEDURES, TEST

3. SUBTITLE

TEST PROCEDURES (UT) APPROVAL

4. AUTHORITY (Data Acqisition Document No.)

UDI-T-23732B

5. CONTRACT REFERENCE

TDP: PARA 3.9

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

PRIOR TO ANY UT

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

CODE 135T 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 4 of 11 Page(s)

S/N 0102-LF-010-5600

16. REMARKS

Block 4 - Paragraph 10.1 of UDI-T-23732B does not apply.

Non-Destructive Test Inspection Procedure:

ULTRASONIC (UT):

Performance: T9074-BD-GIB-010/0300, T9074-AS-GIB-010/271 & ASTM-A435 Acceptance: T9074-BD-GIB-010/0300 & ASTM-A435

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

03/28/2026 Edward Walsh 03/31/26

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.10

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

CODE 133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE J. DATE

DD Form 1423-1, JUN 90 Page 5 of 11 Page(s)

S/N 0102-LF-010-5600

All Test Certifications of NDT Procedures:

ULTRASONIC (UT) with acceptance.

03/28/2026

I. APPROVED BY

Edward Walsh 03/31/26

A

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS-(FAT)

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80809

5. CONTRACT REFERENCE

TDP: PARA 3.3.1

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

CODE 133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE J. DATE

DD Form 1423-1, JUN 90 Page 6 of 11 Page(s)

S/N 0102-LF-010-5600

First Article Testing required IAW T9074-BD-GIB-010/0300, Chapter B.4.3. (FAT)

03/28/2026

I. APPROVED BY

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80809

5. CONTRACT REFERENCE

TDP: PARA 3.3.2

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 12 - See Clause 52.209-3 for submittal timeframes.

Test Certification of the Process Control Plan IAW T9074-BD-GIB-010/0300

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 7 of 11 Page(s)

S/N 0102-LF-010-5600

(Process Control Plan)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-NDTI-80809

5. CONTRACT REFERENCE

TDP: PARA 3.3.3

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

Test Certification of Qualification Plan IAW T9074-BD-GIB-010/0300

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 8 of 11 Page(s)

S/N 0102-LF-010-5600

(Qualification Plan)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.10

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

-Test Certification of Chemical or Spectrographic Analysis IAW T9074-BD-GIB-010/0300

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 9 of 11 Page(s)

S/N 0102-LF-010-5600

(Chemical or Spectrographic Analysis)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.10

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

Test Certification of Tension Test IAW T9074-BD-GIB-010/0300.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 10 of 11 Page(s)

S/N 0102-LF-010-5600

(Tension Test)A010

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

HY-80 PLATE

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A011

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.10

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

Test Certification of Impact Test IAW T9074-BD-GIB-010/0300

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

03/28/2026

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 11 of 11 Page(s)

S/N 0102-LF-010-5600

(Impact Test)

File details come from the government source that posted it. Updated .