This is a Contract Data Requirements List (DD Form 1423-1) specifying five data items required for continuous threaded studs under contract SPMYM326Q5022 with Portsmouth Naval Shipyard (Code 245). All data items are categorized as Technical Data Package (TDP) materials and fall under contract line item 0002, Exhibit A.
The five required data items are: (1) Inspection and Test Plan—Inspection System Procedures (A001, DI-QCIC-81110), due one-time upon receipt with distribution code 136.2; (2) Certification Data for Special Emphasis Material—Chemical and Mechanical properties (A002, DI-MISC-81020), one-time submission with distribution code 133.2; (3) Certification/Data Report—Special Emphasis Certificate of Conformance (A003, DI-MISC-80678), one-time submission with distribution code 133.2; (4) Procedures, Test—Nondestructive Test Liquid Penetrant Inspection Procedure Approval (A004, UDI-T-23732B), required prior to any penetrant testing with distribution code 135T and subsequent submissions as required; and (5) Certification/Data Report—Test Certifications (A005, DI-MISC-80678), one-time submission covering all NDT procedures including liquid penetrant inspection with distribution code 133.2. All certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each material shipment, with each data item submitted under a separate shipment number. No material may ship prior to acceptance receipt. Payment and submission are governed by FAR clauses 252.232-7006, 252.232-7003, or 52.232-36.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 TDP LLDA11014-VER 004.pdf | ||
| Solicitation - SPMYM326Q5022.pdf | ||
| Exhibit B.pdf | ||
| Attachment 2 TDP LLDA11013-VER 003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
INSPECTION AND TEST PLAN
3. SUBTITLE
INSPECTION SYSTEM PROCEDURES
4. AUTHORITY (Data Acqisition Document No.)
DI-QCIC-81110 (SE)
5. CONTRACT REFERENCE
TDP: PARA 3.11.3
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Paragraph 10.4 of DI-QCIC-81110 does not apply.
For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.
Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.
Code 136.2 0 1 0
15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Page 1 of 5 Page(s)
S/N 0102-LF-010-5600
STUD,CONTINUOUS THR
Jason Laflamme Steven W Harmon02/18/2023 02/23/23
A0002
SPMYM326Q5022
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
CERT DATA FOR SPECIAL EMPHASIS MATL
3. SUBTITLE
CHEMICAL AND MECHANICAL
4. AUTHORITY (Data Acqisition Document No.)
DI-MISC-81020 (DD)
5. CONTRACT REFERENCE
TDP: PARA 3.17
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.
133.2 0 1 0
15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Page 2 of 5 Page(s)
S/N 0102-LF-010-5600
D. SYSTEM/ITEM
STUD,CONTINUOUS THR
Jason Laflamme Steven W Harmon07/01/21 02/23/23
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
SPECIAL EMPHASIS C OF C
4. AUTHORITY (Data Acqisition Document No.)
DI-MISC-80678 (CCDD)
5. CONTRACT REFERENCE
TDP: PARA 3.10
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.
For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.
Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.
133.2 0 1 0
15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Page 3 of 5 Page(s)
S/N 0102-LF-010-5600
D. SYSTEM/ITEM
STUD,CONTINUOUS THR
Jason Laflamme Steven W Harmon02/18/2023 02/23/23
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
PROCEDURES, TEST
3. SUBTITLE
NDT PT PROCEDURE APPROVAL
4. AUTHORITY (Data Acqisition Document No.)
UDI-T-23732B
5. CONTRACT REFERENCE
TDP: PARA 3.8
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
PRIOR TO ANY PT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Block 4 - Paragraph 10.1 of UDI-T-23732B does not apply.
Non-Destructive Test Inspection Procedure. Liquid Penetrant Inspection IAW T9074-AS-GIB-010/271, Sampling per MIL-DTL-1222. Acceptance shall be per MIL-DTL-1222 and SAE J123.
For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.
Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.
135T 0 1 0
15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Page 4 of 5 Page(s)
S/N 0102-LF-010-5600
D. SYSTEM/ITEM
STUD,CONTINUOUS THR
Jason Laflamme Steven W Harmon02/18/2023 02/23/23
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
CERTIFICATION/DATA REPORT
3. SUBTITLE
TEST CERTIFICATIONS
4. AUTHORITY (Data Acqisition Document No.)
DI-MISC-80678 (DD)
5. CONTRACT REFERENCE
TDP: PARA 3.9
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
SD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft Final
Reg Repro
16. REMARKS
Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.
All Test Certifications of NDT Procedures:
Liquid Penetrant Inspection with acceptance.
For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.
Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.
133.2 0 1 0
15. Total 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Page 5 of 5 Page(s)
S/N 0102-LF-010-5600
D. SYSTEM/ITEM
STUD,CONTINUOUS THR
Jason Laflamme Steven W Harmon02/18/2023 02/23/23