Exhibit_A.pdf
PDF 1014 KB Posted
- Attached to
- FTIR Spectrometers Federal contract opportunity
- Solicitation number
- N6426720Q0232
About this file
This is a combined synopsis and solicitation for commercial FTIR spectrometers. The Navy seeks to award a single purchase order for FTIRs and associated data items. Required deliverables include calibration certificates, software version descriptions, software change requests, a proposed spare parts list, and commercial off-the-shelf manuals. Responses are due by the date specified in the posting and must be submitted electronically to the provided email address. The solicitation incorporates FAR provisions and clauses by reference. The award will be made to the responsible offeror whose conforming quote is most advantageous based on evaluation criteria in sections L and M of the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QandA N6426720Q0232 Amendment0001.docx | DOCX document | |
| N6426720Q0232 Amendment1.pdf | ||
| N6426720Q0232.pdf | ||
| Attachment_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP________ TM _______ OTHER QCIC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FTIR N64267-20-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 CALIBRATION CERTIFICATE Calibration Certificate
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-80798C
(See Block 16)
SOW Paragraph: 5.1.3
NSWC, Corona Division
TOTAL
PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT (See Block 16) A (See Block 16) (See Block 16) b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A (See Block 16) Draft Reg. Repro
16. REMARKS Daniel M Martinez (MS35) 1
Block 4/5: DI-QCIC-80798C and SOW specification paragraph 5.1.3 shall be used as guidance and are provided for reference. Data points from the actual calibration must be included with this report. Information items in DI-QCIC-80798C that are not relevant to the procurement do not need to be included in format.
Block 10: Frequency of Calibration Certificate (CDRL A001 subtitle) shall be generated for each unit calibrated.
Block 12: Date of first submission shall be in accordance with (IAW) first unit calibrated.
Block 13: Date of subsequent submissions shall be IAW each unit returned to the Government after subsequent calibration is performed.
Block 14: Submission in Contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
NSWC Corona Division Joshua Laker (MS33) 1 NSWC Corona Division With each calibration performed 1
15. TOTAL 3
G. PREPARED BY
H. DATE I. APPROVED BY J. DATE
D. M. Martinez NSWC, Corona (MS35) K. Bergland, NSWCCOR, MS35 28 May 2020
DD FORM 1423 (CDRL) Supplemental
BLOCK 14 ENTRY COMPLETE ADDRESS
Daniel M Martinez, NSWC, Corona MS35, daniel.m.martinez@navy.mil NSWC Corona Division MS Department (Attn: Daniel M Martinez, MS35, Building 521) PO Box 5000 Corona CA 92878-5000
Joshua Laker, NSWC, Corona MS33, joshua.laker@navy.mil
MS Department (Attn: Joshua Laker MS33, Building 521)
Page 2 of 2 Pages
DATA ITEM DESCRIPTION
Title: CALIBRATION CERTIFICATE/REPORT
Number: DI-QCIC-80798C Approved Date: 20170123 AMSC Number: F9766 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 36 Project Number: QCIC-2017-003 Applicable Forms: N/A Use/Relationship: The Calibration Certificate/Report documents calibration certificates or reports accompanying the calibrations performed on Department of Defense (DoD) test, measurement, and diagnostic equipment.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable to contracts requiring calibration of test equipment prior to delivery.
This DID is consistent with ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, requirements for calibration reports or certificates.
(Copies of this document are available online at http://www.iso.org.)
c. This DID supersedes DI-QCIC-80798B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format is acceptable.
3. Content. The calibration certificate or report shall include:
a. Title (e.g., calibration certificate or calibration report);
b. The name and address of the laboratory and the location where the calibrations were carried out, if different from the address of the laboratory;
c. Unique identification of the calibration certificate or test report (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the calibration certificate or test report;
d. The name and address of the client or customer;
e. Identification of the method used;
f. A description of, the condition of, and the unambiguous identification of the item(s) tested or calibrated;
g. The date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2019-07-16T12:34Z Check the source to verify that this is the current version before use.
DI-QCIC-80798C
h. Reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;
i. The test or calibration results with, where appropriate, the units of measurement;
j. The name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the calibration certificate or test report;
k. Where relevant, a statement to the effect that the results relate only to the items tested or calibrated;
l. The conditions (e.g., environmental) under which the calibrations were made that have an influence on the measurement results;
m. The uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;
n. Evidence that the measurements are traceable.
End of DI-QCIC-80798C.
Source: https://assist.dla.mil -- Downloaded: 2019-07-16T12:34Z
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP________ TM _______ OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FTIR N64267-20-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A002 Software Version Description (SVD) Software/Firmware Version Description
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81442A
(See Block 16)
SOW Paragraph: 5.1.7 (See Block 16)
NSWC, Corona Division TOTAL
PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT (See Block 16) A (See Block 16) (See Block 16) b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A (See Block 16) Draft Re g.
Repro
16. REMARKS Daniel M Martinez (MS35) 1 0
Block 4/5: For the description of software and firmware versions provided with each FTIR DI-IPSC-81442A and SOW paragraph 5.1.7 shall be used as guidance and are provided for reference. Information items in DI-IPSC- 81442A that are not relevant to the procured unit do not need to be included in format.
Block 10: Frequency of Software/Firmware Version Description (CDRL A002 subtitle) shall be as generated for each FTIR.
Block 12: Date of first submission shall be in accordance with (IAW) first
FTIR.
Block 13: Date of subsequent submissions shall be IAW each FTIR returned to the Government after warranty repair is performed. The Software/Firmware version shall be the same on all Temperature Humidity Generators delivered.
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
Joshua Laker (MS33) 1 0
With each system delivered 1
15. TOTAL 0 3 0
BLOCK 14 ENTRY COMPLETE ADDRESS
Daniel M Martinez, NSWC, Corona MS35, daniel.m.martinez@navy.mil NSWC Corona Division MS Department (Attn: Daniel M Martinez, MS35, Building 521)
Joshua Laker, NSWC, Corona MS33, Joshua.laker@navy.mil
MS Department (Attn: Joshua Laker MS33, Building 521)
Source: https://assist.dla.mil -- Downloaded: 2019-07-16T12:42Z
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP________ TM __ ____ OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FTIR
N64267-20-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A003 Software/Firmware Change Request Software/Firmware Change Request
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81807
(See Block 16)
SOW Paragraph 5.1.8 (See Block 16)
NSWC, Corona Division TOTAL PRICE
$ 3,420.00
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX C
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
A
N/A
Draft Reg
Rep ro
16. REMARKS Daniel M Martinez (MS35) 1 1 0 Block 4/5: DI-MISC-81807 shall be used as guidance and is provided for reference.
SOW Paragraph 5.1.8 is mandatory to this requirement.
Block 8: Prior notification and Government approval of all Software/Firmware Change Request(s) (CDRL A003 subtitle) for the FTIR is required by the Government. Contractor shall provide a Software/Firmware Change Request to the Government for review, comment, and approval no later than (NLT) 15 calendar days prior to installation of software and/or firmware revisions to any FTIR. Government comments with or without approval will be provided to the contractor within 15 days of receipt of Software/Firmware Change Request providing information explained in
DI-MISC-81807.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/12/13: Submission(s) of Software/Firmware Change Request(s) apply to both new and warranty repaired FTIR and shall be provided to the Government prior to each software/firmware change and initial operating capability (IOC) of the FTIR.
Transmission of the Software/Firmware Change Request(s) data shall follow the requirements specified in SOW paragraph 5.1.8.
Block 14: Submission in Contractor format is acceptable. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
Joshua Laker (MS33) 1 1 0
15. TOTAL 2 2
D. M. Martinez NSWC, Corona (MS35) K. Bergland, NSWCCOR, MS35 05/28/2020
DD Form 1423-1 JUN 90 Previous editions are obsolete. Page 1 of 2 Pages 1077/183
BLOCK 14 ENTRY COMPLETE ADDRESS
Daniel M Martinez, NSWC, Corona MS35, daniel.m.martinez@navy.mil NSWC Corona Division MS Department (Attn: Daniel M Martinez, MS35, Building 521)
MS Department (Attn: Joshua Laker MS33, Building 521)
Data Item Description
Title: Software/Firmware Change Request Approval Date: 20100420 Number: DI-MISC-81807 Limitation: N/A AMSC Number: N9130 GIDEP Applicable: N/A DTIC Applicable: N/A Office of Primary Responsibility: SH/PMS-408 Applicable Forms: N/A
Use/relationship: The Software/ Firmware Change Request will be used to alert or inform the government about changes to software and firmware and also to provide detailed information to the government about the changes and the estimated cost of the software/firmware changes.
This DID contains the format, content and preparation instructions for the data product generated by the specific and discrete work task requirement as delineated in the contract.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions shall be as specified in the contract.
2. Format. The Software/Firmware Change Request shall be presented in the Contractor’s format.
3. Content. The Software/Firmware Change Request shall contain all the information identified in Figures 1-7.
4. End of DI-MISC-81807.
Page 1 of 8 Pages
Source: https://assist.dla.mil -- Downloaded: 2019-07-16T12:45Z
DI-MISC-81807
SOFTWARE CHANGE REQUEST (SCR), PAGE 1
2. DATE
3. JUSTIFICATION CODE
1. ORIGINATOR NAME AND ADDRESS (include e-mail address and telephone number)
Name:
Organization:
Street 1:
Street 2:
City, State, Zip Code:
Telephone Number: ( ) ext:: E-mail address:
4. TYPE OF SCR
Class I Class II
5. PRIORITY
Emergency Urgent Routine
6. SCR DESIGNATION 7. BASELINE AFFECTED
a. CI/CSCI AFFECTED
b. CAGE CODE
c. SYSTEM DESIGNATION
FUNCTIONAL ALLOCATED PRODUCT
d. SCR No.
e. REVISION
f. TYPE Preliminary Final
8. OTHER SYS/CONFIG ITEMS AFFECTED
YES NO
9. IN PRODUCTIO N
YES NO
10. DOCUMENTS AFFECTED
CAGE CODE SPEC/DOC NO. REVISION SCN/NOR/ECN/ECO NO.
11. TITLE OF CHANGE
12. CONTRACT NO. & LINE ITEM
13. CONFIGURATION ITEM NOMENCLATURE
14. PROCURING CONTRACTING OFFICER
15. LOWEST ASSEMBLY AFFECTED
a. NOMENCLATURE
b. PART NO.
16. DESCRIPTION OF CHANGE
17. NEED FOR CHANGE
18. PRODUCTION EFFECTIVITY BY SERIAL NUMBER
19. EFFECT ON PRODUCTION DELIVERY
SCHEDULE
20. RETROFIT
a. RECOMMENDED ITEM EFFECTIVITY
b. ESTIMATED KIT DELIVERY SCHEDULE
c. PLATFORMS AFFECTED
21. ESTIMATED COST or (SAVINGS) UNDER CONTRACT
No Additional Cost/Savings – In Scope of the Contract
22. SUBMITTING ACTIVITY AUTHORIZING SIGNATURE
22a. TITLE
23. APPROVAL/DISAPPROVAL
a. LCCB CHAIRMAN
DATE :
RECOMMEND APPROVAL
RECOMMNED DISAPPROVAL
b. CCB CHAIRMAN
DATE :
APPROVED
DISAPPROVED
Figure 1 Page 2 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 2
SCR NUMBER & REV:
EFFECT ON FUNCTIONAL/ALLOCATED CONFIGURATION IDENTIFICATION
24. OTHER SYSTEMS AFFECTED
25. OTHER CONTRACTORS/ACTIVITIES AFFECTED
26. CONFIGURATION ITEMS AFFECTED
27. EFFECTS ON PERFORMANCE ALLOCATIONS AND INTERFACES IN SYSTEM SPECIFICATION
28. EFFECTS ON EMPLOYMENT, INTEGRATED LOGISTICS SUPPORT, TRAINING, OPERATIONAL, EFFECTIVENESS, OR SOFTWARE
29. EFFECTS ON CONFIGURATION ITEM SPECIFICATIONS
30. DEVELOPMENTAL REQUIREMENTS AND STATUS
31. TRADE-OFFS AND ALTERNATIVE SOLUTIONS
32. DATE BY WHICH CONTRACTUAL AUTHORITY IS NEEDED
Figure 2 Page 3 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 3
SCR NUMBER & REV:
EFFECTS ON PRODUCT CONFIGURATION IDENTIFICATION, LOGISTICS, AND OPERATIONS
(X) FACTOR ENCL. PAR. (X) FACTOR ENCL. PAR.
33. EFFECT ON PRODUCT CONFIGURATION
IDENTIFICATION OR CONTRACT
35. EFFECT ON OPERATIONAL
EMPLOYMENT
a. PERFORMANCE a. SAFETY
b. WEIGHT-BALANCE STABILITY (Aircraft) N/A N/A b. SURVIVABILITY
c. WEIGHT-MOMENT (Other equipment) N/A N/A c. RELIABILITY
d. CDRL, TECHNICAL DATA d. MAINTAINABILITY
e. NOMENCLATURE e. SERVICE LIFE
f. OPERATING PROCEDURES
g. ELECTROMAGNETIC INTERFERENCE 34. EFFECT ON INTEGRATED LOGISTICS
SUPPORT (ILS) ELEMENTS
h. ACTIVATION SCHEDULE
a. ILS PLANS i. CRITICAL SINGLE POINT FAILURE ITEMS
b. MAINTENANCE CONCEPT, PLANS, PROCEDURES j. INTEROPERABILITY c LOGISTICS SUPPORT ANALYSIS
d. INTERIM SUPPORT PROGRAMS 36. OTHER CONSIDERATIONS
e. SPARES AND REPAIR PARTS N/A N/A a. INTERFACE
f. TECH MANUALS/PROGRAMMING TAPES b. OTHER AFFECTED EQUIPMENT/GFE/GFP N/A N/A
g. FACILITIES N/A N/A c. PHYSICAL CONSTRAINTS N/A N/A P h. SUPPORT EQUIPMENT N/A N/A d. COMPUTER PROGRAMS AND RESOURCES
i. OPERATOR TRAINING e. REWORK OF OTHER EQUIPMENT N/A N/A
j. OPERATING TRAINING EQUIPMENT f. SYSTEM TEST PROCEDURES
k. MAINTENANCE TRAINING g. WARRANTY/GUARANTEE
l. MAINTENANCE TRAINING EQUIPMENT h. PARTS CONTROL N/A N/A
m. CONTRACT MAINTENANCE i. ENVIRONMENTAL
n. PACKAGING , HANDLING, STORAGE, AND
TRANSPORTABILITY
N/A N/A j. FMS RELEASE
37. ALTERNATE SOLUTIONS
38. DEVELOPMENTAL STATUS
39. RECOMMENDATIONS FOR RETROFIT
40. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS
a. ORGANIZATION
b. INTERMEDIATE
c. DEPOT
d. OTHER
41. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT
42. THIS CHANGE MUST BE ACCOMPLISHED
BEFORE WITH AFTER THE FOLLOWING CHANGES:
43. IS CONTRACTOR FIELD
SERVICE ENGINEERING
REQUIRED?
YES NO
44. OUT-OF-SERVICE TIME
45. EFFECT OF THIS SCR AND PREVIOUSLY APPROVED SCRs
46. DATE CONTRACTUAL AUTHORITY NEEDED
FOR PRODUCTION:
FOR RETROFIT:
Figure 3 Page 4 of 8 Pages
Figure 4 Page 5 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 5 SCR NUMBER and REV:
48. ESTIMATED COSTS SAVINGS/SUMMARY, RELATED SCRs (Use parentheses for savings)
FACTOR
CAGE CODE
(a)
SCR NUMBER
(b)
COSTS/SAVINGS
UNDER CONTRACT
(c)
OTHER COSTS/
SAVINGS
(d)
a. PRODUCTION COST/SAVING (Subtotal of Costs/Savings Elements from block 51a applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL PRODUCTION COSTS/SAVINGS
b. RETROFIT COSTS (Applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)
SUBTOTAL RETROFIT COSTS
c. INTEGRATED LOGISTICS SUPPORT COSTS/SAVING REVISED
REQUIREMENTS
(1) ITEM RETROFIT (If not covered under “b”) (Applicable to aircraft, ship tank, vehicle, missile, or its subsystem)
(2) ILS SUBTOTAL (Applicable to aircraft, ship, tank, vehicle, missile or its subsystem)
(3) OPERATOR TRAINER (Net total cost/saving from each SCR covering operator trainer)
(4) MAINTENANCE TRAINER (Net total cost/saving from each SCR covering maintenance trainer)
(5) OTHER TRAINING EQUIPMENT
(6) SUPPORT EQUIPMENT (Net total cost/saving from each SCR on support equipment)
(7) ILS PLANS
(8) MAINTENANCE CONCEPT, PLANS, SYSTEM DOCUMENTS
(9) INTERIM SUPPORT PLAN
RECURRING COSTS
NEW REQUIREMENTS
PROCURIN
G
ACTIVITY
CODE
NON-
RECURRING
COSTS UNIT QTY TOTAL
(10) PROVISIONING DOCUMENTATION
(11) OPER TRNR/TRNG DEVICES/EQUIP
(12) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 11)
(13) MAINTENANCE TRNR/TRNG DEVICES/
EQUIPMENT
(14) MANUALS/PROGRAMMING TAPES, SPARES,
REPAIR PARTS (For 13)
(15) SUPPORT EQUIPMENT
(16) MANUALS/PROGRAMMING TAPES (For 15)
(17) PROVISIONING DOCUMENTATION (For 15)
(18) REPAIR PARTS (For 15) N/A N/A N/A N/A N/A N/A N/A
(19) SUBTOTAL ILS COSTS/SAVINGS (Sum of c. 1 through c. 18)
CAGE CODE SCR NUMBER
d. OTHER COSTS/SAVINGS (Total from block 48d of related SCRs)
TOTAL OTHER COSTS/SAVINGS
SUBTOTALS OF COLUMNS
SUBTOTAL UNDER CONTRACT
Figure 5 Pages 6 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 6
SCR NUMBER and REV:
49. TITLE OF CHANGE
50. DATE AUTHORIZATION TO PROCEED
RECEIVED BY CONTRACTOR (YYMMDD)
S START DELIVERY C COMPLETED DELIVERY PROGRESS POINT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Figure 6 Page 7 of 8 Pages a.
C O
(1) Software Engineering
N F I
(2) Software Documentation
G U R
(3) Software Engineering Test
T
(4) Update TDP b.
S
(1) Software Engineering Environment Upgrade
P
(2) Software Test Environment Upgrade
E Q
M c.
(1) Operator
(2) Maintenance
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2
26 27 28 29 30 31 32 33 34 35 36
SOFTWARE CHANGE REQUEST (SCR), Continuation Sheet, Figure 7
TITLE OF CHANGE
SCR NUMBER and REV:
PARAGRAPH# BLOCK/LINE NO. BLOCK TITLE AND SUPPLEMENTARY INFORMATION
Figure 7 Page 8 of 8 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD A TDP________ TM _______ OTHER ILSS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FTIR N64267-20-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A004 PROPOSED SPARE PARTS LIST Reparable Parts List
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ILSS-80134A (See Block 16)
SOW Paragraph: 5.1.6
NSWC, Corona Division
TOTAL
PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT (See Block 16) C
(See Block 16) (See Block 16) (See Block 16) b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A (See Block 16) Draft Reg. Repro
16. REMARKS Daniel M Martinez (MS35) 1
Block 4/5: DI-ILSS-80134A and SOW specification paragraph 5.1.6 shall be used as guidance and are provided for reference. Information items in DI- ILSS-80134A that are not relevant to the procurement do not need to be included in format.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION
AUTHORIZED TO U. S. GOVERNMENT AGENCIES AND THEIR
CONTRACTORS TO PROTECT PUBLICATIONS REQUIRED FOR
OFFICIAL USE OR FOR ADMINISTRATIVE OR OPERATIONAL
PURPOSES ONLY. OTHER REQUESTS FOR THIS DOCUMENT
SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/12/13: Final Repairable Parts List(s) shall be delivered with each new FTIR.
Block 14: Submission in Contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
NSWC Corona Division Joshua Laker (MS33) 1
15. TOTAL 2
BLOCK 14 ENTRY COMPLETE ADDRESS
Daniel M Martinez, NSWC, Corona MS35, daniel.m.martinez@navy.mil NSWC Corona Division MS Department (Attn: Daniel M Martinez, MS35, Building 521)
MS Department (Attn: Joshua Laker MS33, Building 521)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TBD T TDP________ TM TMSS OTHER _________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FTIR N64267-20-D-XXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
T001 Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data
Operator/Service Manual
II
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-TMSS-80527C
SOW Paragraph 5.1.1, NSWC, Corona Division TOTAL
PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
XX C
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
A
N/A (See Block 16)
Dra ft
Reg. Repro
16. REMARKS Daniel M Martinez (MS35) 1 1 0 Block 4/5: DI-TMSS-80527C shall be used as guidance and is provided for reference. SOW paragraph 5.1.1 is mandatory to this requirement and is provided for guidance.
Block 8: Operator/Service Manual (CDRL T001 subtitle) requires government approval. Contractor shall provide a preliminary draft to the Government for review, comment, and approval no later than (NLT) 60 calendar days prior to acceptance testing. Government will provide the Contractor with comments NLT 15 calendar days of receipt of preliminary draft. Contractor shall provide a Government approved final version with incorporated comments NLT 30 days prior to Initial Operating Capability (IOC) of the first system. IOC shall be defined as the Estimated Day of Delivery (EDD) provided by the contractor and included in the base delivery order award.
Block 9: DISTRIBUTION STATEMENT C. DISTRIBUTION AUTHORIZED TO
U. S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS TO PROTECT
PUBLICATIONS REQUIRED FOR OFFICIAL USE OR FOR ADMINISTRATIVE
OR OPERATIONAL PURPOSES ONLY. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO MEASUREMENT SCIENCE
DIRECTORATE, NAVAL SURFACE WARFARE CENTER, CORONA
DIVISION, P.O. BOX 5000, CORONA.
Block 10/12/13: Submissions of Operator/Service Manual(s) shall be provided with each FTIR.
Block 14: Submission in Contractor format is acceptable. Electronic format is desired and acceptable if in MS-Excel or MS Word. Electronic submission of data shall also be on CD-ROM and/or DvD media. Quantity and copies shall be provided IAW CDRL distribution (Block 14a). Addressee's POC information provided on CDRL supplemental page 2.
Joshua Laker (MS33) 1 1 0
With each system installed 1
15. TOTAL 2 3 0
D. M. Martinez NSWC, Corona (MS35) K. Bergland, NSWCCOR, MS35 05/28/2020
DD Form 1423-1 JUN 90 Previous editions are obsolete. Page 1 of 2 Pages 1077/183
BLOCK 14 ENTRY COMPLETE ADDRESS
Daniel M Martinez, NSWC, Corona MS35, daniel.m.martinez@navy.mil
MS Department (Attn: Daniel M Martinez, MS35, Building 521)
MS Department (Attn: Joshua Laker MS33, Building 521)
DATA ITEM DESCRIPTION
Title: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED
SUPPLEMENTAL DATA
Number: DI-TMSS-80527C Approval Date: 20110812 AMSC Number: 9207 Limitation: No DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: TM
Applicable Forms: None
Use/relationship: Commercial Off-the-Shelf Manuals may be used as is or with supplementation to support COTS equipment used by DOD. This DID is used to:
a. Acquire sample COTS manuals for evaluation.
b. Acquire COTS manuals which have been evaluated and found to be acceptable.
c. Acquire associated supplemental data, if required.
This DID contains format, content, and intended use information for the data deliverable(s) resulting from the work described in MIL-PRF-32216.
This DID supersedes DI-TMSS-80527B, dated 17 Oct 2006.
Requirements:
1. Content. The manual shall contain all technical information on the assembly, installation, operation, parts, and maintenance of commercial equipment.
2. Evaluation. The manual shall be evaluated using the criteria found in MIL-PRF-32216.
3. Supplementation. The manual may be supplemented with additional data to comply with contract. Supplemental data shall be prepared in accordance with MIL-PRF-32216.
4. Format. The basic manual shall be in the contractor's format. Supplemental data shall be in the format specified by the contracting activity.
5. Digital files. Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals.
6. PDF Files. PDF files shall be searchable, capable of having links added, and have fonts embedded.
7. IETMs. IETMs shall meet the general style and format and user interface requirements in MIL-PRF-87268 or MIL-STD-40051-1 (Army only) or MIL-STD-3031 (Army only).
8. Paper manuals. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.
Source: https://assist.dla.mil -- Downloaded: 2019-07-16T12:28Z
| CDRL A001_CALCert_ FTIR |
| DI-QCIC-80798C Calibration_Certificate Report |
| CDRL A002_SwFwVersDesc_ FTIR |
| DI-IPSC-81442A Software Version Description (SVD) |
| CDRL A003_SwFwChangeReq_FTIR |
| DI-MISC-81807 Software_Firmware Change Request |
| 23. APPROVAL/DISAPPROVAL |
| Figure 1 Page 2 of 8 Pages |
| SOFTWARE CHANGE REQUEST (SCR), Figure 2 |
| SCR NUMBER & REV: |
| SOFTWARE CHANGE REQUEST (SCR), Figure 3 |
| SCR NUMBER & REV: |
| SCR NUMBER and REV: |
| SOFTWARE CHANGE REQUEST (SCR), Figure 6 |
| SCR NUMBER and REV: |
| SCR NUMBER and REV: |
| CDRL A004_PartsList_FTIR |
| DI-ILSS-80134A_PartsList |
| CDRL T001 Service Manual FTIR |
| DI-TMSS-80527C Commercial Off-The-Shelf (COTS) Manual and Associated Supplemental data |
File details come from the government source that posted it. Updated .