Exhibit A Contract Data Requirements Lists (CDRLs) dated October 03 2022.pdf

PDF 217 KB Posted

Attached to
Post Production Support Services (PPSS) for the Theater Operations (TOPS) Federal contract opportunity
Solicitation number
W519TC-23-R-TOPS
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document contains six Contract Data Requirements Lists (CDRLs) outlining reporting requirements for a federal contract to provide Post Production Support Services (PPSS) for the Theater Operations (TOPS) software module. The CDRLs require the contractor to submit a Program Management Plan, conduct Integrated Project Reviews, provide Monthly Status Reports, submit a Software Release Plan, develop a Quality Assurance Plan, and maintain a Configuration Management Plan on defined schedules. The reports must be submitted electronically in editable Microsoft Word format. The Army Contracting Command-Rock Island intends to solicit and negotiate solely with Apptricity under the authority of FAR 6.302-1, as Apptricity is the sole supplier and holds proprietary rights to the TOPS software. The associated NAICS code is 541512 and the Government anticipates awarding a firm fixed price contract.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, Contract Data Requirements List (1 Data Item)

Form Approved

OMB NO. 0704-

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY: Management OTHER Program Management

D. SYSTEM/ITEM

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A001

2. TITLE OF DATA ITEM

Program Management Plan (PMP)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not Applicable

5. CONTRACT REFERENCE

PWS Section 7

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

See BLK 16

14. DISTRIBUTION

8. APP CODE

A (See Block 16)

N/A 11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

b. COPIES Electronic (MS Word) and Hard Copy

16. REMARKS a. ADDRESSEE

DRAFT

FINAL

Reg Repro

The Program Management Plan (PMP) provides guidance for managing the Sustainment Program from award to closeout and defines the general roles and responsibilities for all stakeholders, as well as tailored Programmatic processes and methodologies that will be applied in ensuring visibility and reporting of performance. The PMP shall include the following processes: Scope Management, Schedule Management, Change Management, Requirements Management, Configuration Management, Risk and Issues Management, regulatory Compliance, and reporting of Contractor Financials.

Block 4: No Data Item Description.

Block 11 and 12: No later than award + 20 calendar days contractor shall provide an initial Plan, and a final Plan no later than 10 business days after government review and comment. The Plan shall be updated as requested by the COR.

Electronic submittals from the contractor shall be editable, in MS Word format, and compatible with the current Government operating environment. Currently, that environment utilizes Microsoft Office Suite and Adobe Reader. Either is acceptable. Submittals shall be made to the government COR or designee (TBD, with facility code and office to be provided).

Blocks 8, 10, and 13: Approval will be based upon government review of content and format. The Government will review drafts and final submittals and may provide comment. All Government comments shall be incorporated into the Plan and updates as specified in Block 13 above.

US Army LIS, Fort Lee VA

0 1 0

15. TOTAL 0 1 0

17. PRICE GROUP

GROUP II

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE-ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY: Management OTHER Meetings and Reports

D. SYSTEM/ITEM

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A002

2. TITLE OF DATA ITEM

Integrated Project Reviews (IPR)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not Applicable

5. CONTRACT REFERENCE

PWS Section 7.3.

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

Quarterly

12. DATE OF FIRST

SUBMISSION

See BLK 16

14. DISTRIBUTION

8. APP CODE

A (See Block

SUBMISSION

Quarterly

b. COPIES Electronic (MS Word) and Hard Copy

16. REMARKS a. ADDRESSEE

DRAFT

FINAL

Reg Repro

The Contractor shall conduct Project In- Process Reviews (IPRs) for Government personnel at the government’ facility with formal documentation addressing accomplishments, planned activities, challenges/ risks/issues as well as reports on ongoing projects.

Block11 and 12: The first IPR will occur no later than five (5) business days after completion of Transition.

Blocks 8 and 13: Approval will be based upon government review of content and format. The Government may comment on items presented and provide guidance or direction to Program activities. Note: Any direction resulting in a contract change’ must be authorized by the Contracting Officer.

Electronic submittals from the contractor shall be editable, in MS Word format, and compatible with the current Government operating environment. Currently, that environment utilizes Microsoft Office Suite, and Adobe Reader. Either is acceptable. Submittals shall be made to the government COR or designee.

US Army LIS, Fort Lee

VA

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY: Management Other Reports

D. SYSTEM/ITEM

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A003

2. TITLE OF DATA ITEM

Monthly Status Reports

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not Applicable

5. CONTRACT REFERENCE

PWS Section 7.2, 9.1.1, and 16.1

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

Monthly

A (See Block

SUBMISSION

Monthly

b. COPIES Electronic (MS Word)

16. REMARKS

a. ADDRESSEE

DRAFT

FINAL

The Contractor shall provide monthly status reports to program personnel. Reg Repro

Blocks 8: Intended as formal monthly reporting with comment or action provided by COR.

Block 11 and 12: The first Monthly Report will occur no later than thirty (30) calendar days following the performance start date or as required by the Government.

Electronic submittals from the contractor shall be editable, in MS Word format, and compatible with the current Government operating environment. Currently, acceptable. Submittals shall be made to the government COR or designee

US Army LIS, Fort Lee

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY: Technical Data Package (TDP) OTHER Software Maintenance

D. SYSTEM/ITEM

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A004

2. TITLE OF DATA ITEM

SOFTWARE RELEASE PLAN (SRP)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not Applicable

5. CONTRACT REFERENCE

PWS Section 16.4.

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

A (See Block

SUBMISSION

As Required

b. COPIES Electronic (MS Word)

16. REMARKS a. ADDRESSEE

DRAFT

FINAL

Reg Repro

The Software Release Plan shall indicate a release schedule for System updates, patches, planned and approved.

Block 10,11 and 12: No later than award + 20 calendar days contractor shall provide an initial Plan, and a final Plan no later than 10 business days after government review and comment. The SRP shall be updated as needed, or as required by the COR, but not less than quarterly.

that environment utilizes Microsoft Office Suite, and Adobe Reader. Either is acceptable. Submittals shall be made to the government COR or designee (TBD, with facility code and office to be provided).

Blocks 8: Approval will be based upon government review of content and format. The Government will review drafts and final submittals and may provide comment.

US Army LIS, Fort Lee

DD Form 1423‐1, Contract Data Requirements List

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

TBD

C. CATEGORY: Technical Data Package (TDP) OTHER Program Management

D. SYSTEM/ITEM

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A005

2. TITLE OF DATA ITEM

Quality Assurance Plan (QAP)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not applicable (see BLK 16)

5. CONTRACT REFERENCE

PWS Section 6. and 14.

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

60 days after Award

A (See Block

SUBMISSION e

As Required

b. COPIES Electronic (MS Word)

16. REMARKS a. ADDRESSEE

DRAFT

FINAL

Reg Repro

The Contractor shall provide the Government with their Quality Assurance Program (QAP) and maintain an effective quality control program to ensure services are performed IAW the contract.

Block 10,12 and 13: The QAP shall be delivered NLT 60 days after contract award for acceptance by the Government. The QAP shall be updated as needed, or as required by the COR.

acceptable. Submittals shall be made to the government COR or designee.

Blocks 8: Approval will be based upon government review of content and format. The Government will review drafts and final submittals and may provide comment.

US Army LIS, Fort Lee

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

C. CATEGORY: Management OTHER Program Management

D. SYSTEM/ITEM TC

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A006

2. TITLE OF DATA ITEM

Configuration Management Plan

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not applicable

5. CONTRACT REFERENCE

PWS Section 6.4.,15, and 15.1.

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

As Required

12. DATE OF FIRST

SUBMISSION See

BLK 16

A (See Block 16)

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

As Required

b. COPIES Electronic web portal

16. REMARKS

The Contractor shall provide a Configuration Management Plan (CMP) detailing how it shall identify and maintain the configuration of all work products.

Block 4: No Data Item Description.

Block 11 and 12: No later than award + 45 calendar days contractor shall provide an initial Plan, and a final Plan no later than 10 business days after government review and comment. The Plan shall be updated as requested by the COR.

Electronic submittals from the contractor shall be editable, in MS Word format, and compatible with the current Government operating environment. Currently, that environment utilizes Microsoft Office Suite, and Adobe Reader. Either is acceptable. Submittals shall be made to the government COR or designee.

Blocks 8, 10, and 13: Approval will be based upon government review of content and format. The Government will review drafts and final submittals and may provide comment. All Government comments shall be incorporated into the Plan and updates as specified in Block 13 above

FINAL

Reg Repro

US Army LIS, Fort Lee

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data source, gathering and maintaining the data needed, and completing and reviewing the collection of information. Sent comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY: Management OTHER System Architecture

D. SYSTEM/ITEM TC

TOPS

E. CONTRACT/PR NO.

Post Award

F. CONTRACTOR

Apptricity

1. DATA ITEM NO.

CDRL# A007

2. TITLE OF DATA ITEM

Integrated Master Schedule (IMS)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

Not applicable (see BLK 16)

5. CONTRACT REFERENCE

PWS Section 16.3

6. REQUIRING OFFICE

US Army Rock Island Contracting Center

7. DD 250 REQ

No

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

Monthly

12. DATE OF FIRST

SUBMISSION See

BLK 16

A (See Block 16)

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

Monthly

b. COPIES Electronic web portal

16. REMARKS

The Contractor shall develop, maintain, and submit a weekly Integrated Master Schedule (IMS) that reflects the TOPS Program Integrated Master Schedule

(IMS).

Block 4: No Data Item Description.

Block 11 and 12: No later than award + 45 calendar days contractor shall provide the initial schedule, and the final schedule. The Contractor shall ensure that its subsequent monthly IMS update under this CDRL reflects the Government baseline or milestone date adjustment.

Electronic submittals from the contractor shall be editable, in MS Word format, and compatible with the current Government operating environment. Currently, that environment utilizes Microsoft Office Suite, and Adobe Reader. Either is acceptable. Submittals shall be made to the government COR or designee

Blocks 8: Approval will be based upon government review of content and format. The Government will review drafts and final submittals and may provide comment. All Government comments shall be incorporated into the Plan and updates as specified in Block 13 above.

FINAL

Reg Repro

US Army LIS, Fort Lee

GROUP I

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE