Exhibit A Contract Data Requirements List (CDRL).pdf
PDF 9 MB Posted
- Attached to
- DRAFT RFP - Space Test Experiment Platform (STEP) 2. 0- AMENDMENT 2 Federal contract opportunity
- Solicitation number
- FA881822R0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| STEP 2.0 Industry Day Special Announcement AMENDMENT 2.pdf | ||
| Attachment 1 Statement of Work (SOW) v2.docx | DOCX document | |
| Attachment 4 DD254 v2.pdf | ||
| Attachment 3 Spacecraft and Ground Technical Specification Sheet (SGTSS) 8 Sept 2022.xlsx | XLSX spreadsheet | |
| Attachment 4 DD254.pdf | ||
| FA881822R0003 DRAFT Request for Proposal 13 Oct 2022.pdf | ||
| Attachment 1 Statement of Work (SOW).docx | DOCX document | |
| Attachment 2 Systems Requirement Document (SRD).docx | DOCX document | |
| Attachment 8 Comment Resolution Matrix (CRM).xlsx | XLSX spreadsheet | |
| Attachment 7 Cost and Software Data Reporting Plan.xlsx | XLSX spreadsheet | |
| Attachment 10 Past Performance Questionnaire 14 Sept 2022.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE J. DATE
Page of Pages
ADMIN
STEP 2.0 FA8818-22-D-0003 TBD
001 Report, Record of Meeting Minutes See Block 16
DI-ADMN-81505 See Block 16 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 0 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
0 1 0
Blocks 3, 5:
SOW 3.2 – Quarterly Management Meeting SOW 3.2 – Quarterly Ground Support Operations Working Group SOW 5.1 – Payload Accommodation Design Reviews (Preliminary and Critical) SOW 8.16 – Mission Readiness Review (MRR)
Contractor format is acceptable.
Blocks 10, 12, 13:
Provide both soft copies Microsoft (MS) Office products, (e.g. Word/Project/Excel) and hard copies of meeting presentation materials at meetings NLT 7 days after the meeting.
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF
I. APPROVED BY
STEVEN FUTCH, Capt, USSF
1 1 Adobe Professional 8.0
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Administrative
STEP 2.0 FA8818-22-D-0003 TBD
002 Funds and Labor Hour Report (FLHR) Funds and Labor Hour Report (FLHR)
DI-FNCL-81537 SOW 3.3 SSC/SZIS
LT
N/A C
See Block 16
See Block16
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
SSC/SZIF 1 1 0
See Distribution Annex
2 2 0
Block 8:
Initial draft report shall be submitted 16 business days after the first full accounting month.
The Government will review and approve the format or provide feedback within 10 business days. The revised initial report shall be due five days after Government feedback is provided. All subsequent reports will not require Government approval.
Block 10/11:
The reporting period is the first day of the calendar month to the last day of the calendar month, however, the contractor's accounting month will be acceptable. If the contractor's accounting month differs, it shall be stated in the report.
Block 12:
First submission is due within 20 working days after the end of the second full accounting period following the contract authority to proceed (ATP).
Block 13:
Subsequent submissions are due no later than 15 working days after the end of the contractor's accounting period cutoff dates.
Block 14:
Submit electronically in Microsoft (MS) Office product (e.g. Excel), or other electronic report version compliant with Microsoft Office. — No Adobe Acrobat files (e.g., PDF format).
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
003 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
DI-MGMT-81804A SOW 3.8.1 SSC/SZIS
LT
NA C
ASREQ
N/A
ASREQ
ASREQ
SSC/SZIS 0 1 0
SSC/SZK-IK 0 0 0
See Distro Annex
0 1 0
Block 3, 5:
Contractor format is acceptable.
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
004 Data Accession List (DAL) DAL
DI-MGMT-81453B SOW 4.6 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 0 1 0
SSC/SZK-IK 0 0 0
See Distro Annex
0 1 0
Block 3, 5:
Contractor format is acceptable.
Blk 12:
The first submittal due 180 cd after contract Authority to Proceed (ATP).
Blk 13:
Subsequent submittals due semi-annually within 5 wd of the anniversary of the contract ATP and the anniversary of the first submittal.
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Administrative
STEP 2.0 FA8818-22-D-0003 TBD
006 Status Report Small Business Funds Status Report
DI-MGMT-80368A SOW 3.5 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 0 1 0
SSC/SZK-IK 0 1 1
See Distribution Annex
0 2 1
Blocks 10, 12, 13:
- Bi-Annual 1; Due NLT 6 March each year
- Bi-Annual 2; Due NLT 6 October each year
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
008 Management Plan Program Management Plan (PMP)
DI-MGMT-80004A SOW 3.6 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blocks 10, 12, 13:
- Draft PMP; Due 15 wd prior to SRR
- Final PMP; Due at SRR
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
009 Training Material Launch Training
DI-ILSS-80872 SOW 9.4 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 0 1
SSC/SZK-IK 0 0 0
See Distribution Annex
1 0 1
Blocks 10, 12, 13:
- Pre-Launch Training; due 30 wd prior to PIRR
- Post-Launch Training; due 30 wd prior to Ground System Review
Blk 14: All copies of written training materials such as texts, manuals, handbooks, or slide presentations shall be delivered electronically in a Microsoft Office or Adobe Acrobat compatible format. Note this does not preclude the use of other electronic audio-visual media as training materials.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
010 Program Protection Implementation Plan (PPIP) PPIP
DI-ADMN-81306 SOW 10.1 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blocks 10, 12, 13:
- Initial PPIP; Due 90 wd after Contract Kickoff
- Annual PPIP; Due on anniversary date of award through end of first year of on-orbit operations
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
011 Contractor's Risk Management Plan RMP
DI-MGMT-81808 SOW 4.5 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 0 1
SSC/SZK-IK
See Distribution Annex
1 0 1
Blocks 10, 12, 13:
- Preliminary RMP; Due 30 wd prior to SRR
- Draft RMP; Due at SRR
- Final RMP; Due at SIRR
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office products, (e.g. Project/Excel) or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
012 Technical Report – Study/Services See Block 16
DI-MISC-80508B See Block16 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 0 1
SSC/SZK-IK 0 0 0
See Distribution Annex
1 0 1
Block 3, 5:
SOW 3.9 – Space Debris Assessment Report (SDAR) and End of Life Plan (EOLP)
(SDAR/EOLP)
SOW 3.9 – Inputs, Spaceflight Worthiness Certification (SFWC) SOW 4.14 – Contamination Control Plan SOW 7.5 – Electromagnetic Interference (EMI) and Electromagnetic Compatibility (EMC) (EMI/EMC) Design Practices SOW 5.5 – Command and Telemetry Formats, Telemetry Engineering Conversions and Timing SOW 6.7 – Payload Handling and Integration Plan SOW 7.7 – Environmental Test and Inspection Reports SOW 8.15 – AF 813, Request for Environmental Impact Analysis SOW 8.5 – Inputs, Launch and Range Requirements SOW 7.6 – SV Assembly, Integration, and Test (AI&T) Reports SOW 7.7.4 – Week in the Life Test Report SOW 8.6 – SV Launch Requirements Document SOW 8.12 – Pre-Ship Review (PSR) SOW 9.2 – Concept of Operations (CONOPS)
Blocks 10, 12 & 13:
- Draft SDAR/EOLP; Due 15 wd prior to PIRR
- Final SDAR/EOLP; Due at PSR
- Draft Inputs, SFWC; Due 30 wd prior to PIRR
- Final Inputs, SFWC; Due at PSR
- Draft Contamination Control Plan; Due 10 wd prior to Payload Accommodation Reviews (critical)
- Final Contamination Control Plan; Due 10 wd to PIRR
- Draft EMI/EMC Design Practices and Control; Due 10 wd prior to Payload Accommodation Reviews (critical)
- Final EMI/EMC Design Practices and Control; Due 10 wd prior to PIRR
- Command and Telemetry Formats, Telemetry Engineering Conversions and Timing; Due 10 wd prior to SIRR
- Draft Payload Handling and Integration Plan; Due 15 wd prior to Payload Accommodation Reviews (preliminary)
- Final Payload Handling and Integration Plan; Due 15 wd prior to Payload Accommodation Reviews (critical)
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
1 3
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
Blocks 10, 12 & 13 continued:
- Environmental Test and Inspection Reports; Due 25 wd following test event
- Draft Inputs, AF 813; Due 15 wd prior to Payload Accommodation Reviews (preliminary)
- Final Inputs, AF 813; Due 15 wd prior to Payload Accommodation Reviews (critical)
- Draft Inputs, Launch & Range Requirements; Due 15 wd prior to PIRR
- Final Inputs, Launch & Range Requirements; Due 30 wd after PIRR
- Week in the Life Test Report; Due 15 wd after Test Event
- SV Launch & Requirements Document; Due 15 wd prior to Payload Accommodation Reviews (critical)
- Draft PSR; Due 15 wd prior to the scheduled review
- Final PSR; Due 15 wd following review completion
- CONOPS; Due 30 wd after contract award
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office products, (e.g. Word/Project/Excel) or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
2 3
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
013 Test Plan See Block 16
DI-NDTI-80566A See Block 16 SSC/SZIS
LT
A C
See Blk 16
N/A
See Blk 16
See Blk 16
SSC/SZIS 1 0 1
SSC/SZK-IK 0 0 0
See Distribution Annex
1 0 1
Blocks 3, 5:
SOW 5.11 – SC Level Integration and Test Plan SOW 6.10 – Payload Bundle Functional Performance Test Procedures SOW 6.10 – Payload Bundle Functional Performance Test Report SOW 7.6 – SV Assembly, Integration, and Test (AI&T) Procedures SOW 7.7 – Environmental Test Plan SOW 7.7.4 – Week in the Life Test Plan
Blocks 10, 12, 13:
- Draft SC Level Integration and Test Plan; Due 20 wd prior to TRR
- Final SC Level Integration and Test Plan; Due 20 wd prior to Test Event
- Draft Payload Bundle Functional Performance Test Procedures; Due 15 wd prior to PIRR
- Final Payload Bundle Functional Performance Test Procedures; Due at TRR
- Payload Bundle Functional Performance Test Report; Due 20 wd after environmental test
- Draft SV AI&T Procedures; Due 20 wd prior to Payload Accommodation Reviews (preliminary)
- Final SV AI&T Procedures; Due 20 wd prior to SIRR
- Draft Environmental Test Plan; Due 20 wd prior to TRR
- Final Environmental Test Plan; Due at TRR
- Draft Week in the Life Test Plan; Due 30 wd prior to TRR
- Final Week in the Life Test Plan; Due 15 wd prior to Test Event
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
014 Packaging Plan Transportation, Handling and Packaging Plan
DI-PACK-80455 SOW 8.10 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 0 1
SSC/SZK-IK 0 0 0
See Distribution Annex
1 0 1
Block 4:
(The DID shall be tailored as follows)
3.1. Change to read: "The Packaging Plan contains information on item characteristics;
item packaging; special handling and transportability requirements; any support equipment required for packaging, handling, and transportation; and packaging concepts applicable to the item(s) being developed."
7.2 Change to read: "The Packaging Plan is applicable to contracts which contain requirements for the contractor to develop and implement packaging, handling, and transportation requirements for item(s)."
7.3 Delete
10.1 Delete
10.3.1 Change to read: "Title Page: The title page shall identify the plan."
10.3.2 Change to read: "Item Description: The characteristics of the item, identified in 10.3.2.a through 10.3.2.e below, which are relevant to packaging, handling, and transportation shall be described.
10.3.4 Change to read: "Performance Requirements of Packaging: Describe appropriate transportation, handling, and storage environmental requirements for the packaged item(s)."
10.3.5 Change to read: "Identification: Describe appropriate standard and special marking requirements."
10.3.6 Delete
10.3.7 Delete
10.3.8 Delete
Blocks 10, 12, 13:
- Draft Transportation, Handling and Packaging Plan; Due at Payload Accommodation Review (critical)
- Final Transportation, Handling and Packaging Plan; Due 20 wd prior to PSR
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
015 Accident / Incident Report Accident / Incident Report
DI-SAFT-81563 SOW 3.9 SSC/SZIS
LT
NA C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 0 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
0 1 0
Blk 4:
(The DID shall be tailored as follows) Replace Use/relationship paragraph with: "This report provides the procuring agency with immediate notification and information concerning any accident/incident (including fire) which will adversely affects the contractor's capability to meet contractual obligations."
Requirements:
Replace existing Para 2 Content with:
"2. Notification and Reporting
2.1. Notification. Provide notification by the end of the next Government (Air Force) working day of any serious accident/incident (i.e. explosion fire, flood, pressure rupture, major malfunction, etc.) resulting in any of the following: fatalities, disabling injuries, damage to Government property exceeding $20,000 or that causes a program delay in excess of 30 calendar days. Do not delay initial notification if all information is not available, provide additional information/updates as information becomes available.
2.2. Report Content. Provide the following information via e-mail as soon as possible."
Blocks 10, 12, 13:
- Verbal notification; Due NLT 24 hours after accident/incident
- Updates; Due by e-mail ASAP as information becomes available
Block 14:
Verbal notification, and provide written distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
016 Product Drawings/Models and Associated Lists Computer-Aided Design (CAD) Drawings
DI-SESS-81000F SOW 7.1 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blocks 10, 12, 13:
- Draft CAD Drawings; Due at SRR
- Final CAD Drawings; Due at Payload Accommodation Review (critical)
Block 14:
Electronic CAD drawings in a 3D .stp and .pdf file formats.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
017 Developmental Design Drawings/Models and Associated Lists Electrical and Mechanical Drawings / Schematics and Specifications
DI-SESS-81002F SOW 7.4 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blk 4:
(The DID shall be tailored as follows) Under Requirements: Delete paragraph 3 and replace with: "3. Format. The format may be in the contractor's format using Microsoft (MS) Office products, (e.g. Word/Project/Excel) or Adobe PDF; however, the contractor shall ensure the government can access the data in a manner that will facilitate government Independent Readiness Review, Safety Reviews, and Independent Technical Analysis."
Add the following after the first sentence of paragraph 4. Content: "The level of detail shall facilitate an Independent Readiness Review(s), Safety Review(s), and Independent Technical Analysis/es. The level of detail of the Component Specification List shall support a Parts Count Method Reliability Analysis."
Blocks 10, 12, 13:
- Draft Electrical and Mechanical Drawings / Schematics and Specifications; Due 30 wd prior to Payload Accommodation Reviews (preliminary)
- Final Electrical and Mechanical Drawings / Schematics and Specifications; Due 30 wd prior to Payload Accommodation Review (critical)
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
018 Reliability and Maintainability Predictions Report Reliability Predictions
DI-SESS-81497B SOW 4.11 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blk 4:
The reliability prediction shall address the probability of completely successful operation of the spacecraft bus for the first year of operations in accordance with the operational and environmental conditions addressed in the Delivery Order Payload Requirements Document (DO PLRD), System Requirements Document (SRD), and Statement of Work (SOW)
Blocks 10, 12 & 13:
- Draft Reliability Predictions; Due 30 wd prior to Payload Accommodation Reviews (preliminary)
- Final Reliability Predictions; Due 30 wd prior to Payload Accommodation Review (critical)
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
STEP 2.0 FA8818-22-D-0003 TBD
019 Design Review Information Package (DRIP) Payload Accommodation Design Review Package
DI-SESS-81757A SOW 6.1 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blocks 10, 12 & 13:
- Draft Payload Accommodation Design Review Package; Due 20 wd prior to Payload Accommodation Reviews (preliminary)
- Final Payload Accommodation Design Review Package; Due 20 wd prior to Payload Accommodation Review (critical)
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
** For SSC/SZK-IK: Letter of transmittal only
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
020 Systems Engineering Management Plan (SEMP) See Block 16
DI-SESS-81785A See Block16 SSC/SZIS
LT
A C
See Block 16
N/A
See Block16
See Block16
SSC/SZIS 1 1 0
SSC/SZK-IK 0 0 0
See Distribution Annex
1 1 0
Blocks 3, 5:
SOW 4.11 – Parts, Materials & Process Control Plan SOW 4.3 – System Engineering Management Plan (SEMP) SOW 4.6 – Configuration Management Plan (CMP) SOW 4.7 – Hardware/System Configuration Identification SOW 4.10 – Contractor’s Software Management/Development Plan (SMP/SDP) SOW 4.7 – Sparing Plan SOW 9.3 – Radio Frequency Authorization (RFA) SOW 4.11 – Product Assurance Plan SOW 7.6 – Thermal Analysis Report SOW 4.11 – Quality Assurance Plan SOW 7.9 – Storage Plan SOW 7.3 – SV Integrated Test Plan
Blocks 10, 12, 13:
- Draft Parts, Materials & Process Control Plan; Due 30 wd prior to SRR
- Final Parts, Materials & Process Control Plan; Due 30 wd prior to SIRR
- Draft SEMP; Due 15 wd prior to SRR
- Final SEMP; Due at SRR
- Draft CMP; Due at SRR
- Final CMP; Due 30 wd after SRR
- Draft Hardware/System Configuration Identification; Due 15 wd prior to SRR
- Final Hardware/System Configuration Identification; Due at SRR
- Draft SMP/SDP; Due 15 wd prior to SRR
- Final SMP/SDP; Due at SRR
- Draft Sparing Plan; Due at SRR
- Final Sparing Plan; Due at Payload Accommodation Review (preliminary)
- RFA; Due at SRR
- Draft Product Assurance Plan; Due at SRR
- Final Product Assurance Plan; Due 45 wd after Gov't approval of Draft
- Draft Thermal Analysis Report; Due at Payload Accommodation Review (preliminary)
- Final Thermal Analysis Report; Due 30 wd after Payload Accommodation Review (critical)
- Draft Quality Assurance Plan; Due at SRR
- Final Quality Assurance Plan; Due 45 wd after Gov't approval of Draft
KENDELL GARDNER, Ctr, USSF STEVEN FUTCH, Capt, USSF
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
- Draft Storage Plan; Due at SRR
- Final Storage Plan; Due at Payload Accommodation Review (preliminary)
- Draft SV Integrated Test Plan; Due at SRR
- Final SV Integrated Test Plan; Due at Payload Accommodation Review (preliminary)
Block 14:
Distribution shall be through secure electronic, on-line access in a Microsoft Office or Adobe Acrobat (pdf) format.
2 1
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MGMT
STEP 2.0 FA8818-22-D-0003 TBD
021 Failure Mode, Effects and Critical Analysis…