This is a Contract Data Requirements List (CDRL) form documenting technical data submission requirements for a Hand Pump Assembly contract (NSN: 4320-01-201-0814) under Contract Line Item 9000, Exhibit A. The contracting officer is Amy Dombrowski and the contract specialist is Haley Bruns, both with the U.S. Army.
The CDRL specifies five data items required from the contractor. Data Item A001 requires submission of a Light Phosphate Coating pre-production procedure (DI-NDTI-80603A) referencing Federal Specification TT-C-490F, Type 1, due within 60 days after contract award (60DAC) with three final copies delivered to the Product Quality Manager and contracting personnel. The procedure must include sample coated panels with three variations: phosphate only, phosphate with primer, and phosphate with primer and top coat, submitted in contractor-acceptable format and requiring contracting officer approval prior to production. Data Item A002 requires a Heavy Phosphate Coating pre-production procedure (DI-NDTI-80603A) referencing MIL-DTL-16232G, paragraph 3.1, similarly due 60DAC with three final copies and identical panel sample requirements, including detailed descriptions of all processes, equipment, controls, testing frequencies, and supplemental finishes. Data Items A003, A004, and A005 require Engineering Change Proposals (ECP), Requests for Variance (RFV), and Notices of Revision (NOR) respectively, submitted as-required using government-compatible software (Microsoft Office or PDF format) in accordance with SAE-EIA-649-1 using DD Forms 1692, 1694, and 1695, electronically submitted to the procuring contracting officer and administrative contracting office. All documents require DD250 certification where applicable, and distribution statement assignments based on the most restrictive classification of affected items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOAST RFOP Hand Pump Assembly REV 18 SEPTEMBER 2026.xlsx | XLSX spreadsheet | |
| BOAST RFOP Hand Pump Assembly REV 27 AUGUST 2026.xlsx | XLSX spreadsheet | |
| BOAST RFOP Hand Pump Assembly REV 05 AUGUST 2026.xlsx | XLSX spreadsheet | |
| BOAST RFOP Hand Pump Assembly REV 29 JULY 2026.xlsx | XLSX spreadsheet | |
| BOAST RFOP Hand Pump Assembly.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and
Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses.
Send completed form to the Government Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 9000
B. EXHIBIT: A
C. CATEGORY:
TDP _X__ TM ____ OTHER ___
D. SYSTEM/ITEM: Hand Pump Assembly, NSN: 4320-01-201-0814
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO.: A001
2. TITLE OF DATA ITEM: LIGHT PHOSPHATE COATING
3. SUBTITLE: PRE-PRODUCTION PROCEDURE
4. AUTHORITY: DI-NDTI-80603A
5. CONTRACT REFERENCE: Section C and Paragraphs 3.2.1 and 3.2.2 of the Federal
Specification TT-C-490F, TYPE 1
6. REQUIRING OFFICE: RDAR-MEE-W(R)
7. DD250 REQ: Not required
8. APP CODE: A
9. DIST. STATEMENT: D
10. FREQUENCY: ONE/R
11. AS OF DATE: Date of Contract Award
12. DATE OF FIRST SUB: 60DAC
13. DATE OF SUBS: N/A
14. DISTRIBUTION:
A. ADDRESSEE: Product Quality Manager, usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil, Amy Dombrowski, Contracting Officer, amy.m.dombrowski.civ@army.mil and Haley Bruns, Contract Specialist, haley.r.bruns.civ@army.mil
B. COPIES: 3
DRAFT:
FINAL: 3
15. TOTAL: 3
16. REMARKS: BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THROUGH THE
CONTRACTING OFFICER IS REQUIRED WIHTIN 60 CALENDAR DAYS AFTER CONTRACT AWARD.
CONTRACTING OFFICER WILL ROUTE INTERNALLY TO THE APPROVING OFFICE (RDAR-MEE-
W(R)). CONTRACTING OFFICER SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO
CONTRACTOR. COATED PANELS PER PARA 3.2.2 of TT-C-490F SHALL INCLUDE THREE WITH
PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE,
PRIMER AND TOP COAT. CONTRACTOR FORMAT ACCEPTABLE.
mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:amy.m.dombrowski.civ@army.mil mailto:haley.r.bruns.civ@army.mil
C. CATEGORY:
TDP _X__ TM ____ OTHER ___
D. SYSTEM/ITEM: Hand Pump Assembly, NSN: 4320-01-201-0814
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO.: A002
2. TITLE OF DATA ITEM: HEAVY PHOSPHATE COATING
3. SUBTITLE: PRE-PRODUCTION PROCEDURE
4. AUTHORITY: DI-NDTI-80603A
5. CONTRACT REFERENCE: Section C and paragraph 3.1 of MIL-DTL-16232G
6. REQUIRING OFFICE: RDAR-MEE-W(R)
7. DD250 REQ: Not Required
8. APP CODE: A
9. DIST. STATEMENT: D
10. FREQUENCY: ONE/R
11. AS OF DATE: Date of Contract award
12. DATE OF FIRST SUB: 60DAC
13. DATE OF SUBS: N/A
14. DISTRIBUTION:
A. ADDRESSEE: Product Quality Manager, usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil, Amy Dombrowski, Contracting Officer, amy.m.dombrowski.civ@army.mil and Haley Bruns, Contract Specialist, haley.r.bruns.civ@army.mil
B. COPIES: 3
DRAFT:
FINAL: 3
15. TOTAL: 3
16. REMARKS:
BLOCK 8 CONT. - PRIOR TO PRODUCTION, APPROVAL THRU THE CONTRACTING OFFICER IS
REQUIRED W/IN 60 DAYS AFTER CONTRACT AWARD. CONTRACTING OFFICER WILL ROUTE
INTERNALLY TO THE APPROVING OFFICE (RDAR-MEE-W(R)). CONTRACTING OFFICER SHALL
PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTOR. COATED PANELS PER PARA
3.2.2 SHALL INCLUDE THREE WITH PHOSPHATE ONLY, THREE WITH PHOSPHATE AND PRIMER,
AND THREE WITH PHOSPHATE, PRIMER AND TOP COAT.
The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.
C. CATEGORY:
TDP _X__ TM ____ OTHER ___
D. SYSTEM/ITEM: Hand Pump Assembly, NSN: 4320-01-201-0814
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO: A003
2. TITLE: ENGINEERING CHANGE PROPOSAL (ECP)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80639E
5. CONTRACT REFERENCE: Section C
6. REQUIRING OFFICE:
mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil mailto:haley.r.bruns.civ@army.mil
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT
OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS
OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE ECP SHALL BE THE
MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED
ITEMS IDENTIFIED IN THE ECP. **SUBMIT ELECTRONICALLY TO THE PROCURING
CONTRACTING OFFICER AT Amy Dombrowski, Contracting Officer, amy.m.dombrowski.civ@army.mil ; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING
OFFICE AT TBD AND ENGINEERING POC AT "mailto:usarmy.pica.devcom-ac.mbx.ecpdocument@army.mil ". DOCUMENTATION SHALL BE IN ACCORDANCE WITH
PARAGRAPH 3.3.1 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1692 (CURRENT
REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
C. CATEGORY:
TDP _X__ TM ____ OTHER ___
D. SYSTEM/ITEM: Hand Pump Assembly, NSN: 4320-01-201-0814
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO: A004
2. TITLE: REQUEST FOR VARIANCE (RFV)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80640E
5. CONTRACT REFERENCE: Section C
6. REQUIRING OFFICE:
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT
OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS
OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE RFV SHALL BE THE
MOST RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED
ITEMS IDENTIFIED IN THE RFV. **SUBMIT ELECTRONICALLY TO THE PROCURING
CONTRACTING OFFICER AT Amy Dombrowski, Contracting Officer, amy.m.dombrowski.civ@army.mil; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING
OFFICE AT TBD AND ENGINEERING POC AT "mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil ". DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.2
OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1694 (CURRENT REVISION)
LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
C. CATEGORY:
TDP _X__ TM ____ OTHER ___
D. SYSTEM/ITEM: Hand Pump Assembly, NSN: 4320-01-201-0814
E. CONTRACT/PR NO.: TBD
F. CONTRACTOR: TBD
1. DATA ITEM NO: A005
2. TITLE: NOTICE OF REVISION (NOR)
3. SUBTITLE: N/A
4. AUTHORITY: DI-SESS-80642E
5. CONTRACT REFERENCE: Section C
6. REQUIRING OFFICE:
7. DD250 REQ: LT
8. APP CODE: N/A
9. DIST. STATEMENT REQ: SEE ITEM 16
10. FREQUENCY: ASREQ
11. AS OF DATE: N/A
12. DATE OF FIRST SUBMISSION: ASREQ
13. DATE OF SUBS. SUBMISSION: ASREQ
14. DISTRIBUTION: SEE ITEM 16
A. ADDRESSEE:
B. COPIES:
DRAFT:
FINAL:
REG REPRO:
15. TOTAL COPIES: SEE ITEM 16
16. REMARKS: DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT
OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)). *UNLESS OTHERWISE SPECIFIED THE
DISTRIBUTION STATEMENT ASSIGNED TO THE NOR SHALL BE THE MOST RESTRICTIVE
DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE NOR. **SUBMIT
ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT Amy Dombrowski, Contracting Officer, amy.m.dombrowski.civ@army.mil; COPY FURNISH TO THE
ADMINISTRATIVE CONTRACTING OFFICE AT TBD AND ENGINEERING POC AT
"mailto:usarmy.pica.devcom-ac.mbx.ecp-document@army.mil". DOCUMENTATION SHALL BE
IN ACCORDANCE WITH PARAGRAPH 3.3.4 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD
FORM 1695 (CURRENT REVISION) LOCATED AT
http://www.dtic.mil/whs/directives/infomgt/forms/ .
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE: