Exhibit A - CDRLs_NIIN 012504207.pdf

PDF 3 MB Posted

Attached to
Repair of PUMP, TURBINE EJECTI(Torpedo Ejection Pump, MK 19)
Solicitation number
N0010425RF019
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) covering multiple data item requirements for a naval torpedo ejection pump repair contract. The CDRL lists various data submissions including inspection and test plans, certification data reports, welding procedures, radiographic shooting sketches, and other technical documentation. Key requirements include:

Certification and documentation must be submitted to Portsmouth Naval Shipyard via Wide Area Work Flow (WAWF), with specific routing instructions for each data item. Submissions include welding procedure details, certification data, and radiographic documentation, with review timelines ranging from 30-90 days after receipt. The contract involves repair of a Torpedo Ejection Pump MK 19 (NSN 4Y 4320 01 250 4207), with a 420-day delivery timeline after contract award. The requirement is classified as a Level 1 requirement with a DX Defense Priorities and Allocations System rating, supporting the TRIDENT Planned Equipment Replacement Program for Ohio Class submarines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .