Exhibit A - CDRLs_NIIN 012504207.pdf

PDF 91 KB Posted

Attached to
Repair of PUMP, TURBINE EJECTI(Torpedo Ejection Pump, MK 19)
Solicitation number
N0010423RF008
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity solicitation. The CDRL outlines nine required data items for the repair of a Torpedo Ejection Pump MK19, including an inspection and test plan, material certifications, welding procedures and qualifications, radiographic documents, and consumable weld material certifications. Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to shipment. The opportunity solicitation is for the evaluation and repair of one government furnished Torpedo Ejection Pump MK19 in accordance with the technical data package, with a 420 day period of performance after award and DX priority rating in support of the TRIDENT Planned Equipment Replacement Program. The solicitation was issued by the Department of the Navy Naval Supply Systems Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP

D. SYSTEM/ITEM

PUMP,TURBINE EJECTI

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

INSPECTION AND TEST PLAN

3. SUBTITLE

INSPECTION SYSTEM PROCEDURES

4. AUTHORITY (Data Acqisition Document No.)

DI-QCIC-81110 (SE)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00092:

Paragraph 10.4 of DI-QCIC-81110 does not apply.

PCO 0 1 0

15. Total 0 1 0

G. PREPARED BY

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

2022-01-13

DD Form 1423-1, JUN 90 Page 1 of 9 Page(s)

S/N 0102-LF-010-5600

Form Approved

D. SYSTEM/ITEM

A002

2. TITLE OF DATA ITEM

CERT DATA FOR SPECIAL EMPHASIS MATL

3. SUBTITLE

CHEMICAL AND MECHANICAL

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-81020 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00149:

Block 12 - Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation shall be submitted via WAWF (Wide Area Work Flow).

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil

No material is to be shipped prior to the receipt of Acceptance.

N39040 0 1 0

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 2 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A003

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

SPECIAL EMPHASIS C OF C

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (CCDD)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00126:

Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.

D00149:

Block 12 - Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation shall be submitted via WAWF (Wide Area Work Flow).

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 3 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A004

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00093:

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

D00149:

Block 12 - Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation shall be submitted via WAWF (Wide Area Work Flow).

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 4 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A005

2. TITLE OF DATA ITEM

WELDING PROCEDURES

3. SUBTITLE

WELD PROCEDURES

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80875A (WP)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00157:

Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval shall be obtained prior to performing any welding.

This review (approval/disapproval) shall be within 90 days from date of receipt.

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 5 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A006

2. TITLE OF DATA ITEM

WLD PDE QUALIFICATION TEST REPORT

3. SUBTITLE

WELD PROC QUALIFICATION DATA

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80876 (WQD)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00157:

Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval shall be obtained prior to performing any welding.

This review (approval/disapproval) shall be within 90 days from date of receipt.

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 6 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A007

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

CONSUMED WELD METAL C of C

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (CWMDD)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00149:

Block 12 - Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation shall be submitted via WAWF (Wide Area Work Flow).

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil

No material is to be shipped prior to the receipt of Acceptance.

D00126:

Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 7 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A008

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

RADIOGRAPHIC SHOOTING SKETCHES

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (RSS)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00093:

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

D00062:

Blocks 12 and 14 - Within 45 Days after Contract Award prior to performing Radiography, Radiographic Shooting Sketches shall be submitted to Portsmouth Naval Shipyard via WAWF (Wide Area Work Flow) for review. If the RSS was previously approved by PNS, the RSS can be submitted with the RT film

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil

The review (approval/disapproval) shall be accomplished within 30 days from date of receipt.

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 8 of 9 Page(s)

Form Approved

D. SYSTEM/ITEM

A009

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

PRODUCTION RADIOGRAPHY

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (RT)

5. CONTRACT REFERENCE

TDP: PARA 3

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION ASREQ

DATE: N/A

Number of Days: 0

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

DATE: N/A

Number of Days: 0

13. DATE OF SUBSEQUENT SUBMISSION

ASREQ

DATE: N/A

Number of Days: 0

Draft Final

Reg Repro

16. REMARKS

D00093:

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

D00063:

Blocks 12 and 14 - Within 135 Days After approval of Radiographic Shooting Sketches, forward one copy for review to:

Commander, Portsmouth Naval Shipyard ATTN: Code 135.3 Portsmouth, NH 03804-5000

A receiving report shall be entered into WAWF and should reference the date of shipment and the shipment tracking number.

Enter in WAWF as follows:

"Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and email notification field: PORT_PTNH_WAWF_Notification@navy.mil

The review (approval/disapproval) shall be accomplished within 30 days from date of receipt.

8322R

H. DATE

2022-01-13

I. APPROVED BY

Ryan Orzell

J. DATE

DD Form 1423-1, JUN 90 Page 9 of 9 Page(s)

File details come from the government source that posted it. Updated .