Exhibit_8_Proposed_Rates_worksheet_Revised.xlsx
XLSX spreadsheet 70 KB Posted
- Solicitation number
- PWDA-260013-SM
- Issued by
- Alachua County, Glencoe CDP, Florida
About this file
This is a proposed rates worksheet for the City of Gainesville, Florida's exclusive residential curbside and municipal solid waste and recycling collection franchise agreement. The solicitation encompasses weekly collection services for approximately 29,350 residential housing units, including single-family curbside solid waste, bulk waste, recycling, white goods, yard trash, and optional food waste composting services. The contract term is 10 years with two optional 5-year renewal periods. Collection services are offered at three frequency levels (3, 4, or 5 days per week) with residential cart options ranging from 20 to 96 gallons and municipal container sizes from 4 to 8 yards. A mandatory pre-proposal meeting was held on October 29, 2025, with questions due by November 5, 2025, and proposals required by December 4, 2025, at 3:00 PM. The projected contract award date is May 21, 2026, with service commencement scheduled for October 1, 2026.
The bid sheet presents five service options differentiated by fuel type: diesel, compressed natural gas (CNG), electric, hybrid, or alternative fuel sources. For the completed sample bid (City A3, 3 days per week service level), rates for residential solid waste pickup and disposal at Leveda Brown Transfer Station range from $7.29 per month for 20-gallon carts to $8.93 per month for 96-gallon carts, with estimated monthly costs of $562,268.80 and annual costs of $6,747,225.60. Recycling services are priced at $4.30 per dwelling unit monthly, and yard waste collection at $6.45 per dwelling unit monthly. Municipal services for city buildings and right-of-way include cart collection rates of $9.12 per month for municipal solid waste and $6.51 for recycling. The contractor is responsible for all cart and container maintenance at no cost, new cart delivery and exchange at no cost, yellow bag collection, disabled backdoor services, and community event services. Disposal costs for residential municipal solid waste, bulk waste, and recycling are paid directly by the City of Gainesville to the Leveda Brown Transfer Station and alternative disposal sites. Additional optional services including grapple truck collection, rear-loaded special pickups, roll-off container hauls, and Big Belly compacting receptacle services are available for negotiated rates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITN_Exclusive_Residential_Curbside_and_Municipal_Solid_Waste_and_Recycling_Agreement.pdf | ||
| Foreign_Countries_of_Concern.pdf | ||
| Exhibit_8_Proposed_Rates_worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet City A3 SAMPLE Proposed Rates for All Services "A3" Sample Form
| Contractor must provide a bid according to the Ivitation to Negotiate instructions. | Disposal and processing of materials as listed in Part 4 - Scope of Work | ||||
| New carts, mechanical containers, and recycling bins will be delivered or exchanged at no cost. | Service | 3 | Days Per Week | ||
| Contractor shall be responsible for all cart & container maintenance at no cost. | Yellow bags are collected at no additional charge. | ||||
| Disabled backdoor services are included at no additional charge. | Community event service included at no additional cost. | ||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | |
| MPGe |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Leveda Brown Transfer Station (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart 1 x week, per month | $ 7.29 | $ 7.29 | $ 7.29 | $ 7.29 | $ 7.29 |
| 35gallon Cart 1 x week, per month | $ 7.64 | $ 7.64 | $ 7.64 | $ 7.64 | $ 7.64 |
| 64 gallon Cart 1 x week, per month | $ 8.00 | $ 8.00 | $ 8.00 | $ 8.00 | $ 8.00 |
| 96 gallon Cart 1 x week, per month | $ 8.93 | $ 8.93 | $ 8.93 | $ 8.93 | $ 8.93 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at New River Landfill (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Alternative Disposal Site (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | |||||
| 18 gallon bin x 2, 1 pickup per week, per dwelling unit per month | $ 4.30 | $ 4.30 | $ 4.30 | $ 4.30 | $ 4.30 |
| Residential Yard Waste | |||||
| Residential Yard Waste, 1 pickup per week, per dwelling unit per month | $ 6.45 | $ 6.45 | $ 6.45 | $ 6.45 | $ 6.45 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | |||||
| 64/96 gallon Cart 1 x week, per month (MSW ROW) | $ 9.12 | $ 9.12 | $ 9.12 | $ 9.12 | $ 9.12 |
| 64/96 gallon Cart 1 x week, per month (Recycling ROW) | $ 6.51 | $ 6.51 | $ 6.51 | $ 6.51 | $ 6.51 |
| 64/96 gallon Cart 1 x week, per month (MSW Buildings) | $ 9.12 | $ 9.12 | $ 9.12 | $ 9.12 | $ 9.12 |
| 4 Yard Container 1 x week, per month | $ 92.66 | $ 92.66 | $ 92.66 | $ 92.66 | $ 92.66 |
| 4 Yard Container 2 x week, per month | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 |
| 4 Yard Container 3 x week, per month | $ 277.99 | $ 267.27 | $ 267.27 | $ 267.27 | $ 267.27 |
| 6 Yard Container 1 x week, per month | $ 138.99 | $ 138.99 | $ 138.99 | $ 138.99 | $ 138.99 |
| 6 Yard Container 2 x week, per month | $ 277.99 | $ 277.99 | $ 277.99 | $ 277.99 | $ 277.99 |
| 6 Yard Container 3 x week, per month | $ 416.98 | $ 416.98 | $ 416.98 | $ 416.98 | $ 416.98 |
| 8 Yard Container 1 x week, per month | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 |
| 8 Yard Container 2 x week, per month | $ 370.65 | $ 370.65 | $ 370.65 | $ 370.65 | $ 370.65 |
| 8 Yard Container 3 x week, per month | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 |
| 8 Yard Container 1 x week, per month (Recycling) | $ 112.93 | $ 112.93 | $ 112.93 | $ 112.93 | $ 112.93 |
| 8 Yard Container 2 x week, per month (Recycling) | $ 225.85 | $ 225.85 | $ 225.85 | $ 225.85 | $ 225.85 |
| 8 Yard Container 3 x week, per month (Recycling) | $ 337.74 | $ 337.74 | $ 337.74 | $ 337.74 | $ 337.74 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container 1 x week, per month | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 | |
| 8 Yard Container 2 x week, per month | $ 370.65 | $ 370.65 | $ 370.65 | $ 370.65 | $ 370.65 | |
| 8 Yard Container 3 x week, per month | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 | |
| Extended price for bid comparison based on current estimated level of service | Approx Units | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Leveda Brown Transfer Station Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart 1 x week, per month | 4,175 | $ 30,435.75 | $ 30,435.75 | $ 30,435.75 | $ 30,435.75 | $ 30,435.75 |
| 32gallon Cart 1 x week, per month | 8,325 | $ 63,603.00 | $ 63,603.00 | $ 63,603.00 | $ 63,603.00 | $ 63,603.00 |
| 64 gallon Cart 1 x week, per month | 12,200 | $ 97,600.00 | $ 97,600.00 | $ 97,600.00 | $ 97,600.00 | $ 97,600.00 |
| 96 gallon Cart 1 x week, per month | 4,650 | $ 41,524.50 | $ 41,524.50 | $ 41,524.50 | $ 41,524.50 | $ 41,524.50 |
| Sub Total | 29,350 | $ 233,163.25 | $ 233,163.25 | $ 233,163.25 | $ 233,163.25 | $ 233,163.25 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at New River Landfill Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Alternative Disposal Site Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | ||||||
| 18 gallon bin x 2, 1 pickup per week, per month | 29,350 | $ 4.30 | $ 4.30 | $ 4.30 | $ 4.30 | $ 4.30 |
| Sub Total | 29,350 | $ 126,205.00 | $ 126,205.00 | $ 126,205.00 | $ 126,205.00 | $ 126,205.00 |
| Residential Yard Waste | ||||||
| Residential Yard Waste, 1 pickup per week, per month | 29,350 | $ 6.45 | $ 6.45 | $ 6.45 | $ 6.45 | $ 6.45 |
| Sub Total | 29,350 | $ 189,307.50 | $ 189,307.50 | $ 189,307.50 | $ 189,307.50 | $ 189,307.50 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | ||||||
| 64/96 gallon Cart 1 x week, per month (MSW ROW) | 107 | $ 975.84 | $ 975.84 | $ 975.84 | $ 975.84 | $ 975.84 |
| 64/96 gallon Cart 1 x week, per month (Recycling ROW) | 45 | $ 292.95 | $ 292.95 | $ 292.95 | $ 292.95 | $ 292.95 |
| 64/96 gallon Cart 1 x week, per month (MSW Buildings) | 52 | $ 474.24 | $ 474.24 | $ 474.24 | $ 474.24 | $ 474.24 |
| 4 Yard Container 1 x week, per month (MSW) | 8 | $ 741.30 | $ 741.30 | $ 741.30 | $ 741.30 | $ 741.30 |
| 4 Yard Container 2 x week, per month (MSW) | 3 | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 | $ 555.97 |
| 4 Yard Container 3 x week, per month (MSW) | 1 | $ 277.99 | $ 267.27 | $ 267.27 | $ 267.27 | $ 267.27 |
| 6 Yard Container 1 x week, per month (MSW) | 5 | $ 694.96 | $ 694.96 | $ 694.96 | $ 694.96 | $ 694.96 |
| 6 Yard Container 2 x week, per month (MSW) | 1 | $ 277.99 | $ 277.99 | $ 277.99 | $ 277.99 | $ 277.99 |
| 6 Yard Container 3 x week, per month (MSW) | 1 | $ 416.98 | $ 416.98 | $ 416.98 | $ 416.98 | $ 416.98 |
| 8 Yard Container 1 x week, per month (MSW) | 11 | $ 2,038.56 | $ 2,038.56 | $ 2,038.56 | $ 2,038.56 | $ 2,038.56 |
| 8 Yard Container 2 x week, per month (MSW) | 2 | $ 741.30 | $ 741.30 | $ 741.30 | $ 741.30 | $ 741.30 |
| 8 Yard Container 3 x week, per month (MSW) | 2 | $ 1,111.94 | $ 1,111.94 | $ 1,111.94 | $ 1,111.94 | $ 1,111.94 |
| 8 Yard Container 1 x week, per month (Recycling) | 3 | $ 338.78 | $ 338.78 | $ 338.78 | $ 338.78 | $ 338.78 |
| 8 Yard Container 2 x week, per month (Recycling) | 4 | $ 903.41 | $ 903.41 | $ 903.41 | $ 903.41 | $ 903.41 |
| 8 Yard Container 3 x week, per month (Recyling) | 3 | $ 1,013.22 | $ 1,013.22 | $ 1,013.22 | $ 1,013.22 | $ 1,013.22 |
| Sub Total | 248 | $ 8,600.02 | $ 8,589.30 | $ 8,589.30 | $ 8,589.30 | $ 8,589.30 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container 1 x week, per month | 1 | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 | $ 185.32 |
| 8 Yard Container 2 x week, per month | 7 | $ 2,594.54 | $ 2,594.54 | $ 2,594.54 | $ 2,594.54 | $ 2,594.54 |
| 8 Yard Container 3 x week, per month | 4 | $ 2,223.89 | $ 2,223.89 | $ 2,223.89 | $ 2,223.89 | $ 2,223.89 |
| Sub Total | 12 | $ 5,003.75 | $ 5,003.75 | $ 5,003.75 | $ 5,003.75 | $ 5,003.75 |
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 | |
| Monthly Total @ Leveda Brown | $ 562,279.52 | $ 562,268.80 | $ 562,268.80 | $ 562,268.80 | $ 562,268.80 |
| Monthly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ Alternate Location | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ 6,747,354.19 | $ 6,747,225.60 | $ 6,747,225.60 | $ 6,747,225.60 | $ 6,747,225.60 |
| Yearly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Services as needed for Municipal and Residential locations. Rates are subject to negotiations | |
| Grapple Truck CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Rear-loaded CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Municipal City Right-of-Way and Buildings MSW & Recycling Specials | |
| 2, 4, 6, 8 Yard Container, Special Pickup Collection per Cubic Yard | $ - 0 |
| Roll-Off Container, On-Call Haul | $ - 0 |
| Municipal Big Belly Compacting Trash and Recycling Receptacle On-Call Pickup per receptacle | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 1 Pickup per week, per Compacted Cubic Yard | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 2 Pickups per week, per Compacted Cubic Yard | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 3 Pickups per week, per Compacted Cubic Yard | $ - 0 |
| Litter Containers and Carts up to 96 gallons Special Pickup Collection per Service | $ - 0 |
| Material | Current Disposal or Processing Site | Paid By |
| Residential MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Residential Bulk | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| White Goods* | Contractor responsible for freon removal and proper recycling/disposal | Contractor |
| Yard Waste | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal C&D | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal Metal Recycling | CMC Recycling 1508 NW 55th Place, Gainesville, Florida 32653 and/or, Trademark Metals 817 NE Waldo Road, Gainesville, Florida 32641 | City of Gainesville |
| Municipal MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | Contractor |
| Municipal Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32610 | Contractor |
&A &P of &N
Bid Sheet City A3 Proposed Rates for All Services "A3"
| Contractor must provide a bid according to the Ivitation to Negotiate instructions. | Disposal and processing of materials as listed in Part 4 - Scope of Work | ||||
| New carts, mechanical containers, and recycling bins will be delivered or exchanged at no cost. | Service | 3 | Days Per Week | ||
| Contractor shall be responsible for all cart & container maintenance at no cost. | Yellow bags are collected at no additional charge. | ||||
| Disabled backdoor services are included at no additional charge. | Community event service included at no additional cost. | ||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | |
| MPGe |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Leveda Brown Transfer Station (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at New River Landfill (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Alternative Disposal Site (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | |||||
| 18 gallon bin x 2, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | |||||
| Residential Yard Waste, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | |||||
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart 1 pickup per week, per unit per month (Recycling ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW Buildings) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Extended price for bid comparison based on current estimated level of service | Approx Units | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Leveda Brown Transfer Station Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at New River Landfill Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Alternative Disposal Site Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | ||||||
| 18 gallon bin x 2, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | ||||||
| Residential Yard Waste, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | ||||||
| 64/96 gallon Cart 1 x week, per month (MSW ROW) | 107 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart 1 x week, per month (Recycling ROW) | 45 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart 1 x week, per month (MSW Buildings) | 52 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container 1 x week, per month (MSW) | 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container 2 x week, per month (MSW) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container 3 x week, per month (MSW) | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container 1 x week, per month (MSW) | 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container 2 x week, per month (MSW) | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container 3 x week, per month (MSW) | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 1 x week, per month (MSW) | 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 2 x week, per month (MSW) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 3 x week, per month (MSW) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 1 x week, per month (Recycling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 2 x week, per month (Recycling) | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container 3 x week, per month (Recyling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 248 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 | |
| Monthly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ Alternate Location | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Services as needed. Rates are subject to negotiatians | |
| Grapple Truck CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Rear-loaded CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Municipal City Buildings MSW & Recycling Specials | |
| 2, 4, 6, 8 Yard Container, Special Pickup Collection per Cubic Yard | $ - 0 |
| Roll-Off Container, On-Call Haul | $ - 0 |
| Municipal Big Belly Compacting Trash and Recycling Receptacle On-Call Pickup per receptacle | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 1 Pickup per week, per Compacted Cubic Yard | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 2 Pickups per week, per Compacted Cubic Yard | $ - 0 |
| 2, 4, 6, 8 Cubic Yard Container, 3 Pickups per week, per Compacted Cubic Yard | $ - 0 |
| Litter Containers and Carts up to 96 gallons Special Pickup Collection per Service | $ - 0 |
| Material | Current Disposal or Processing Site | Paid By |
| Residential MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Residential Bulk | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| White Goods* | Contractor responsible for freon removal and proper recycling/disposal | Contractor |
| Yard Waste | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal C&D | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal Metal Recycling | CMC Recycling 1508 NW 55th Place, Gainesville, Florida 32653 and/or, Trademark Metals 817 NE Waldo Road, Gainesville, Florida 32641 | City of Gainesville |
| Municipal MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | Contractor |
| Municipal Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32610 | Contractor |
&A &P of &N
Bid Sheet City A4 Proposed Rates for All Services "A4"
| Contractor must provide a bid according to the Ivitation to Negotiate instructions. | Disposal and processing of materials as listed in Part 4 - Scope of Work | ||||
| New carts, mechanical containers, and recycling bins will be delivered or exchanged at no cost. | Service | 4 | Days Per Week | ||
| Contractor shall be responsible for all cart & container maintenance at no cost. | Yellow bags are collected at no additional charge. | ||||
| Disabled backdoor services are included at no additional charge. | Community event service included at no additional cost. | ||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | |
| MPGe |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Leveda Brown Transfer Station (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at New River Landfill (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Alternative Disposal Site (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | |||||
| 18 gallon bin x 2, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | |||||
| Residential Yard Waste, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | |||||
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per unit per month (Recycling ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW Buildings) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Extended price for bid comparison based on current estimated level of service | Approx Units | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Leveda Brown Transfer Station Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at New River Landfill Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Alternative Disposal Site Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | ||||||
| 18 gallon bin x 2, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | ||||||
| Residential Yard Waste, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | ||||||
| 64/96 gallon Cart, 1 pickup per week, per month (MSW ROW) | 107 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per month (Recycling ROW) | 45 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per month (MSW Buildings) | 52 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 1 pickup per week, per month | 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 2 pickups per week, per month | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 3 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 1 pickup per week, per month | 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 2 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 3 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per month | 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per month (Recycling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month (Recycling) | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month (Recycling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 248 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 | |
| Monthly Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ Alternate Location | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Services as needed. Rates are subject to negotiations | |||||
| Grapple Truck CITY Special Pickup Collection per Cubic Yard | $ - 0 | ||||
| Rear-loaded CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Municipal City Buildings MSW & Recycling Specials | ||
| 2, 4, 6, 8 Yard Container, Special Pickup Collection per Cubic Yard | $ - 0 | |
| Roll-Off Container, On-Call Haul | $ - 0 | |
| Municipal Big Belly Compacting Trash and Recycling Receptacle On-Call Pickup per receptacle | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 1 Pickup per week, per Compacted Cubic Yard | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 2 Pickups per week, per Compacted Cubic Yard | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 3 Pickups per week, per Compacted Cubic Yard | $ - 0 | |
| Litter Containers and Carts up to 96 gallons Special Pickup Collection per Service | $ - 0 | |
| Material | Current Disposal or Processing Site | Paid By |
| Residential MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Residential Bulk | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| White Goods* | Contractor responsible for freon removal and proper recycling/disposal | Contractor |
| Yard Waste | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal C&D | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal Metal Recycling | CMC Recycling 1508 NW 55th Place, Gainesville, Florida 32653 and/or, Trademark Metals 817 NE Waldo Road, Gainesville, Florida 32641 | City of Gainesville |
| Municipal MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | Contractor |
| Municipal Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32610 | Contractor |
Bid Sheet City A5 Proposed Rates for All Services "A5"
| Contractor must provide a bid according to the Ivitation to Negotiate instructions. | Disposal and processing of materials as listed in Part 4 - Scope of Work | ||||
| New carts, mechanical containers, and recycling bins will be delivered or exchanged at no cost. | Service | 5 | Days Per Week | ||
| Contractor shall be responsible for all cart & container maintenance at no cost. | Yellow bags are collected at no additional charge. | ||||
| Disabled backdoor services are included at no additional charge. | Community event service included at no additional cost. | ||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | |
| MPGe |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Leveda Brown Transfer Station (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at New River Landfill (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pickup and Disposal at Alternative Disposal Site (See White Goods Below for Recycling/Disposal Information) | |||||
| 20 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | |||||
| 18 gallon bin x 2, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | |||||
| Residential Yard Waste, 1 pickup per week, per dwelling unit per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | |||||
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per unit per month (Recycling ROW) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per unit per month (MSW Buildings) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per cubic yard per month (Recycling) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 2 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8 Yard Container, 3 pickups per week, per cubic yard per month | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Extended price for bid comparison based on current estimated level of service | Approx Units | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Leveda Brown Transfer Station Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at New River Landfill Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Solid Waste / Bulk Waste / White Goods* Pick up and Disposal at Alternative Disposal Site Totals (See White Goods Below for Disposal/Recycling Information) | ||||||
| 20 gallon Cart, 1 pickup per week, per month | 4,175 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 35 gallon Cart, 1 pickup per week, per month | 8,325 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64 gallon Cart, 1 pickup per week, per month | 12,200 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 96 gallon Cart, 1 pickup per week, per month | 4,650 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Disposal Cost Per Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Source Separated Dual Stream Recycling | ||||||
| 18 gallon bin x 2, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Residential Yard Waste | ||||||
| Residential Yard Waste, 1 pickup per week, per month | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 29,350 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Municipal City Buildings and Right-of-Way MSW & Recycling | ||||||
| 64/96 gallon Cart, 1 pickup per week, per month (MSW ROW) | 107 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per month (Recycling ROW) | 45 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 64/96 gallon Cart, 1 pickup per week, per month (MSW Buildings) | 52 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 1 pickup per week, per month | 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 2 pickups per week, per month | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 Yard Container, 3 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 1 pickup per week, per month | 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 2 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 Yard Container, 3 pickups per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per month | 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 1 pickup per week, per month (Recycling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month (Recycling) | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month (Recycling) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 248 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Containerized Residential MSW, Bulk & Recycling | ||||||
| 8 Yard Container, 1 pickup per week, per month | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 2 pickups per week, per month | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 Yard Container, 3 pickups per week, per month | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub Total | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost | Estimated Monthly Cost |
| OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 | |
| Monthly Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Total @ Alternate Location | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ New River | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yearly Total @ Leveda Brown | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Services as needed. Rates are subject to negotiations | |||||
| Grapple Truck CITY Special Pickup Collection per Cubic Yard | $ - 0 | ||||
| Rear-loaded CITY Special Pickup Collection per Cubic Yard | $ - 0 |
| Municipal City Buildings MSW & Recycling Specials | ||
| 2, 4, 6, 8 Yard Container, Special Pickup Collection per Cubic Yard | $ - 0 | |
| Roll-Off Container, On-Call Haul | $ - 0 | |
| Municipal Big Belly Compacting Trash and Recycling Receptacle On-Call Pickup per receptacle | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 1 Pickup per week, per Compacted Cubic Yard | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 2 Pickups per week, per Compacted Cubic Yard | $ - 0 | |
| 2, 4, 6, 8 Cubic Yard Container, 3 Pickups per week, per Compacted Cubic Yard | $ - 0 | |
| Litter Containers and Carts up to 96 gallons Special Pickup Collection per Service | $ - 0 | |
| Material | Current Disposal or Processing Site | Paid By |
| Residential MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Residential Bulk | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | City of Gainesville |
| White Goods* | Contractor responsible for freon removal and proper recycling/disposal | Contractor |
| Yard Waste | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal C&D | Watson’s County Line Landfill, at 20103 SW Archer Road, Archer, Florida 32618 | City of Gainesville |
| Municipal Metal Recycling | CMC Recycling 1508 NW 55th Place, Gainesville, Florida 32653 and/or, Trademark Metals 817 NE Waldo Road, Gainesville, Florida 32641 | City of Gainesville |
| Municipal MSW | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32609 | Contractor |
| Municipal Recycling | The Leveda Brown Transfer Station, at 5115 NE 63rd Ave, Gainesville, FL 32610 | Contractor |
&A &P of &N
Bid Sheet City Option Compost
| Proposed Rates for Food Waste / Composting Services | |
| Contractor Bid is Optional | Disposal and processing of materials as listed in Part 4 - Scope of Work |
| New carts or containers will be delivered at no cost. | Service level to be aligned with selected option 3, 4, or 5 days per week |
| Contractor shall be responsible for all cart & container maintenance. | |
| Disabled backdoor is included at no additional charge. |
| Municipal Composting / food waste collection and processing | |||||
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Monthly Cost Per Unit based on volume of contracted homes | ||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | |
| MPGe |
| Cart Size Proposed in Gallons | Up to | |||||
| 0 | 700 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 2,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 5,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 10,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 30,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Bid Total for Comparison actual amounts will fluctuate based on the actual level of service performed by the contractor calculated times the contracted rates | Monthly Cost of total homes based on volume of homes | |||||
| Services | OPTION 1 | OPTION 2 | OPTION 3 | OPTION 4 | OPTION 5 | |
| DIESEL | CNG | ELECTRIC | HYBRID | OTHER | ||
| Cart Size Proposed | Up to | |||||
| 0 | 700 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 2,500 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 5,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 10,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0 | 30,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Material | Disposal or Processing Site / Provide Details of facility capabilities and end market | Paid By |
| Compost | Contractor |
&A &P of &N
File details come from the government source that posted it. Updated .