This is a Statement of Work (Exhibit 4) prepared by the Oregon Department of Transportation for an LED lighting upgrade project at the La Grande Truck Shop. The project involves replacing approximately 560 lighting fixtures throughout the interior and exterior of the building located at 3016 Island Ave, La Grande, OR 97850. The existing lighting is original to the building's 1993 construction and has reached the end of its service life due to widespread fixture failures and changes to energy codes phasing out fluorescent lamps. Work shall be accomplished on weekdays between 7 a.m. and 5 p.m., excluding weekends and state holidays, with substantial completion required by February 1, 2027, and final completion by February 15, 2027. Contractors must conduct a site visit to examine existing conditions prior to bidding and request any clarifications in writing before installation. The ODOT Project Manager is Shelby Stout, and contractors must contact her at least ten business days prior to starting work to schedule the project.

The contractor is responsible for all material procurement, fixture removal and disposal, installation, testing, and configuration of equipment in accordance with manufacturer's instructions and local permit requirements. Substitution requests for specific equipment makes and models must be submitted during the bid process and require prior written approval from the ODOT Construction Project Manager. The contractor must provide weekly Certified Payroll Reports as BOLI prevailing wage rates apply to this project. All work must comply with Oregon OSHA rules and regulations, and the contractor is responsible for obtaining and posting all required permits. Prior to final completion, the contractor must provide as-built drawings marked in red, digital copies of operations and maintenance information, equipment details including manufacturer and serial numbers, proof of payment to all subcontractors and suppliers, and certification that all project obligations have been satisfied. The contractor shall provide a one-year installation warranty on all workmanship and pass through manufacturer warranties for all equipment, along with full instruction to ODOT personnel on operation, adjustment, and maintenance of all installed systems.

View the file

Other files

File Type Posted
00017582 ESB_RFCQ_279C~1.docx DOCX document
00017582 ESBSampleContract279C.docx DOCX document
Exhibit 5 Building Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 4 – SPECIFICATIONS

PROJECT OVERVIEW

July 7, 2026 Oregon Department of Transportation

La Grande Truck Shop LED Lighting Upgrade Project Location:

3016 Island Ave La Grande, OR 97850

ODOT Contact:

The ODOT Project Manager for this project is Shelby Stout.

· E-mail: shelby.stout@odot.oregon.gov

· Cell: (541) 952-1165

· Address: 3012 Island Ave, Building D La Grande, OR 97850

The ODOT Project Manager may designate an additional ODOT contact person or engineer to support with inspections or questions in the field.

Project Background The majority of the Truck Repair Shop’s lighting is original to its 1993 construction. While individual fixtures have been replaced over the years on an as-needed basis as failures occurred, the lighting has largely reached the end of its service life. The building is now experiencing widespread fixture failures and changes to energy codes combined with the phase-out of fluorescent lamps make a comprehensive lighting replacement project the most practical and cost-effective solution.

Project Description:

The project will replace approximately 560 lighting fixtures throughout the interior and exterior of the building with LED upgrades per consultant recommendation. Material list is basis of design, substitutions will be considered.

Detailed Project Specifications:

1. Material list:

2. Outline of work:

· Remove and dispose of existing fixtures being replaced with new fixtures.

· Install, test, and configure all listed and complementary equipment as needed in accordance with manufacturer’s written instructions.

· Verify onsite and coordinate with Construction Project Manager the exact location where the supplied equipment shall be installed.

· Comply with trade permit requirements per Local Jurisdictions.

General Construction Notes:

· The contractor shall make a site visit and examine existing conditions prior to providing a bid. Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents.

· Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.

· All work shown is to be by the contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the contractor unless specifically noted as existing or provided by ODOT.

· Drawings are schematic in nature, major components and equipment are shown on the drawings. The contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.

· Plans and specifications call out specific makes and models of equipment in some locations. Substitution requests shall be made during the bid process. ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Construction Project Manager.

· All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.

· Clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

Scheduling of Contract:

· Substantial completion of the Work shall be no later than 2/1/27. Final completion shall be no later than 2/15/27.

· After award of contract, the Contractor shall contact the ODOT Project Manager to schedule the Work at least ten (10) business days prior to the start of any work/demolition.

· The Work shall be accomplished on weekdays between the hours of 7 a.m. and 5 p.m. Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Managers.

· Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the ODOT Project Manager prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.

· The Contractor shall submit to the ODOT Project Managers a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.

· The Contractor shall coordinate the efforts of all Suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.

Clean-Up/Conditions of Site:

· The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.

· The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

· The Contractor shall protect materials subject to damage by temperature or other weather conditions.

· The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.

· The Contractor shall notify the ODOT Project Manager at least two (2) days in advance of any major deliveries.

· Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.

· ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.

· It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.

· The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.

BOLI:

· BOLI Prevailing Wage Rates apply to this project. Provide weekly Certified Payroll Reports for General Contractor and all subcontractors as a prerequisite for progress payment approval.

Close Out:

· All special inspections must be complete prior to Substantial Completion.

· Inspection of the work by the ODOT Project Manager for establishment of Substantial Completion shall be made within five (5) business days after receipt of the Contractor’s email request. At this time, the ODOT Project Manager and the Contractor shall develop a punch list document for any incomplete or deficient work.

· Prior to Final Completion, the Contractor shall complete all items on the punch list.

· The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction

· The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the ODOT Project Manager.

· Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.

· Prior to Final Completion, provide ODOT Project Manager with information for all equipment provided by the project, including but not limited to: Manufacturer, model, serial number, consumables, installation date, purchase date.

· Prior to Final Completion, and as prerequisite for final payment, provide ODOT Project Manager with signed certification that all subcontractors and suppliers have been paid in full and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

· Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.

· Inspection of the work by the ODOT Project Manager for establishment of Final Completion shall be made within five (5) business days after receipt of the Contractor’s email request.

Warranty:

· Contractor shall provide a 1-year Installation warranty on all workmanship.

· Contractor shall provide all warranties for equipment applicable to this Contract Revision: 5/7/24