Exhibit_3.pdf
PDF 3 MB Posted
- Solicitation number
- 2023-RFP-062-PR
- Issued by
- Dane County, Wisconsin
About this file
This document is a detailed map of the Landfill Gas Extraction System for the Truax Landfill, prepared by TRC Solutions for Dane County, Wisconsin. The figure (Figure 2) provides a comprehensive aerial view of the landfill site, showcasing the intricate network of landfill gas (LFG) monitoring and extraction infrastructure. The map includes various components such as active and inactive LFG probes, extraction wells, trench riser valves, condensate management facilities, header valves, and the limits of waste. The site is located near Packers Avenue, Anderson Street, and includes adjacent facilities like the Bridges Golf Course Maintenance Facility and a Blower Building & Flare.
The map identifies multiple grid points (GP) and trench (TR) locations, indicating a systematic approach to landfill gas monitoring and management. The legend provides detailed information about the different infrastructure elements, with notes highlighting that the map projection uses NAD83 HARN coordinate system, and aerial photography was supplied by the Dane County Land Information Office in 2010. The document includes a revision dated July 22, 2013, suggesting ongoing updates and maintenance of the landfill gas extraction system. The precise mapping and detailed infrastructure layout demonstrate a comprehensive approach to environmental management and gas extraction at the Truax Landfill site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
BLOWER
BUILDING
& FLARE
TRUAX LANDFILL
BRIDGES GOLF COURSE
MAINTENANCE FACILITY
Anderson Street
Packers Avenue
Packers Avenue Packers Avenue
Grim Street
Packers Avenue Packers Avenue
Pankratz Street International Lane
Pankratz Street International Lane
TR-4
GP-5
GP-4
GP-19W
GP-18
GP-15GP-17
GP-16
GP-2SGP-2D
GP-10
GP-11
GP-3D
GP-3S
GP-20
(WEST)
GP-20
(EAST)
GP-21
(WEST)
GP-21
(EAST)
GP-19E
(SOUTH)
GP-19E
(NORTH)
GP-12
GP-13
TR-1
TR-2
TR-3
TR-5
TR-6
TR-8
TR-12
TR-11
TR-9
TR-13
TR-10
CD3R
GP-1D
GP-30
GP-1SR
CD1
M3 M4
M5
CD2
M2 M1
CD3
CD2R
N3
N2
N1
W1 W2
W3 W4
W14
W5W6
W15
W7W8W9W10W11W12W13
S1
S2
S3
S4
W16
N5
N4
497750 498000 498250 498500 498750 499000 499250 499500 499750 500000 500250 500500
00340-16-02A.m xdAS NOTED
708 Heartland Trail, Suite 3000 Madison, WI 53717 Phone: 608.826.3600 Fax: 608.826.3941 www.trcsolutions.com
DRAWN BY:
CHECKED BY:
APPROVED BY:
DATE:
SCALE:
DATE PRINTED:
PROJ. NO.
FILE NO.
SHEET TITLE:
PROJECT:
0 100 200
FEET
NOTES
1. M AP PROJECTION AND GRID COORDINATES ARE NAD83 HARN, DANE
COU NTY COORDINATE SYSTEM , U S SU RVEY FEET.
2. AERIAL PHOTOGRAPHY SU PPLIED BY DANE COU NTY LAND
INFORM ATION OFFICE, 2010.
3. LANDFILL FEATU RES AND ROAD LOCATIONS ARE APPROXIM ATE.
4. “LFG” = LANDFILL GAS.
5. ALL LEGEND ITEM S SHOWN ARE AT APPROXIM ATE LOCATIONS;
FIELD VERIFICATION IS RECOM M ENDED.
LEGEND
INACTIVE LFG PROBE
ACTIVE LFG PROBE
LFG EXTRACTION WELL
TRENCH RISER VALVE
CONDENSATE KNOCKOU T
CONDENSATE M ANAGEM ENT M ANHOLE
HEADER VALVE
ACTIVE LFG HEADER SYSTEM
FORM ER LFG HEADER SYSTEM , ABANDONED IN PLACE;
CONNECTIONS M AINTAINED FOR CONDENSATE M ANAGEM ENT
LIM ITS OF WASTE
EXISTING BU ILDING FOOTPRINT
LFGCS COM PONENT M ISSINGTR-4
NO. DATE REVISION BY CHK'D APV'D
1. 7/22/2013 EDITS JP CM CM
PAPEZ J 185752-000
LANDFILL GAS EXTRACTION SYSTEM
TRUAX LANDFILL
FIGURE 2
FREE D
M ADSEN C
APRIL 2016
E:\
RM
T_D
AT
A\0 0\1 6\0 0-1 6-0 2A .mx d
Sa ved By : R Su em nic ht o n 2 8 A pr 2 , 13 :39 :44
EXHIBIT 3
File details come from the government source that posted it. Updated .