Exhibit 2 - Specifications and Drawings.pdf
PDF 8 MB Posted
- Solicitation number
- 2140678
- Issued by
- New York County, Nissequogue Village, New York
About this file
Summary of Exhibit 2: Specifications and Drawings
This document is the technical specifications and drawings exhibit issued by the City University of New York (CUNY) Office of Facilities Planning, Construction & Management for the Hunter College West Building Lower Roofs Replacement project. The specifications are organized into 26 divisions covering contracting requirements, general requirements, and technical work scopes including concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, plumbing, and electrical and lighting systems. The project encompasses roof replacement work and gymnasium floor re-installation at Hunter College's West Building. The document was issued on July 30, 2026, and establishes comprehensive contract terms, conditions, and performance standards applicable to the construction work.
The specifications include detailed general conditions addressing contractor representations, site conditions verification, project scheduling using critical path method (CPM) scheduling, worker identification and site access control requirements, coordination with separate contracts and other contractors, materials and labor obligations, subcontracting procedures, change order protocols, payment procedures, time of completion standards, claims and dispute resolution, termination and suspension provisions, inspection requirements, and protection of persons and property. Notably, the document requires contractors to submit New York State Vendor Responsibility Questionnaires for subcontractors with subcontract values of two million dollars or greater and establishes strict compliance with hazardous materials laws, safety requirements, and quality control standards. The contract incorporates prevailing wage requirements, nondiscrimination provisions, minority and women-owned business enterprise (MWBE) participation goals, and service-disabled veteran-owned business (SDVOB) participation goals as specified in the associated procurement opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2:
Specifications and Drawings
Issued: 7/30/2026
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 0 – CONTRACTING REQUIREMENTS
SECTION 00 71 00 General Conditions for Construction CUNY
DIVISION 1 - GENERAL REQUIREMENTS (except insurance & bonds)
SECTION 01 10 00 Project Summary
SECTION 01 25 00 Substitution Procedures
SECTION 01 25 01 Substitution Form
SECTION 01 26 00 Contract Modifications
SECTION 01 29 00 Payment Procedures
SECTION 01 29 01 Payment Forms
SECTION 01 31 00 Project Management and Coordination
SECTION 01 31 01 RFI Form
SECTION 01 32 00 Construction Progress and Documentation
SECTION 01 32 33 Photographic Documentation
SECTION 01 33 00 Submittal Procedures
SECTION 01 33 01 Submittal Attachment Form
SECTION 01 40 00 Quality Requirements
SECTION 01 43 39 Mockups
SECTION 01 50 00 Temporary Facilities and Controls
SECTION 01 53 50 Safety Program and Site Protection
SECTION 01 56 00 Temporary Barriers and Enclosures
SECTION 01 58 13 Temporary Project Identification Signs
SECTION 01 60 00 Product Requirements
SECTION 01 73 00 Execution
SECTION 01 74 19 Construction Waste Management & Disposal
SECTION 01 77 00 Closeout Procedures
SECTION 01 78 23 Operation and Maintenance Data
SECTION 01 78 39 Project Record Documents
SECTION 01 79 00 Demonstration and Training
DIVISION 2 - EXISTING CONDITIONS
SECTION 02 08 10 Asbestos Abatement
SECTION 02 41 13 Selective Site Demolition
DIVISION 3 - CONCRETE
SECTION 03 01 30 Maintenance of Cast-In-Place Concrete
SECTION 03 01 50.61 Resurfacing of Cast Decks
DIVISION 4 - MASONRY
SECTION 04 01 20.51 Maintenance of Masonry Units
DIVISION 5 - METALS
SECTION 05 41 00 Cold-Formed Metal Framing
SECTION 05 52 00 Steel Roof Guard Rails
DIVISION 6 - WOOD, PLASTICS and COMPOSITES
SECTION 06 10 63 Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
SECTION 07 14 16.10 Liquid Cold-Applied Roofing / Waterproofing
SECTION 07 27 11 Non Permeable Self Adhering Membrane
SECTION 07 41 13 Standing Seam Sheet Metal Wall Cladding
SECTION 07 62 00 Flashings, Sheet Metal and Expansion Joint Cover
SECTION 07 90 00 Joint Sealers
Hunter College West Building
Lower Roofs Replacement
TOC - 2
Issued: 7/30/2026
DIVISION 8 - OPENINGS
SECTION 08 13 13.13 Exterior Aluminum Door and Frame
SECTION 08 71 00 Door Hardware
SECTION 08 73 00 Thresholds, Weatherstripping & Seals
SECTION 08 90 00 Louvers
DIVISION 9 - FINISHES
SECTION 09 01 90 Maintenance of Painting and Coatings
SECTION 09 51 00 Acoustical Ceilings
SECTION 09 64 60 Resilient Wood Flooring System
SECTION 09 91 00 Interior Painting
SECTION 09 96 53 Elastomeric Coating
SECTION 09 96 53.1 Special Testing
DIVISION 10 - BIRD CONTROL
SECTION 10 29 00 Bird Control
DIVISION 12 – FURNISHINGS
SECTION 12 66 12 - Volleyball Equipment
SECTION 12 66 13 - Telescoping Bleacher Re-installation
DIVISION 22 - PLUMBING
SECTION 22 40 10 General Provisions for Plumbing Work
SECTION 22 41 50 Drainage
DIVISION 26 - ELECTRICAL & LIGHTING
SECTION 26 00 00 General Provisions for Electrical Work
SECTION 26 05 19 Wire and Cable (600 Volts)
SECTION 26 05 26 Grounding and Bonding
SECTION 26 05 33 Raceways and Installation Components
SECTION 26 05 34 Through-Penetration Fire Stopping for Electrical Systems
SECTION 26 05 53 Electrical Identifications
SECTION 26 09 10 Power, Control, and Alarm Wiring System
SECTION 26 27 26 Wiring Devices and Installation Components
SECTION 26 51 00 Lighting Fixtures
END OF TABLE OF CONTENTS
7/30/2026
GENERAL CONDTIONS 007100 - 1
SECTION 00 71 17
GENERAL CONDITIONS FOR CONSTRUCTION
CUNY Office of Facilities Planning, Construction Documents – Hunter College West
Contents
ARTICLE 1 -- DEFINITIONS
Section 1.01 - Definitions
ARTICLE 2 -- CONTRACT DOCUMENTS
Section 2.01 - Captions Section 2.02 – Electronic Data Transfer Section 2.03 - Owner Section 2.04 - Notice and Service Thereof Section 2.05 - Nomenclature Section 2.06 - Invalid Provisions Section 2.07 – Interpretation of Contract Documents Section 2.08 - Copies of Contract Documents
ARTICLE 3 -- SITE CONDITIONS
Section 3.01 - Subsurface or Site Conditions Found Different Section 3.02 - Verifying Dimensions and Conditions Section 3.03 - Surveys
ARTICLE 4 -- CONTRACTOR
Section 4.01 - Representations of Contractor Section 4.02 - Errors or Discrepancies Section 4.03 - Coordinated Composite Drawings Section 4.04 - Meetings Section 4.05 - Supervision by Contractor Section 4.06 – Project Scheduling Section 4.07 - Worker Identification and Site Access Control Section 4.08 - Related Work Section 4.09 – Coordination with Separate Contracts Section 4.10 - Cooperation with Other Contractors
ARTICLE 5 -- MATERIALS AND LABOR
Section 5.01 - Contractor's Obligations Section 5.02 - Means and Methods of Construction Section 5.03 - Contractor's Title to Materials Section 5.04 - Comparable Products ("Or Equal" Clause) Section 5.05 - Quality, Quantity and Labeling Section 5.06 - Tax Exemption
ARTICLE 6 -- SUBCONTRACTS
Section 6.01 - Subcontracting
ARTICLE 7 -- CHANGES IN THE WORK
Section 7.01 - Changes Section 7.02 - Overhead and Profit Section 7.03 - Deduct Change Order
GENERAL CONDTIONS 007100 - 2
ARTICLE 8 -- PAYMENT
Section 8.01 - Provision for Payment Section 8.02 - Substantial Completion and Reduction of Retainage Section 8.03 - Release and Consent of Surety Section 8.04 - Liens Section 8.05 - Withholding of Payments Section 8.06 - Late Payment Section 8.07 – False Representations/Information
ARTICLE 9 -- TIME OF COMPLETION
Section 9.01 - Substantial Completion Section 9.02 – Physical Completion and Contract Completion and Acceptance
ARTICLE 10 -- CLAIMS AND DISPUTES
Section 10.01 - Claim for Extra Work Section 10.02 - Claim for Additional Cost Section 10.03 - Notice of Claim and Substantiation Section 10.04 - No Damages for Delay Section 10.05 - Continuance of the Work Section 10.06 - Resolution of Claim
ARTICLE 11 – TERMINATION OR SUSPENSION
Section 11.01 – Termination for Cause Section 11.02 - Termination for Convenience of Owner Section 11.03 - Owner's Right to do Work Section 11.04 - Suspension of Work Section 11.05 – Stoppage of Work
ARTICLE 12 -- BENEFICIAL OCCUPANCY
Section 12.01 - Occupancy Prior to Substantial Completion
ARTICLE 13 -- INSPECTION
Section 13.01 - Access to the Work Section 13.02 - Notice for Testing and Inspection Section 13.03 - Reexamination of Work Section 13.04 - Inspection of Work Section 13.05 - Defective or Damaged Work If, in the opinion of the Owner, it is undesirable to replace any defective or damaged materials or to reconstruct or correct any portion of the Work damaged or not performed in accordance with the Contract Documents, the Contract amount shall be reduced by an amount, which in the judgment of the Owner, shall be deemed equitable Section 13.06 – Testing of Work Section 13.07 - Final Completion Section 13.08 - Guarantee
ARTICLE 14 -- PROTECTION OF PERSONS AND PROPERTY
Section 14.01 – Site Safety and Protection Section 14.02 - Protection of Work Section 14.03 - Protection of Lives and Health Section 14.04 - Risks Assumed by the Contractor
ARTICLE 15--INSURANCE AND BONDS
GENERAL CONDTIONS 007100 - 3
Section 15.01 - General Provisions Section 15.02 - Submission of Insurance Section 15.03 - Insurance Provided by Contractor Section 15.04 - Other Insurance Provided by Contractor Section 15.05 - Stop Work Order - Insurance Section 15.06 – Builder’s Risk Section 15.07 - Bonds Provided by Contractor
ARTICLE 16 -- GENERAL PROVISIONS of the CONTRACT Section 16.01 - General Law Provisions Section 16.02 - Diesel Emissions Reduction Section 16.03 – State and Federal Labor Law Provisions Section 16.04 – Nondiscrimination Section 16.05 - Domestic Steel Section 16.06 - Failure to Comply with Article 16
ARTICLE 17—RECORDS/AUDITS/INVESTIGATIONS/ETHICS
Section 17.01 – Preparation of Records/Owner's Right to Inspect Records and to Audit Section 17.02- False Statements/Information/Disclosure Section 17.03 - Owner’s Right to Conduct Investigations Section 17.04 - Disclosure of Criminal Investigation Section 17.05 - Anti-Riot Provisions Section 17.06 - Ethical Conduct Section 17.07 – Continuing Integrity Section 17.08 – Iran Divestment
ARTICLE 18 -- 2005 PROCUREMENT LOBBYING LAW
Section 18.01 - Procurement Lobbying Law Section 18.02 - Contractor's Certifications Section 18.03 - Termination Provisions ARTICLE 19 -- EXECUTIVE ORDER No. 125 Section 19.01 - Determination of Contractor Responsibility Section 19.02 – NYS Vendor Responsibility Questionnaire
ARTICLE 20 -- OPPORTUNITY PROGRAMS
Section 20.01 - General Provisions Section 20.02 – Equal Employment Opportunity (EEO) Section 20.03 – Opportunities for Minority and Women-Owned Business Enterprises
(MWBE)
Section 20.04 - Good Faith Efforts Section 20.06 – Damages - MWBE Participation Section 20.07 – Reporting to Owner
ARTICLE 21- SERVICE-DISABLED VETERAN OWNED BUSINESSES
Section 21.01 – General Provisions Section 21.02 – Contract with Goals
GENERAL CONDTIONS 007100 - 4
ARTICLE 1 -- DEFINITIONS
Section 1.01 - Definitions
The following terms as used in the Contract Documents shall be defined as follows:
Addendum or Addenda – Additional provisions of the Contract Documents issued in writing prior to the receipt of bids.
Alternate – Scope(s) of Work stated in the Contract documents to be added or deducted from the
Contractor’s base bid amount for alternate labor, materials and/or methods of construction.
Allowance – A sum of money set aside in the Agreement and included in the Contractor’s lump sum base bid for a scope of work which has been specified in the Allowance section of the General
Requirements. Reimbursement for Allowance work shall be as per General Conditions Article 7 –
Changes in the Work.
Application for Payment – A Contractor’s written billing request, on a form:
A. prepared by the Owner from the Schedule of Values approved by the Owner;
B. completed by the Contractor;
C. adjusted by the Owner; and
D. signed by the Contractor, requesting partial or full payment for partial or full performance of the Contract.
Beneficial Occupancy – The stage in the performance of the Work prior to Substantial Completion when a designated portion of the Work is sufficiently complete in accordance with the Contract
Documents so the Owner or Client can occupy or utilize such portion of the Work for its intended use, evidenced by the Notice of Beneficial Occupancy executed by the Owner following approval from the
Authority Having Jurisdiction. Beneficial Occupancy may or may not allow for completion of outstanding punch list items, as required by the Contract Documents. Notice of Beneficial Occupancy requires that the designation portion of Beneficial Occupancy Work function in a safe, reliable and warrantable manner.
Change Order – Written notice, in a standard Owner’s form, to the Contractor, signed by the
Contractor and executed by the Owner, changing the Contract Documents in accordance with General
Conditions Article 7 - Changes in the Work, or a Forced Change Order.
Claim - A demand by the Contractor seeking, as a matter of right, adjustment or interpretation of
Contract terms, payment of money, an extension of time, or other relief with respect to the terms of the
Contract. The term Claim also includes other disputes and matters in question between the Owner and
Contractor arising out of or relating to the Contract.
Client – Hunter College / City University of New York.
Construction Manager - A natural person, partnership, limited liability company, corporation, or other legal entity regularly engaged in management of construction projects, and so designated by the Owner.
GENERAL CONDTIONS 007100 - 5
Consultant - A natural person, partnership, limited liability company, corporation, or other legal entity providing architectural, engineering, construction management, testing, inspection, commissioning, or other professional services, and so designated by the Owner.
Contract - The agreement between the Owner and the Contractor consisting of the Contract Documents.
Contract Amendment – A written instrument, signed by an authorized officer of the City University of
New York and an authorized officer of Contractor, amending, modifying, changing, or supplementing the
Contract.
Contract Completion and Acceptance - The stage in the performance of the Work when all Work required to be performed by the Contract, including but not limited to submission of all documentation required for final payment, except any Work that may be required in the future with respect to:
A. any warranty or guarantee in the Contract Documents;
B. General Conditions Article 6 – Subcontracts, Sections 6.01 E through I;
C. General Conditions Article 14 - Protection of Persons and Property; or
D. General Conditions Article 15 – Insurance and Bonds, is complete in accordance with the Contract Documents, evidenced by the Notice of Contract
Completion and Acceptance executed by the Owner. Contract Completion and Acceptance follows or may be concurrent with Physical Completion.
Contract Documents - The Notice to Bidders, Information for Bidders, Form of Bid, Agreement, Payment
Bond, Performance Bond, General Conditions, General Requirements, Drawings, Specifications, Addenda, Change Orders, Contract Amendments, and all provisions of law deemed to be included in the Contract.
Contractor - A natural person, partnership, limited liability company, corporation, or other legal entity with whom the Owner enters into the Contract to perform the Work.
CUNY - The City University of New York.
DASNY - Dormitory Authority of the State of New York
Design Professional - A natural person, partnership, limited liability company, corporation, or other legal entity providing architectural or engineering professional services and so designated by the Owner.
Disputed Work Directive - Written directive, in a standard Owner’s form, from and executed by the
Owner to the Contractor directing the Contractor to proceed with the Work described in the Disputed
Work Directive in accordance with General Conditions Article 10 – Claims and Disputes.
Extra Work - Any work in addition to the Work initially required to be performed by the Contractor pursuant to the Contract Documents.
Facility – the operating unit of the Client where the Site is located.
False Claim – Any Claim which is, either in whole or part, false or fraudulent.
GENERAL CONDTIONS 007100 - 6
False Representation – This action takes place when a person has knowledge of the value of the work and materials supplied, performed, or proposed (the “Information”) constituting the Claim, Change Order, or Application for Payment and either:
A. acts in deliberate ignorance of the truth or falsity of the Information or
B. acts in reckless disregard of the truth or falsity of the Information.
Forced Change Order –Written notice, in a standard Owner’s form, to the Contractor, without the
Contractor’s signature and executed by the Owner, changing the Contract Documents in accordance with General Conditions Article 7 – Changes in the Work.
Furnish - To deliver to the Site ready for installation.
Hazardous Material – any substance (gas, liquid, or solid) or agent (biological, chemical, radiological, physical, or having two or more of the preceding characteristics) which has the potential to cause harm to humans, animals, or the environment, either by itself or through interaction with other factors, including but not limited to heavy metals, volatile organic compounds (VOCs), semi-volatile organic compounds
(SVOCs), pesticides, herbicides, dioxins, biological wastes, carcinogens, asbestos or any substance containing asbestos, polychlorinated biphenyls, lead, urea formaldehyde, explosives, radionuclides, radioactive materials, chemicals known or suspected to cause cancer or reproductive toxicity, pollutants, effluents, contaminants, emissions, infectious wastes, any petroleum or petroleum-derived waste or product or related materials, and any item defined as a hazardous, special, or toxic material, substance, or waste under any Hazardous Material Law, including, but not limited to, the NYS Environmental
Conservation Law and Title 6 of the New York Code of Rules and Regulations.
Hazardous Material Laws – collectively, any present federal, state or local law, including all valid amendments, relating to public health, safety, or the environment, including without limitation, the
Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. §6901 et seq.; the Comprehensive
Environmental Response, Compensation, and Liability Act (“CERCLA”), 42 U.S.C. §9601 et seq., as amended by the Superfund Amendments and Reauthorization Act of 1986 (“SARA”); the Clean Air Act, 42 U.S.C. §7401 et seq.; the Hazardous Materials Transportation Act, 49 U.S.C. §5101 et seq.; the Clean
Water Act, 33 U.S.C. §1215 et seq.; the Toxic Substances Control Act, 15 U.S.C. §2601 et seq.; the Safe
Drinking Water Act, 42 U.S.C. §300f et seq.; the Federal Insecticide, Fungicide and Rodenticide Act, 7
U.S.C. §136 et seq.; the Emergency Planning and Community Right-to-Know Act, 42 U.S.C. §11001 et seq.;
the Occupational Safety and Health Act of 1970, 29 U.S.C. §651 et seq.; the Atomic Energy Act, 42
U.S.C. §2201 et seq.; the NYS Environmental Conservation Law; the NYS Labor Law; the NYS Public
Health Law; and the amendments, regulations, orders, decrees, permits, licenses or deed restrictions now or hereafter enacted or promulgated under any such statute.
Install - To unload at the delivery point at the Site and perform every operation necessary to establish secure mounting and correct operation at the proper location.
Letter of Intent - Written notice, signed by the Owner, to the Contractor, which accepts the
Contractor’s Form of Bid and transmits the Agreement, Payment Bond, Performance Bond, and other documents to the Contractor for execution. The Letter of Intent is not the formal notice to begin the physical Work of the Contract.
Means and Methods of Construction - Labor, materials, temporary structures, tools, plant, and
GENERAL CONDTIONS 007100 - 7
construction equipment, and the manner and time of their use, necessary to accomplish the result intended by the Contract Documents.
GENERAL CONDTIONS 007100 - 8
Notice of Beneficial Occupancy – Written notice, in a standard Owner’s form, to the Contractor, executed by the Owner and delivered to the Contractor prior to Substantial Completion, that certain
Work of the Contract Documents, identified in such Notice of Beneficial Occupancy, satisfies the criteria for Beneficial Occupancy and will be occupied or utilized by the Owner or Client.
Notice of Contract Completion and Acceptance – Written notice, in a standard Owner’s form, to the
Contractor, executed by the Owner, that the Work required to be performed by the Contract
Documents, except any Work required by any warranty or guarantee in the Contract Documents, satisfies the criteria for Contract Completion and Acceptance.
Notice of Physical Completion - Written notice, in a standard Owner’s form, to the Contractor, executed by the Owner, that the Work of the Contract Documents satisfies the criteria for Physical
Completion.
Notice of Substantial Completion - Written notice, in a standard Owner’s form, to the Contractor, executed by the Owner, that the Work of the Contract Documents satisfies the criteria for Substantial
Completion and constitutes the start of the guarantee period.
Notice to Proceed –
A. Written notice, signed by the Owner, to the Contractor, that acknowledges receipt by the Owner of the signed Agreement, Payment Bond, and Performance Bond from the Contractor and directs the
Contractor to start performance of the Work; or
B. Written notice, in a standard Owner’s form, to the Contractor, executed by the Owner, directing the Contractor to proceed with the change in the Work described therein in accordance with General
Conditions Article 7 – Changes in the Work. A Notice to Proceed cannot change the Contract amount or the date to achieve Substantial Completion. A Notice to Proceed can change only the
General Requirements, the Drawings, or the Specifications.
NYS – New York State
Other Contractor(s) – The one or more natural persons, partnerships, limited liability companies, corporations, or other legal entities who have entered into a contract with the Owner to perform work
(including services) at or near the Site, identified in the Contract Documents or in writing by the Owner, including, but not limited to, contractors, Construction Managers, Consultants, and Design Professionals.
Other Contractors does not include the Contractor.
Owner – The entity that holds the contract with the contractor (Hunter College / City University of New
York)
Owner's Representative - A natural person, partnership, limited liability company, corporation, or other legal entity designated by the Owner to act on behalf of the Owner. See General Conditions Section
2.03 for limitations and further provisions on the Owner’s Representative.
Physical Completion – The stage in the performance of the Work when all Work to be performed at the Site, except any Work that may be required in the future by any warranty or guarantee in the Contract
Documents, is complete in accordance with the Contract Documents, evidenced by the Notice of Physical
GENERAL CONDTIONS 007100 - 9
Completion executed by the Owner. Physical Completion precedes or may be concurrent with
Completion and Acceptance. Physical Completion requires that all punch list work be completed by the
Contractor such that the Contractor no longer is required to perform Work at the site. All insurances must remain in effect until the Contractor achieves Physical Completion and the Contractor is required to submit certified payrolls through the date of Notice of Physical Completion.
Project - The work at or near the Site(s) carried out pursuant to the Contract and one or more other contracts.
Project Management Program – The software program used by the Owner to manage, monitor, and oversee performance of the Contract.
Provide - To Furnish and Install the Work complete in place and ready for its intended use.
Resume Work Order or Directive – Written notice, signed by the Owner, to the Contractor, to recommence or continue Work of the Contract Documents.
Schedule of Values – a form provided by the Owner, completed by the Contractor, and submitted to the Owner for review and written approval; the completed, approved form establishes a minimum level of allocation of the Contract amount among the items of Work to formulate the Contractor’s billing requests.
Site - The area(s) within the Contract limit, as indicated by the Contract Documents.
Stop or Suspend Work Order or Directive- Written notice, signed by the Owner, to the Contractor, to cease or hold Work of the Contract Documents.
Subcontract - An agreement between the Contractor and Subcontractor for Work on the Site.
Subcontractor - A natural person, partnership, limited liability company, corporation, or other legal entity under contract with the Contractor, or under contract with any Subcontractor, to perform any portion of the Work, or to provide any labor, material, equipment, or service at the Site.
Substantial Completion – The stage in the performance of the Work when all Work is sufficiently complete in accordance with the Contract Documents so the Owner or Client can occupy or utilize the
Work for its intended use, evidenced only by the Notice of Substantial Completion executed by the
Owner. Issuance of a temporary certificate of occupancy or a temporary approval for occupancy does not establish Substantial Completion. Work at the site (Physical Completion), and Work required by the
Contract (Completion and Acceptance) may still be required.
Unit Price – The price for one measured unit (i.e. cu. ft., sq. foot etc.) of completed Work activity. Each
Unit Price includes all labor, material, equipment, overhead, and profit attributable to that scope of
Work. Unit Prices shall be based upon estimated quantities specified in the Unit Prices section of the
General Requirements and as listed on the Form of Bid and will be paid based upon actual quantities of
Work performed as verified by the Owner.
Unmanned Aircraft System (UAS or DRONES)- An aircraft and its associated elements (including communication links and the components that control the unmanned aircraft) operated without the possibility of direct human intervention from within or on the aircraft.
Work - All obligations explicitly and implicitly imposed upon the Contractor by the Contract Documents.
GENERAL CONDTIONS 007100 - 10
ARTICLE 2 -- CONTRACT DOCUMENTS
Section 2.01 - Captions
The table of contents, titles, captions, headings, running headlines, and marginal notes contained herein and in the Contract Documents are solely to facilitate reference to various provisions of the Contract
Documents and in no way affect the interpretation of the provisions to which they refer.
Section 2.02 – Electronic Data Transfer
A. Electronic data includes, but is not limited to, all digital versions of any Contract Document, all digital files produced by mechanical, facsimile, electronic, magnetic, digital or other programs, programming notes or instructions, activity listings of electronic mail receipts or transmittals, output resulting from the use of any software program, including but not limited to, word processing documents, spreadsheets, database files, charts, graphs, drawings, specifications, outlines, electronic mail, personal digital assistant messages, instant messenger messages, PDF files, PRF files, batch files, ASCII files, DWG files and any other type of files now or hereafter allowed by Owner.
B. If the release of payment by paper check exceeds the agreed-upon due date, the Contractor or Vendor may request a change in the method of payment from check to electronic funds transfer. Such a request must be submitted in writing to the CUNY Vendor Payment Unit at
VendorPaymentUnit@cuny.edu. All requests will be reviewed and considered in accordance with the
Owner’s current payment policies and procedures. Approval of such a change is at the sole discretion of the Owner.
C. Electronic data produced in connection with the Contract is proprietary information of the Owner and to be treated as confidential and not to be disclosed to or shared with others outside the limits of the Contract without the express written consent of the Owner. The Owner makes no warranty, express or implied, as to the accuracy of the information transferred.
D. The Contractor shall pay, on behalf of the Owner, any loss which the Owner becomes legally liable to pay as a result of a claim by any person or entity against the Contractor or Owner, which results directly from an act, error, or omission of the Contractor in the provision of electronic data in respect to the Contract.
Section 2.03 - Owner
A. The Contract constitutes the entire agreement and understanding between the Contractor and the
Owner with respect to the Project and supersedes all prior agreements, arrangements and understandings, and all trade custom and trade usage, and the construction of any provision of the
Contract shall not be affected by the wording of any other agreement, whether between the
Contractor and the Owner or involving other parties. The Contract may not be amended, modified, supplemented, or changed in any way except in accordance with General Conditions Article 7 –
Changes in the Work or a Contract Amendment. The legal relationship between the Owner and the
Contractor shall be governed solely by the Contract and no rights shall arise on any other basis, including but not limited to, oral agreement, partial performance, estoppel, conduct of the parties, course of conduct or any other course of dealing involving the Project or any other project. The meaning and intent of the Contract Documents shall be interpreted solely by the Owner.
GENERAL CONDTIONS 007100 - 11
B. The Owner shall give all orders and directions contemplated under the Contract relative to the execution of the Work. The Owner shall determine the amount, quality, and acceptability of the
Work and shall decide all questions which may arise in relation to said Work. The Owner's estimates and decisions shall be final except as otherwise expressly provided herein.
C. The Owner may, at its sole and exclusive discretion, waive certain provisions of the Contract
Documents. Such waiver shall only be done by written instrument signed by a duly authorized officer of the Owner, and any such waiver shall apply solely in accordance with its terms and shall not act as a waiver of any provision of the Contract Documents, or estoppel against the enforcement thereof, in connection with any subsequent or separate event involving the Project or other projects.
D. Any differences or conflicts concerning performance which may arise between the Contractor and
Other Contractors performing work for the Owner shall be analyzed and resolved by the Owner as warranted by the circumstances. The Owner’s exercise of discretion in this regard shall be sole and exclusive and its decision concerning such differences and conflicts shall be final and binding.
E. The Owner may act through an Owner’s Representative designated as such in writing by the Owner.
Unless otherwise designated by the Owner, the Owner’s Representative is the Owner’s employee assigned to the Project as the project manager. Unless otherwise stated in writing by the Owner, the
Owner’s Representative is not an authorized officer of the Owner, does not have authority to approve a Labor Rate Worksheet on behalf of the Owner, does not have authority to waive the requirement for a narrative and fragnet schedule of General Conditions Section 7.01 C. 4, does not have authority to waive any provision of the Contract Documents and does not act for the Owner for General
Conditions Article 15 – Insurance and Bonds. Unless otherwise stated in writing by the Owner and notwithstanding the other provisions of this paragraph, the Owner’s Representative does have authority to issue a direction to attend a meeting in accordance with General Conditions Section 4.04, a Notice to Proceed in accordance with General Conditions Section 7.01 and a Disputed Work
Directive in accordance with General Conditions Section 10.01. The Owner may change the Owner’s
Representative and the scope of her, his or its duties by written notice to the Contractor in accordance with General Conditions Section 2.04. The Owner’s Representative’s signature by itself on a Change Order is not execution of a Change Order by the Owner. See General Conditions
Section 7.01 A. 5 for the requirements for execution of a Change Order by Owner.
Section 2.04 - Notice and Service Thereof
A. Any notice to the Contractor from the Owner relative to any part of the Contract shall be in writing and service considered complete when said notice is sent or delivered in person to the Contractor or its authorized representative, at the street address, postal address or email address given by the
Contractor in the Form of Bid. The Contractor may change any of these addresses by written notice to the Owner’s Procurement Unit, City University of New York, Facilities Planning, Construction &
Management, 555 West 57th Street, 16th Floor, New York, NY 10019; such change shall not be effective until Contractor receives from the Owner’s Procurement Unit a written acknowledgement that the change has been received.
B. Any notice from the Contractor to the Owner required by any part of the Contract shall be in writing and shall be sent or delivered to the Owner’s Representative at the street address, postal address or email address for the Owner’s Representative given in the Notice to Bidders. The Owner may change the Owner’s Representative or any of these addresses by written notice to the Contractor. If any part of the Contract shall require the Contractor to provide notice to any other employee or
GENERAL CONDTIONS 007100 - 12
unit of the Owner, the notice to such employee or unit is in addition to, and does not replace, the notice to the Owner’s Representative. Notice to the Owner may be delivered by certified mail, overnight delivery by a nationally recognized courier or, if an email address is provided, email. The
Owner’s Representative will endeavor to provide a written acknowledgment of receipt of the notice but any failure to provide such written acknowledgment shall not be a breach of the Contract, shall not in any way alter the Contractor’s obligation to provide timely notice and shall not in any way alter any of the other obligations of the Contractor under the Contract.
C. For all notices from the Contractor to the Owner required by any part of the Contract, the
Contractor shall have the burden of proving the Owner’s receipt of the notice.
Section 2.05 - Nomenclature
Materials, equipment, or other Work not defined or specified in the Contract but described in words that have a generally accepted technical or trade meaning shall be interpreted as having said meaning in connection with the Contract.
Section 2.06 - Invalid Provisions
If any term or provision of the Contract Documents or the application thereof to any natural person, partnership, limited liability company, corporation or other legal entity or circumstance shall, to any extent, be determined to be invalid or unenforceable, the remainder of the Contract Documents, or the application of such terms or provisions to natural persons, partnerships, limited liability companies, corporations or other legal entities or circumstances other than those to which it is held invalid or unenforceable, shall not be affected thereby and each term or provision of the Contract Documents shall be valid and be enforced to the fullest extent permitted by law. It is the intent of the Owner and the
Contractor that all provisions of the Contract shall be construed to be valid under applicable law and shall be enforced to the maximum extent possible.
Section 2.07 – Interpretation of Contract Documents
A. Should any provision in the Contract Documents be in conflict or inconsistent with the General
Conditions or supplements thereto, the General Conditions or supplements thereto shall govern.
B. Figured dimensions shall take precedence over scaled dimensions. Larger scale Drawings shall take precedence over smaller scale Drawings. Latest Addenda shall take precedence over previous Addenda and earlier dated Drawings and Specifications.
C. Should a conflict occur in or between or among any parts of the Contract Documents that are entitled to equal preference, the better quality or greater quantity of material or more onerous provision in the Owner’s judgment shall govern, regardless of cost, unless the Owner directs otherwise in writing.
In each conflict, the Owner, in its sole and exclusive discretion, shall determine whether the quality, quantity or onerous provision method will be used to resolve the conflict.
D. Drawings and Specifications are complementary. Anything shown on the Drawings and not mentioned in the Specifications, or mentioned in the Specifications and not shown on the Drawings, shall have the same effect as if shown or mentioned in both.
E. The term “materials” includes “supplies”.
GENERAL CONDTIONS 007100 - 13
F. Words of the masculine gender shall be deemed and construed to include correlative words of the feminine and neuter genders. Unless the context shall otherwise indicate, words importing the singular number shall include the plural number and vice versa.
Section 2.08 - Copies of Contract Documents
The Owner may furnish to the Contractor up to three (3) paper copies and one electronic (PDF) copy of the Contract Documents without charge. Additional sets may be furnished at the costs of reproduction and mailing.
ARTICLE 3 -- SITE CONDITIONS
Section 3.01 - Subsurface or Site Conditions Found Different
A. The Contractor acknowledges that the Contract amount set forth in its bid includes such provisions which the Contractor deems sufficient for all subsurface or site conditions the Contractor could reasonably anticipate encountering as indicated in the Contract Documents, or borings, reports, rock cores, foundation investigation reports, topographical maps, or other information available to the
Contractor or from the Contractor's inspection and examination of the Site prior to submission of bids.
B. The Owner assumes no responsibility for the correctness of any boring or other subsurface information and makes no representation whatsoever regarding subsurface conditions and test borings, reports, rock cores, foundation investigation and topographical maps which may be made available to the Contractor.
C. Should the Contractor encounter subsurface or site conditions at the Site materially differing from those shown on or described in or indicated in the Contract Documents, the Contractor shall immediately give written notice to the Owner of such conditions and shall not disturb said conditions until authorized to do so by the Owner in writing.
D. Subsurface or site conditions found materially differing from those that could have been reasonably anticipated may be cause for change to the Contract amount and time of completion. This determination will be made at the sole and exclusive discretion of the Owner.
Section 3.02 - Verifying Dimensions and Conditions
A. The Contractor shall take all measurements at the Site and shall verify all dimensions and conditions at the Site before proceeding with the Work. If said dimensions or conditions are found to conflict with the Contract Documents, the Contractor immediately shall refer said conflict to the Owner in writing.
The Contractor shall comply with any revised Contract Documents.
B. During the performance of the Work, the Contractor shall verify all field measurements prior to fabrication of building components or equipment, and proceed with the fabrication to meet field conditions.
C. The Contractor shall review all Contract Documents to determine exact location of all Work and verify spatial relationships of all the Work. Any question concerning said location or spatial relationships shall be submitted in a manner approved by the Owner.
GENERAL CONDTIONS 007100 - 14
D. Special locations for equipment, pipelines, ductwork, and other such items of the Work, where not dimensioned on plans, shall be coordinated with affected Other Contractors.
E. The Contractor shall be responsible for the proper fitting of the Work in place.
Section 3.03 - Surveys
Unless otherwise expressly provided in the Contract Documents, the Owner shall furnish the Contractor all surveys of the property necessary for the Work, but the Contractor shall lay out the Work.
ARTICLE 4 -- CONTRACTOR
Section 4.01 - Representations of Contractor
The Contractor represents and warrants:
A. That it is financially solvent and is experienced in and competent to perform the Work, and has the staff, workers, equipment, subcontractors, and suppliers to complete the Work within the time specified for the Contract amount.
B. That it is familiar with all federal, state, and local laws, codes, ordinances, orders, rules, and regulations which may affect the Work, the Contractor, or the Project.
C. That all temporary and permanent Work required by the Contract Documents can be satisfactorily constructed, and that said construction will not injure any person or damage any property.
D. That it has carefully examined the Contract Documents and the Site, and from the Contractor's own investigations is satisfied as to the nature and materials likely to be encountered, the character of equipment and other facilities needed for the performance of the Work, the general and local conditions, and all other materials or items which may affect the Work.
E. That it is satisfied that the Work can be performed and completed as required in the Contract
Documents, and warrants that it has not been influenced by any oral statement or promise of the
Owner or the Design Professional.
F. That to the best of Contractor’s knowledge, there are no pending or threatened suits, proceedings, judgments, rulings, or orders by or before any court or any governmental agency or arbitrator that could reasonably be expected to affect materially and adversely:
1. the financial condition or operations of the Contractor;
2. the ability of the Contractor to perform its obligations hereunder; or
3. the legality, validity, or enforceability of this Contract.
G. That Contractor is a duly organized and validly existing entity of the type described in the recital clauses of the Agreement and is in good standing under the laws of the jurisdiction of its formation; it has the legal right, power, and authority and is qualified to conduct its business and to execute and deliver this
Contract and perform its obligations under this Contract; and all regulatory authorizations have been
GENERAL CONDTIONS 007100 - 15
obtained and will be maintained, as necessary, for it to perform legally its obligations under this
Contract.
H. That executing and performing this Contract are within Contractor’s powers; that executing and performing this Contract has been duly authorized by all necessary action on the Contractor’s part;
and that such actions do not and will not violate any provision of law or any rule, regulation, order, writ, judgment, decree, or other determination presently in effect applicable to Contractor or its governing documents.
I. That this Contract constitutes the Contractor’s legal, valid, and binding obligation, enforceable against it in accordance with this Contract’s terms, subject to applicable bankruptcy, insolvency, reorganization, and other laws affecting creditors’ rights generally, and general equitable principles, to the discretion of the court before which proceedings to obtain the same may be pending.
J. That Contractor is in good standing with any union with craft labor on the Site for part or all the
Work of this Contract or the work of the Project.
K. That Contractor is experienced in the methods of design, engineering, installation, management, and construction contemplated for the Work of this Contract and for contracts of this nature, scope magnitude and quality and that the Contractor understands the complexity involved in this type of
Contract and the necessity to coordinate its Work with appropriate governmental agencies, the
Owner, and the Other Contractors.
L. That Contractor is fully informed as to all existing conditions and limitations, including local workforce/labor working arrangements and the continuous, regular, and uninterrupted operations of the Facility.
M. That Contractor has had the opportunity to consult with or has consulted with legal counsel of its choice before entering into this Contract.
N. That any breach of any of the representations and warranties of this General Conditions Section 4.01, any failure of the Contractor to familiarize itself with the Contract Documents, the Facility, the Site or the Project or any lack of knowledge on the part of the Contractor of any existing or foreseeable condition or conditions at the Site reasonably inferred from the Contract Documents which create difficulties or hindrances in the execution of the Work shall constitute a conclusive and binding determination by the Contractor that resolving any adverse impact of such breach, failure or lack of knowledge does not constitute Extra Work and a waiver by the Contractor of all Claims for additional compensation or damages or time to achieve Substantial Completion as a result of the breach, failure or lack of knowledge.
Section 4.02 - Errors or Discrepancies
The Contractor shall examine the Contract Documents thoroughly before commencing the Work and report any errors or discrepancies to the Owner, in writing, within seven (7) calendar days of discovery.
The Owner shall not be responsible for costs, damages or delays due to the Contractor’s failure to comply with the requirements of this General Conditions Section 4.02.
GENERAL CONDTIONS 007100 - 16
Section 4.03 - Coordinated Composite Drawings
A. The Contractor shall prepare coordinated composite drawings clearly showing how the Work of the
Contractor is to be performed in relation to the work of Other Contractors, prepare scaled drawings and sections in the same digital software program, version, and operating system as the original
Contract Drawings or in an operating system approved by the Owner.
B. If, and only if, required by the Information for Bidders for the Contract, the Contractor shall run a conflicts and coordination check utilizing the Project Drawings within a three-dimensional software program of the Contractor’s choice to limit the number of physical conflicts that may occur during construction. Failure to run such a conflicts and coordination check or to resolve conflicts and coordination issues identified as a result of such a check prior to the initiation of the Work on Site shall constitute a:
1. conclusive and binding determination by the Contractor that resolution of the conflicts does not involve Extra Work; and
2. waiver by the Contractor of all Claims for additional compensation, damages, or time to achieve
Substantial Completion as a result of the existence of physical conflicts.
Section 4.04 - Meetings
The Contractor shall attend all meetings required by the Contract Documents and all meetings when directed to attend by the Owner. The Contractor shall be represented at all meetings by the on-Site superintendent described in General Conditions Section 4.05 A who shall attend the meetings in person unless the Owner in writing prior to the meeting directs otherwise. If the Owner directs, the Contractor shall be represented either by the project management personnel of General Conditions 4.05 B or by an authorized officer of Contractor; in each case, the project management personnel or the authorized officer shall attend the meetings in person. The Owner, in its sole and exclusive discretion, shall determine the time, date, location, and purpose of the meeting. The purpose of a meeting includes, but is not limited to, Project progress, submittal status, Change Orders, site logistics, coordination, inspections, testing, safety reviews, or anything which the Owner determines is useful for administration or performance of the
Contract or the Project.
Section 4.05 - Supervision by Contractor
A. The Contractor shall provide full-time competent supervision for the duration of the Contract. During the course of on-Site Work, the Contractor shall provide a full-time on-Site superintendent who shall have full authority to act for the Contractor at all times. The superintendent shall read, write, and speak
English fluently, as well as communicate with the Contractor’s workers and the workers of all
Subcontractors.
B. The Contractor shall also provide competent project management personnel in addition and superior to the full-time on-Site superintendent who shall also have full authority to act for the Contractor at all times except such project management personnel cannot modify or rescind any action of the full-time on-Site superintendent directed to the Owner without the Owner’s written consent.
C. If at any time the supervisory staff is not satisfactory to the Owner, the Contractor shall, if directed in writing by the Owner, immediately replace such supervisory staff with other staff satisfactory to the Owner at no additional cost to the Owner.
GENERAL CONDTIONS 007100 - 17
D. The Contractor shall remove from the Work any employee of the Contractor or of any Subcontractor when so directed in writing by the Owner.
Section 4.06 – Project Scheduling
A. The Contractor shall provide a project scheduler, experienced in critical path method (CPM) scheduling. The scheduler’s experience and credentials shall be submitted in writing to the Owner for review and acceptance prior to proceeding with scheduling of the Work. The Owner may withdraw its acceptance of the project scheduler at any time thereafter for failure to perform in accordance with the Contract. The Contractor shall provide a replacement scheduler and submit the replacement’s experience and credentials in writing to the Owner for review and acceptance as soon as possible. The replacement scheduler shall be at no additional cost to the Owner.
B. Using the software required by the Owner, the Contractor shall prepare, maintain, and revise the
Project CPM schedule to plan and monitor the progress of all Project operations, in accordance with the Contract Documents. See the General Requirements for further details.
C. Construction activities shall be interrelated on a single Project CPM schedule that represents the entire
Project, including the entire Contract duration from Notice to Proceed to Substantial Completion and through Contract Completion and Acceptance. The Contractor shall utilize the critical path method of network calculation to generate the Project CPM schedule and shall utilize the time-scaled precedence diagram method to show the Project CPM Schedule. The Project CPM Schedule shall utilize calendar days for the time scale. The Contractor shall ensure all logic constraints are identified between the Work of the Contract, the work of Other Contractors and Owner’s work prior to approval of the Project CPM schedule. See the General Requirements for further details.
D. The Owner may reject any proposed Project CPM schedule, any proposed updated Project CPM schedule or any proposed recovery Project CPM schedule if the Owner, in its sole and exclusive discretion, finds the proposed Project CPM schedule, proposed updated Project CPM schedule or proposed recovery Project CPM schedule defective for any reason, including but not limited to:
1. Defective logic;
2. Excessive use of constraints;
3. Activity durations that are inconsistent with actual or available workforce;
4. The appearance of an effort to manipulate the schedule so that responsibility for an adverse impact is associated with a natural person or entity other than the natural person or entity responsible for the adverse impact; or
5. Lacking executive summary and/or narrative.
E. If a proposed Project CPM schedule, proposed updated Project CPM schedule or proposed recovery
Project CPM schedule is rejected by the Owner, the Owner will notify…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .