Exhibit 2_Deliverable Schedule.pdf

PDF 113 KB Posted

Attached to
Procurement of Custom Semi-Trailer for Mobile Asphalt Technology Center (MATC) Program
Solicitation number
693JJ321Q000051
Issued by

About this file

This document outlines the deliverables schedule for a federal contract to procure a custom semi-trailer for a Mobile Asphalt Technology Center program. Key deliverables include kickoff meeting minutes due one week before the meeting, build drawings due two weeks after kickoff, and quarterly design review/inspection reports. A 508 compliant mobile laboratory trailer is due 12 months following the purchase order effective date and must be delivered to the Federal Highway Administration's Turner Fairbank Highway Research Center. Submittals for the deliverables listed will be in Microsoft Word format via email to the contracting officer, with the exception of the physical delivery of the mobile laboratory trailer.

View the file

Other files

File Type Posted
Attachment 1 - MATC Supplied Equipment.pdf PDF
693JJ321Q000051.pdf PDF
Exhibit 1 - MATC Trailer Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 2 – Deliverables Schedule

DELIVERABLES SCHEDULE

This technical exhibit lists any reports or documentation that is required as a deliverable to include the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes.

Deliverable Compliant Frequency

# of Copies Medium/Format Submit To

Kick-off Meeting No Due on the weekday closest to the 15th of the month following the quarterly period of performance

One (1) electronic copy

Electronic copy in MS Word® format

COR AND

CS BY E-

MAIL

Kick-off Meeting Minutes

No One-time, up to one (1) week before the date of kickoff meeting.

one (1) copy

Electronic copy in MS Word

COR by e-mail

Build Drawings No One-time, up to two (2) weeks from date of kickoff meeting.

one (1)

Design Review/Inspection

No Quarterly one (1)

MATC Laboratory Trailer

No 12 months following PO effective date

N/A Physical COR at Turner Fairbank

HRC