Exhibit 2_Deliverable Schedule.pdf
PDF 113 KB Posted
- Solicitation number
- 693JJ321Q000051
About this file
This document outlines the deliverables schedule for a federal contract to procure a custom semi-trailer for a Mobile Asphalt Technology Center program. Key deliverables include kickoff meeting minutes due one week before the meeting, build drawings due two weeks after kickoff, and quarterly design review/inspection reports. A 508 compliant mobile laboratory trailer is due 12 months following the purchase order effective date and must be delivered to the Federal Highway Administration's Turner Fairbank Highway Research Center. Submittals for the deliverables listed will be in Microsoft Word format via email to the contracting officer, with the exception of the physical delivery of the mobile laboratory trailer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - MATC Supplied Equipment.pdf | ||
| 693JJ321Q000051.pdf | ||
| Exhibit 1 - MATC Trailer Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2 – Deliverables Schedule
DELIVERABLES SCHEDULE
This technical exhibit lists any reports or documentation that is required as a deliverable to include the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes.
Deliverable Compliant Frequency
# of Copies Medium/Format Submit To
Kick-off Meeting No Due on the weekday closest to the 15th of the month following the quarterly period of performance
One (1) electronic copy
Electronic copy in MS Word® format
COR AND
CS BY E-
Kick-off Meeting Minutes
No One-time, up to one (1) week before the date of kickoff meeting.
one (1) copy
Electronic copy in MS Word
COR by e-mail
Build Drawings No One-time, up to two (2) weeks from date of kickoff meeting.
one (1)
Design Review/Inspection
No Quarterly one (1)
MATC Laboratory Trailer
No 12 months following PO effective date
N/A Physical COR at Turner Fairbank
HRC