This document contains a technical compliance matrix and details for the Atmosphere Observing System-Inclined (AOS-I) Atmospheric Lidar Instrument for Clouds and Aerosol Transport (ALICAT) Receiver Telescope solicitation issued by the National Aeronautics and Space Administration Goddard Space Flight Center. The solicitation requires the design, fabrication, testing, and delivery of two beryllium Ritchey-Chretien telescopes for use on the ALICAT instrument. The technical compliance matrix assesses offeror's ability to meet various requirements specified in the statement of work and specifications, including experience with similar projects, facilities, quality assurance processes, and engineering documentation requirements. It also addresses offeror qualifications like ISO 9001 certification and staff experience needed for telescope design, assembly, and testing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Yes No
1 Proposers will be able to meet the CDR requirements described in Section 2.3 of the ALICAT-OPT-SOW-0001 2 Proposers will be able to meet the Pre-Ship Review requirements described in Section 2.3 of the ALICAT-OPT-SOW-0001 3 Proposers have experience in similar NASA CDR and Pre-Ship reviews as described in Section 2.3 of the ALICAT-OPT-SOW-0001
Technology Yes No
4 Proposers can meet the telescope primary optical requirements described in Section 5 of the ALICAT-OPT-SPEC-001 5 Proposers can meet the telescope secondary optical requirements described in Section 6 of the ALICAT-OPT-SPEC-001
Proposers have delivered beryllium telescopes of simular prescription meeting the requirements described in Section 3 & 4 of the ALICAT-OPT-
SPEC-001
7 Proposers have the expertise needed to meet the telescope prescription requirements described in Section 3 & 4 of the ALICAT-OPT-SPEC-001
8 Proposers have the facilities to meet the telescope prescription requirements described in Section 3 & 4 of the ALICAT-OPT-SPEC-001
6 Proposers have the procedures and expertise in place to meet the materials and process control requirements described in Section 5 of the
7 Proposers have previous experience with the electroless nickel plating requirements described in Section 10 of the ALICAT-OPT-SPEC-0001
Proposers have the facilities and expertise to meet the telescope performance requirements described in Section 3 of the ALICAT-OPT-SPEC-
9 Proposers are able to meet the design verification requirements described in Section 3.2.4 & 5.4 of the ALICAT-OPT-SOW-0001
10 Proposers have previous experience in machining I-220-H Beryllium
Proposers have previous experience in designing similar I-220-H beryllium space Ritchey–Chrétien telescope projects with diameters larger than 0.5 meters
12 Proposers are have previous experience in gathering, documenting, and tracing the requirements for a project of similar size and complexity
Yes No
13 Proposers have the management and processes in place to manage and organize project documentation as described in Section 3 & 5 of the 14 Proposers can meet the management and reporting requirements as described in Section 2 of the ALICAT-OPT-SOW-0001 15 Proposers can meet the engineering documentation requirements as described in Section 3 of the ALICAT-OPT-SOW-0001 16 Proposers can meet the engineering analysis requirements as described in Section 12 of the ALICAT-OPT-SPEC-0001 and Section 3 of the ALICAT- 17 Proposers can meet the contamination control requirements as described in Section 6 of the ALICAT-OPT-SOW-0001 and Section 12.3 of the 18 Proposers can meet the quality assurance requirements described in Section 5 of the ALICAT-OPT-SOW-0001 19 Proposers are ISO 9001 certified 20 Proposers are able to meet the development flow requirements described in Section 4 of the ALICAT-OPT-SOW-0001
Yes No
21 Proposers have the necessary facilities and equipment that will be needed for the project 22 Proposers are able to meet the metrology requirements for the project described in Section 3.2 of the ALICAT-OPT-SOW-0001
Proposers have staff with the necessary qualifications and experience needed to design, assemble, and test the telescope described in ALICAT-
OPT-SPEC-0001
Reviews
Qualifications
Quality Assurance
File details come from the government source that posted it. Updated .