Exhibit 1 Technical Specifications~9.docx
DOCX document 30 KB Posted
- Attached to
- ESB - Ontario Fencing Repairs
- Solicitation number
- S-73000-00012144
- Issued by
- Morrow County, Oregon
About this file
This is an Exhibit 1 Technical Specifications document from the Oregon Department of Transportation (ODOT) for fence repair services on ODOT property. The project involves various fence repair and modification tasks prioritized in a seven-item list, including the Huntington Sand Shed fence modification, Lime fence repair, gate removals and replacements at MP 365WB and MP 344.4 WB, I-84 fence repairs, and chain link fence replacement at the North Ontario Interchange. The work must be completed by June 15, 2025, and requires adherence to the 2024 Oregon Standard Specifications for Construction and Standard Drawings RD810 and RD815. The contractor must work through the priority list sequentially from items 1-6, with item 7 dependent on remaining funding availability.
The project includes specific requirements for equipment staging near paved shoulders, coordination with property owners regarding livestock containment, and mandatory underground utility locates. Payment terms vary by task type, with some items paid on a lump sum basis (such as mobilization and Huntington Sand Shed modification), others on a linear foot basis (gate removal and replacement), and vandalized fence repair paid per occurrence. ODOT notes that funding may not be sufficient to complete priority list item 7, and the quantities for this item may be adjusted based on available funding after completing items 1-6.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 2 - Plans~3.pdf | ||
| ESB_RFCQ_279B.docx | DOCX document | |
| ESB_RFCQ_Attachments_279B.docx | DOCX document | |
| Insurance Exhibit.pdf | ||
| 00012144 Intent To Award.xlsx | XLSX spreadsheet | |
| Exhibit 5 - Site Photos.pdf | ||
| 00012144 Preliminary Results.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1 - TECHNICAL SPECIFICAITONS
SPECIAL PROVISIONS
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Request for Competitive Quotes and resulting Contract.
Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms. Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract; however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:
http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx
WORK SCOPE: This ESB Contract is to provide all material, labor and equipment necessary to conduct fence repair on ODOT property.
There are various locations of work for this project. Work for this project shall be performed and completed according to the priority list as provided in these Special Provisions. Contractor shall work through the priority list numerically starting at 1 and finishing at 7. Contractor shall consult with the ODOT Project Manager for priority list item 7. ODOT estimates it does not have enough funding to complete priority list item 7. Quantities of item 7 may decrease or increase in quantity of linear feet based upon ODOT’s available funding after completing the priority list Items 1-6.
Priority List:
1. Huntington Sand Shed fence modification
2. Lime fence repair
3. Remove gate and replace with fence at MP 365WB and remove gate and replace with fence at MP 344.4 WB.
4. I-84 Fence Repair MP 345.8 (Huntington interchange) to MP 345.3 repair or patch.
5. I-84 fence vandalism repair
6. Replace damaged Type CL-6R fence (chain link fence) at the North Ontario Interchange adjacent the Pilot Station.
7. WB MP 345.8 to work north as funding allows (MP 337.2) on the East side of the highway WB travel lanes. Replace fabric where necessary and re-stretch and straighten as can be done. Shall be paid by the Linear Foot based upon Bid Item 7 Removing and Rebuilding Fence.
The Bidder shall furnish all material, labor, and equipment necessary to perform all tasks in accordance with the 2024 Standard Specifications, 2024 Standard Drawings RD810 and RD815, these Special Provisions, and the terms and conditions in the contract documents. All matter, debris, vegetation and wire shall be removed and disposed of in accordance with Standard Specification 00290.20. No separate or additional payment will be made.
Parking and Staging of Equipment should take place as close as possible to the paved shoulder. When preforming work, the Contractor should try to avoid driving vehicles and equipment between the fence line and paved shoulders.
The adjacent landowners may have livestock within this work zone. The Fence Contractor may need to have a secondary fence in place to ensure livestock do not enter the Interstate. The Fence Contractor can decide with each of the property owners on how to handle livestock.
LOCATES: Contractor shall seek underground utility locates prior to installing any portion of the new fence. If adjustment to the fence location is needed to avoid underground utilities, the project manager will accommodate reasonable alternate locations.
Applicable Standard Specifications: “2024 Oregon Standard Specifications for Construction”, 2024 Oregon Standard Drawings and these Special Provisions.
Completion Date: All work must be complete by June 15, 2025
SECTION 00180 – PROSECUTION AND PROGRESS
Comply with Section 00180 of the Standard Specifications modified as follows:
00180.50(h) Contract Time – The Contractor shall complete all work to be done under the contract no later than June 15, 2025
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications modified as follows:
00210.90 Payment – Payment for mobilization will be made at the contract lump sum amount for item “Mobilization”.
SECTION 00225 – WORK ZONE TRAFFIC CONTROL
Comply with Section 00225 of the Standard Specifications modified as follows:
00225.02 General Requirements – add the following after the last paragraph of this subsection: Provide Temporary Traffic Control in accordance with the “ODOT Temporary Traffic Control Handbook for Operations of Three Days or Less”.
SECTION 01050 - FENCES
Comply with Section 01050 of the Standard Specifications modified as follows:
01050.80 Measurement - Add the following the subsections:
1050.80 (j) Repair vandalized fence Add the following subsection:
Repair Vandalized fence consists of resetting and/or replacing damaged fence. The type of repair and type of fence will vary depending on the location and will be woven type 2 or chain link. Measurement will be of the Each basis.
1050.80 (k) Huntington Sand Shed fence modification Huntington Sand Shed fence modification consists of adding a top rail and two strands of barb wire to the existing chain link fence attached to both sides of the gate. The top rail and barb wire shall be incidental to the lump sum item of the modification. No measurement will be made.
1050.80 (m) Remove access gates and replace with fence Remove access gates at the locations specified and replace with new woven wire fence. Measurement will be by the lineal foot basis and include all materials, labor and incidentals to perform the work.
01050.90 Payment - Add the following the end of this subsections:
f) Repair vandalized fence- Repair vandalized fence will be paid on each occurrence. Payment includes all Labor, materials, equipment, and incidentals to perform the work.
g) Huntington Sand Shed fence modification Huntington Sand Shed fence modification shall be paid lump sum for all Labor, materials, equipment, and incidentals to perform the work.
h) Remove access gates and replace with fence Removing and replacing gate will be paid by the linear foot and includes removal of the existing gates and installation of new fence. Payment includes all Labor, materials, equipment, and incidentals to perform the work. Removal and disposal of the existing gate is incidental to the installation of the new fence