Exhibit 1 RFP N4044324R0101.pdf

PDF 475 KB Posted

Attached to
RFI MSC GSR IDIQ Rolling Admissions - Info Only Request
Solicitation number
N4044326R0000
Issued by

About this file

This is a Request for Proposal (RFP) for a Firm-Fixed-Price Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Contract (MAC) for West Coast General Ship Repair services. The solicitation is issued by the Military Sealift Command (MSC) and seeks contractors to perform ship repair tasks across four geographic lots: San Diego, CA; Bremerton, WA; Seward, AK; and Oahu, HI. The contract will support repair and maintenance of various MSC vessel classes, including Dry Cargo/Ammunition Ships, Fleet Replenishment Oilers, Hospital Ships, and Submarine Tenders, among others.

The contract has a five-year ordering period with a maximum capacity of $49,000,000 and a minimum guarantee of $3,500 per contract. Contractors must demonstrate capabilities in ABS and USCG regulations, welding procedures, emergency response, hazardous waste management, and safety training. The solicitation uses a best-value source selection approach, evaluating technical factors and past performance. Proposals are due by 10:00 AM local time on 14 October 2024, with award anticipated shortly thereafter. Contractors will be expected to provide ship repair services including compressor overhauls, pipe renewals, valve repairs, painting, structural repairs, and other maintenance tasks across the specified geographic lots.

View the file

Other files

File Type Posted
RFI N4044326R0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 14 Oct 2024

X

A X B X C

D

EX

X G F 35 - 41

42 - 50 X H 51 - 54 amador.r.estrada.civ@us.navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 54

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40443 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

AMADOR "REY" ESTRADA 619-524-9806

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 3

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

4 - 17 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 20 - 23 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 24 - 27 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

28 - 33

PART II - CONTRACT CLAUSES

MILITARY SEALIFT COMMAND, SSU SAN DIEGO

AMADOR "REY" ESTRADA

140 SYLVESTER RD, BLDG 570

NAVAL BASE POINT LOMA

SAN DIEGO CA 92106-3521

A

USE E MAILFAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

13 Sep 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4044324R0101

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

WEST COAST GENERAL SHIP REPAIR

FFP

Conduct General Ship Repair (GSR) in accordance with the terms and conditions of this contract, applicable local, state, and federal regulations, ABS and USCG regulations, as well as the terms and conditions established in individual delivery orders.

The offeror may submit Request for Orders (RFO) to support requirements for one, or any combination of, the following geographic locations:

Lot A: San Diego, CA

Lot B: Bremerton, WA

Lot C: Seward, AK

Lot D: Oahu, HI

Note: A Lot denotes the center point of a geographic area where the Government intends to conduct ship repair.

FOB: Destination J999

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job

OPTION SIX MONTH EXTENSION

FFP

Six Month Extension IAW FAR 52.217-8

The total amount of this CLIN is an estimate amount. The actual amount may exceed the CLIN total amount so long as the cumulative total does not exceed the overall IDIQ maximum.

J999

NET AMT

SUPPLEMENTAL INFORMATION

B – 1 MINIMUM GUARANTEE

Contract Minimum Guarantee Amount

1) The contract minimum guarantee amount is $3,500 per contract.

2) The contract minimum guarantee amount represents the minimum quantity of supplies and services the Government will order for the life of the contract.

3) The contract minimum guarantee amount applies to each Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) on an individual basis.

B – 2 MAXIMUM MULTIPLE AWARD CONTRACT (MAC) CAPACITY/CEILING

Contract Maximum Capacity

1) The contract maximum capacity amount is $49,000,000 across all MAC holders and geographic areas.

Section C - Descriptions and Specifications

LIST OF ABBREVIATIONS

ABIH: American Board of Industrial Hygiene ABR: Agreement for Boat Repair ABS: American Bureau of Shipping ACO: Administrative Contracting Officer ACU: Asbestos-Containing Material AGR: Additional Government Requirements AIHA: American Industrial Hygiene Association ALSC: American Lumber Standards Committee ALT: Alternate AMT: Amount ATP: Authorization to Proceed BLDG: Building CCO: Contract Change Order CD: Compact Disc CD-ROM: Compact Disc Read-Only Memory CFM: Contractor Furnished Material CFP: Contractor Furnished Property CFR: Condition Found Report CFR: Code of Federal Regulations CHENG: Chief Engineer CIH: Certified Industrial Hygienist CLF: Combat Logistics Force CLIN: Contract Line Item Number CONUS: Contiguous United States CPARS: Contractor Performance Assessment Reporting System DBIDS: Defense Biometric Identification Systems DFARS: Defense Federal Acquisition Regulation Supplement DO: Delivery Order DOD: Department of Defense DOD SAFE: Department of Defense Secure Access File Exchange DON: Department of the Navy EMAIL: Electronic Mail EN: Evaluation Notices EPA: Environmental Protection Agency ESRS: Electronic Subcontract Report System F/CC: Fibers Per Cubic Centimeter FAPIIS: Federal Awardee Performance and Integrity Information System FAR: Federal Acquisition Regulation FBLR: Fully-Burdened Labor Rate FFP: Firm Fixed Price FPCON: Force Protection Condition FTR: Federal Travel Regulations G&A: General and Administrative GFI-TD: Government Furnished Information – Technical Data GFM: Government Furnished Material GFP: Government Furnished Property GPE: Governmentwide Point of Entry GSR: General Ship Repair GTR: General Technical Requirements IAW: In Accordance With ID: Identification IDIQ: Indefinite Delivery Indefinite Quantity

ISO: International Organization for Standardization ISPM: International Standards for Phytosanitary Measures JBPHH: Joint Base Pearl Harbor Hickam JTR: Joint Travel Regulations KO: Contracting Officer KWh: Kilowatt Hour LLTM: Long Lead Time Material LPTA: Lowest Price Technically Acceptable M&IE: Meals and Incidental Expenses MAC: Multiple Award Contract MARPOL: Marine Pollution MCU: Marine Coating Usage MM: Millimeter MPT: Micro-Purchase Threshold MSC: Military Sealift Command MSCREP: Military Sealift Command Representative MSRA: Master Ship Repair Agreement MTA: Mid-Term Availability N/A: Not Applicable NBK-Bremerton: Naval Base Kitsap-Bremerton NBSD: Naval Base San Diego NCACS: Navy Commercial Access Control System NCIS: Naval Criminal Investigative Service NDA: Non-Disclosure Agreement NMCARS: Navy Marine Corps Acquisition Regulation Supplement NO: Number NPRN: National Port Readiness Network NRSW: Naval Region Southwest NSE: Naval Station Everett NSP: Not Separately Priced ODC: Other Direct Costs OSHA: Occupational Safety & Health Administration PAT: Proficiency in Analytical Testing PDF: Portable Document Format PII: Personally Identifiable Information PM: Program Manager POP: Period of Performance PPE: Principle Port Engineer PPIRS: Past Performance Information Retrieval System QA: Quality Assurance QC: Quality Control RDOP: Request for Delivery Order Proposals REV: Revision RFC: Request for Specification Clarification RFO: Request for Order (solicitation) ROH/DD: Regular Overhaul/Dry-Docking SECNAV: Secretary of the Navy SF: Standard Form SMS: Shipboard Safety Management System SOLAS: Safety of Life at Sea SOW: Statement of Work SUB: Subcontractor TPSN: Time Phased Sequencing Network TWA: Time-Weighted Average USC: United States Code

USCG: United States Coast Guard USNS: United States Naval Ship VOC: Volatile Organic Compound VR: Voyage Repair WAWF: Wide Area Workflow WI: Work Item WPM: Wood Packaging Material WPQ: Welder Performance Qualifications WPS: Weld Procedures

SCOPE OF WORK

1.0 GENERAL

1.1. Military Sealift Command Mission Statement

Military Sealift Command (MSC) exists to support the joint warfighter across the full spectrum of military operations. MSC delivers agile logistics, strategic sealift, as well as specialized missions anywhere in the world, under any conditions, 24/7, 365 days a year.

1.2. Combat Logistics Force

The ships of MSC’s Combat Logistics Force (CLF) are the supply lines to U.S. Navy ships at sea.

These ships provide virtually everything that Navy ships need including fuel, food, fleet ordnance and dry cargo, spare parts, mail, and other supplies. CLF ships enable the Navy fleet to remain at sea and combat ready for extended periods of time. (Military Sealift Command 2020-2021 Handbook).

1.3. Ship Repair Requirements

Work items (WI) define specific ship repair requirements and establishes the basis of a contract between ship repair contractors and the Government. Voyage repairs (VR) are planned repair events that are comprised of various WIs to provide a ship with a range of repair services, from pipe fitting and electrical work to valve repairs and engine overhauls. VRs constitute the main ship repair effort undertaken at MSC SSU SD and are composed of WIs that range in number from a few to dozens, with various levels of complexity and certification requirements. The average range of VRs supported by MSC SSU SD are characterized by the following attributes:

Period of Performance (POP) timeframe between 14 and 30 days.

Contains between 12 and 25 Work Items (WI).

Contains between 30 and 50 references (e.g. technical drawings, instructions, OEM manuals).

Price range: $300,000 to $1.5 Million.

Requires ABS and USCG inspection & certification of work completed.

Requires utilization of ABS-approved welding procedures (WPS).

Requires extensive coordination of multiple subcontractors to include directed OEMs.

Requires ordering of parts and materials to support completion of all work by end of awarded

POP.

Requires daily on-site Project Management (PM) supervision of contractor personnel and interaction with government Onsite Management Team (OMT).

Contractor responsible for providing all LP, power, crane support, and other equipment required to complete the repair.

Requires significant administrative effort to develop & submit conditions found reports

(CFR), contract change orders (CCO), material certification documentation, and ABS & USCG certification documents.

Requires strong Quality Assurance (QA) oversight and enforcement.

Requires developing production schedules and driving to completion dates.

Complete all growth work and new work (e.g. emergent repairs) by end of awarded POP.

Contractor personnel adherence to OSHA safety standards for maritime environments.

2.0 EXAMPLES OF TYPICAL SPECIFIC TASKS

2.1. The following list is representative of the work required under the GSR IDIQ MAC:

2.1.1. Compressors. Accomplish top end overhaul or major overhaul of ship’s service or high-pressure compressors.

2.1.2. Main Propulsion or Auxiliary Boilers & Incinerators. Accomplish inspections, refractory repairs, tube renewals, casing repairs, and ABS certified weld repairs.

2.1.3. Pipes. Accomplish pipe renewals, including carbon steel or copper-nickel, aluminum, and composite for various systems.

2.1.4. Valves. Accomplish repairs to gate, globe, check, and butterfly valves.

2.1.5. Pumps. Accomplish pump overhauls including replacements of bearings, wear rings, shafts, and impellers.

2.1.6. Motors. Accomplish reconditioning or rewinding of electric motors for fans and equipment.

2.1.7. Insulation. Accomplish renewals of pipe insulation.

2.1.8. Lagging. Accomplish renewal of equipment lagging blankets, bulkhead and overhead insulation.

2.1.9. Painting. Prepare and coat various surfaces on ship including freeboard, house, kingposts, masts, interior spaces, and superstructure.

2.1.10. Flight deck non-skid. Flight deck non-skid application shall meet all NAVAIR requirements for installation.

2.1.11. Gas Free. Accomplish cleaning and gas freeing of tanks, voids, and spaces. Provide required gas free chemist services.

2.1.12. Ventilation. Accomplish cleaning of ventilation systems.

2.1.13. Galley Systems. Accomplish inspections and repairs to galley systems, including griddles, ovens, deep fat fryers, steam kettles, and refrigerators.

2.1.14. Rigging. Remove and reinstall large equipment components.

2.1.15. Staging and Scaffolding. Provide staging and scaffolding services to provide safe access to various shipboard locations without a normal means of access.

2.1.16. Structural Repairs. Provide materials to accomplish repairs with ABS approved welders.

2.1.17. Air Conditioning & Refrigeration. Accomplish equipment maintenance and repair requirements using skilled personnel familiar with the equipment and holding EPA certification for refrigerant handling and recovery.

2.1.18. Ship’s Cranes. Accomplish repairs, weight tests, and certification of ship’s cranes.

2.1.19. Firefighting and SCBA. Accomplish annual recertification utilizing DOT approved facility for hydrostatic test and refill of gas cylinders.

2.1.20. Main Propulsion and Electrical Generators. Provide parts, service, and support.

2.1.21. Underwater hull cleaning. Conduct cleaning of hull and incidental repairs below the waterline.

2.1.22. Boat & Davit Repairs. Provide parts, service, and support.

2.1.23. Navigation Systems. Provide parts, service, and support.

2.1.24. Anchor Windlass and Steering hydraulics systems. Provide parts, service, and support.

2.1.25. Redline & As-Built Drawings. Provide redline and As-Built drawings as directed.

2.1.26. Subcontractor Support. Provide the services of subcontractors and directed OEMs for the repair of designated systems & equipment.

3.0 REQUIRED STANDARD OF WORKMANSHIP

3.1. Ship repair contractors must execute the SOW as specified in each WI. MSC will provide different levels of monitoring and contractor interaction depending on the complexity of work, duration of the repair, etc. United States Coast Guard (USCG) and American Bureau of Shipping (ABS) provide regulatory compliance checks and clearance.

3.2. Repairs aboard MSC ships adhere to various regulations to include, but not limited to, the following:

MSC General Technical Requirements (GTR) Marine Pollution (MARPOL) Safety of Life at Sea (SOLAS) Occupational Safety & Health Administration (OSHA)

Environmental Protection Agency (EPA) Shipboard Safety Management System (SMS) regulations

3.3. Unless stated otherwise, where laws, regulations, requirements, or commercial standards are referred to within the contract or any delivery orders (DO), the latest revision that is in effect on the date of the DO solicitation is applicable.

3.4. Contractor Personnel will comply with OSHA training requirements for shipyards and confined space entry.

3.5. All welding is to be conducted in accordance with (IAW) ABS weld standards. No other weld standards/procedures allowed.

3.6. At time of proposal submission, Offerors will provide ABS red-stamped weld procedures (WPS) for the following:

3.6.1. Carbon Steel welding compliant with D1.1 Group 1. Range: 1/4" thickness to 3/4" thickness with position letters.

3.6.2. Steel piping compliant with Group 2 to Group 2.

3.6.3. Copper-Nickel piping compliant with Group 2 to Group 2.

3.7. ABS-certified individual Welder Performance Qualifications (WPQ) will be provided to the MSC

Representative (MSCREP) and ABS surveyor prior to commencement of work.

4.0 EMERGENT SHIP REPAIR REQUIREMENTS

4.1. This contract will support emergent ship repair requirements.

4.2. IAW FAR 16.505(b)(2), the Government may elect to make direct awards as mission requirements warrant.

4.3. The Government will confirm contractor’s ability to support emergent repairs prior to issuing a

DO.

4.3.1. Government may elect to streamline the Request for Order (RFO) submission requirements.

4.3.2. Designated contractor is required to mobilize personnel and resources upon notification of award and begin work within 48 hours.

4.4. Contractor personnel may be required to conduct repairs while ship is underway.

5.0 PLACE OF PERFORMANCE

5.1. Government installations and commercial piers located on the West Coast of the United States, Alaska, and Hawaii.

5.2. The following geographic areas apply:

5.2.1. Lot A: San Diego, CA

5.2.2. Lot B: Bremerton, WA

5.2.3. Lot C: Seward, AK

5.2.4. Lot D: Oahu, HI

Note: A Lot denotes the center point of a geographic area where the Government intends to conduct ship repair.

5.3. The Government may elect to conduct ship repairs at commercial pier facilities or pier facilities that Contractors own, operate, or have access to. Contractor pier facilities are required to be part of the National Port Readiness Network (NPRN; https://www.maritime.dot.gov/ports/national-port-readiness-network-nprn) in order to host MSC ships.

5.3.1. Contractors who own, operate, or have access to pier facilities may request information on NPRN admission requirements from the responsible Contracting Officer.

5.4. Performance location will be specified at the DO level.

6.0 ORDERING PERIOD

6.1. Ordering Period is five years from date of award.

6.2. Individual Period of Performance (POP) periods will be specified at the DO level.

7.0 All MSC vessel classes are supported by this GSR IDIQ multiple award contract (MAC)*:

7.2.1. Dry Cargo/Ammunition Ships (T-AKE)

7.2.2. Fast Combat Support Ships (T-AOE)

7.2.3. Fleet Replenishment Oilers (T-AO)

7.2.4. Cable Laying/Repair Ship (T-ARC)

7.2.5. Fleet Ocean Tugs (T-ATF)

7.2.6. Hospital Ships (T-AH)

7.2.7. Rescue and Salvage Ships (T-ARS)

7.2.8. Expeditionary Fast Transport (T-EPF)

7.2.9. Afloat Forward Staging Base (AFSB)

7.2.10. Submarine Tenders (AS)

7.2.11. Missile Range Instrumentation Ships (T-AGM)

7.2.12. Expeditionary Mobile Base (T-ESB)

7.2.13. Expeditionary Transfer Dock (T-ESD)

*listing subject to change as MSC adds or removes classes and vessels from its inventory.

7.3. The Government reserves the right to undertake fulfillment of requirements by Government forces, other Contractors, and/or other contract vehicles for the same type or similar work as contracted for herein, as the Government deems necessary or desirable, and to do so shall not breach or otherwise violate this contract.

8.0 SECURITY

8.1. Contractor personnel supporting MSC ship repair requirements must possess a Defense Biometric Identification System (DBIDS) card with pier access noted on back of card.

8.2. DBIDS cards are required to access government facilities, piers, and MSC ships.

8.3. Prime contractors are responsible for ensuring all their own personnel - to include subcontractors, possess DBIDS cards.

8.4. Prime contractors are responsible for their own contractor personnel – to include subcontractors, who do not meet DBIDS requirements for accessing Government installations, piers, and ships.

9.0 CERTIFICATES & PERMITS

9.1. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The contractor shall also be responsible for all damages to persons or property that occurs as a result of the contractor’s fault or negligence.

9.2. Naval Region Southwest (NRSW) requires collection of data related to coating work (painting) done on vessels in the San Diego area. In the event painting is performed during the performance of this contract, contractors will provide the responsible Port Engineer with the information required to comply with this reporting requirement (e.g., name of vessel, location, scope of work).

9.2.1. Collection of data related to paint used during the performance of work may be required wherever MSC ships are repaired.

10.0 WORK HOURS

10.1. Contractor personnel expected to work full eight-hour days during POP, notwithstanding required overtime and premium time.

10.2. Work hours aboard ship will be established with Ship’s Force and the MSCREP.

10.3. Contractor is responsible for scheduling of personnel to complete all work within awarded POP.

10.4. Performance of work commences IAW the awarded DO’s terms and conditions. Only the

Contracting Officer may grant exceptions or changes via written authorization.

10.5. Work time will commence when contractor personnel arrive at the repair location (i.e. aboard ship, in respective shop), and will cease when Contractor personnel depart from the ship or shop.

10.5.1. Transit time to and from the performance location, including delays for base and pier access, is the responsibility of the Contractor and are not considered a reasonable cause in delay of performance.

11.0 HAZARDOUS MATERIALS

11.1. Contractor is required to handle and dispose of hazardous materials in accordance with all local, state, and federal regulations.

11.2. Ship repair requires the use of non-asbestos parts and materials. If parts and materials that contain asbestos are inadvertently specified in a referenced drawing, parts list, or work item, the contractor is responsible for alerting the MSCREP and Contracting Officer of the situation and recommending an equivalent non-asbestos substitute.

12.0 ASBESTOS REMOVAL REQUIREMENTS

12.1. During the performance of this contract, the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos containing products. This section applies to each instance of asbestos removal or disturbance.

12.2. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58, 40 CFR Part 61, and all other applicable local, state, and federal regulations. The contractor shall forward a copy of all required notices, licenses, and permits to the Contracting Officer immediately upon issuance or receipt.

12.3. The latest change to local, state, and federal regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 fibers per cubic centimeter (f/cc) of air).

12.4. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

12.5. After removal or disturbance is complete, the areas within the removal boundary shall not be released for occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

12.6. In all respects, the performance of air sampling and analysis shall be performed in accordance with the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

12.6.1. Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four hours.

12.6.2. In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

12.6.3. Air sampling shall be performed by a person competent in sampling procedures and overseen by an industrial hygienist certified for comprehensive practice (CIH) by the American Board of Industrial Hygiene.

12.6.4. Laboratory analysis of samples shall be performed by a participant in the American

Industrial Hygiene Association (AIHA) Proficiency in Analytical Testing (PAT) Program rated proficient for asbestos and air.

12.7. Personal sampling shall be conducted using breathing zone air samples, which are representative of the 8-hour Time-Weighted Average (TWA) exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

12.8. The contractor agrees to indemnify MSC for any fines assessed by local, state, and federal agencies, for the contractor’s failure to properly follow applicable regulations.

12.9. The contractor shall insert this section in all subcontracts entered into under this contract.

13.0 PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES

13.1. Policy. In compliance with Executive Order Number 12088, the policy of the DON is to confirm to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq), insofar as these Acts prohibited the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these acts pertain specifically to the Naval vessel and shore activities. Contractors shall implement that policy with respect to the ship(s) undergoing repair and overhaul under this contract.

13.2. Definitions. For the purpose of this section, the terms “oil,” “oily mixtures”, “hazardous substances”, and “discharge” shall have the meanings as defined in the Acts referred to in paragraph 20.1 and other environmental statutes.

13.3. Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the

MSCREP by demonstrations, completed test memoranda, or other means reasonably acceptable to the Contracting Officer that all equipment, the functions of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship are fully operable.

13.4. Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substances from the ship, immediately notify the MSC Representative and immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the Contracting Officer the “oil or Hazardous Substance Discharge Report.”

13.5. Liability. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substances, except that the contractor shall be liable to the Government for all such costs of removal where such discharge was the result of willful negligence or willful misconduct within the control and knowledge of the contractor.

14.0 DELIVERY ORDER CANCELLATION

14.1. Delivery Orders (DO) may be terminated in accordance with FAR clauses 52.249-2 or 52.249-8 and DFARs clause 252.217-7009 incorporated by reference in this contract.

15.0 REPORTS

15.1. Contractor furnished information includes, but is not limited to, the following:

15.1.1. Project Planning. Provides the Contractor’s planned sequence of work. This can be used during the solicitation phase to evaluate the technical competency of the Contractor’s offer. It can also be used during execution to determine the Contractor’s adherence to the schedule during the POP.

15.1.2. Condition Found Report (CFR). Notifies the Government of problems encountered during WI performance to include material conditions and recommendations for additional repairs. CFRs serve as the basis for issuing change orders to address conditions and/or circumstances not anticipated by the awarded WI.

15.1.3. Work Completion Certificate. Certifies WI completion and adherence to all required certification requirements.

15.1.4. Marine Coating Usage (MCU) Report. Required when conducting painting operations.

MCU reports include NSN/NIIN number, manufacturer information, Volatile Organic Compound (VOC) concentration, amount applied, and date applied.

15.1.5. Shipboard Asbestos-Containing Material (ACM). Provides documentation demonstrating contractor compliance with requirements for controlling the shipboard handling and removal of ACM.

15.1.6. Byproduct Data. May include, but is not limited to, working, red-lined, and as-built drawings of installations. Unlimited data rights are required when the Contractor installs new equipment or makes alterations (i.e., “red-line” drawings that reflect actual installation on the ship).

15.1.7. Hazardous Material. Documentation confirming compliance with required local, state, and federal hazardous material handling and disposal requirements.

15.1.8. Hot Work Permits / Chits. Written notification submitted for each job or separate area of hot work (any heat or spark generating activity) aboard ship. Information required includes, but is not limited to, specific location of the hot work and compartments adjacent to decks, bulkheads and similar structure upon which work is to be accomplished; time hot work will commence; current gas free status of the areas, including a copy of the applicable Gas Free certificate; absence or existence of combustible material in the vicinity of the operation and if combustible material exists the action taken to protect material and equipment adjacent to the hot work area from damage and fire; and the provision and assignment of the fire watch, and affirmation that conditions at work site (ventilation, temporary lighting, and access) permit the fire watch to observe all areas where the hot work is being performed.

15.1.9. Gas Free Permits / Chits. Marine Chemist gas free certificates to certify spaces and systems as gas free safe for personnel entry and safe for hot work on the ship where work will be accomplished on a daily basis. Gas free certificates are required to be signed by a NFPA certified Marine Chemist prior to start of any confined space entry and/or hot work. Furnish a new gas free certificate, signed by a NFPA certified Marine Chemist daily thereafter for the duration of the particular work necessitating gas freeing of spaces safe for men and hot work.

15.2. When a DO includes “Not to Exceed” items for incidental supplies and services (i.e. freight), the supporting documentation must be provided to the Contracting Officer for DO definitization.

16.0 CONTRACTOR REPAIR FACILITY

16.1. Where a DO requires an awarded contractor to berth or dry dock an MSC vessel, repair facilities shall be equipped to support the full scope of work stated in the DO. Work performed at a contractor’s repair facility are subject to inspection and acceptance by ABS Surveyors, USCG Inspectors, MSC Safety Personnel, and the MSCREP.

16.2. Contractor repair facilities will allow access to Government employees and technical representatives as required in the performance of this contract.

16.3. Locations of Contractor Repair Facilities:

16.3.1. Lot A: San Diego, CA. Within 30 miles of Naval Base San Diego (NBSD). Address:

3455 Senn Rd, San Diego, CA 92136

16.3.2. Lot B: Bremerton, WA. Within 150 miles of Naval Base Kitsap Bremerton (NAVBASE Kitsap). Address: 120 Dewey St, Bremerton, WA 98314

16.3.3. Lot C: Seward, AK. Within 200 miles of Fourth of July Beach. Address: 3311 Sorrel

Rd, Seward, AK 99664

16.3.4. Lot D: Oahu, HI. Within 30 miles of Joint Base Pearl Harbor Hickam (JBPHH).

Address: 850 Ticonderoga St, Pearl Harbor, HI 96860

Note: A Lot denotes the center point of a geographic area where the Government intends to conduct ship repair.

16.4. Performance locations are subject to change and additional locations may be added due to mission requirements and pier availability at the discretion of the Contracting Officer.

17.0 PRIOR WRITTEN PERMISSION REQUIRED FOR SUBCONTRACTS

17.1. Use of subcontractors require Contracting Officer approval. Use of unapproved subcontractors is prohibited.

17.2. Subcontractors will be listed by WI.

18.0 CONTRACTOR FURNISHED MATERIALS

18.1. Material costs for items required under the DO’s SOW will be listed separately in the proposal, and the Contractor will include supporting documents such as vendor quotes, catalog cut sheets, etc. to substantiate these costs.

18.2. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded man-hour rate and not separately priced.

18.3. Other Direct Cost (ODC) Mark-Up Rate: ODC mark-up rates apply to materials to be provided as part of the repair. The mark-up will be applied to the actual cost of the material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost. This mark-up rate may also be utilized for Other Direct Costs not elsewhere provided, such as subcontracting. Ceiling mark-up rates shall be incorporated into each DO.

19.0 CONTRACTOR FURNISHED EQUIPMENT

19.1. Contractor is responsible for providing all LP, Power, and other equipment required to support requirements under this contract.

19.2. Unless authorized in writing by the responsible Contracting Officer, Contractors are required to provide cranes and associated equipment (e.g. spreader bars, straps) to support work awarded under this contract.

20.0 SHIP REPAIR LABOR RATE

20.1. The Contractor’s fully burdened labor rate (FBLR) will be determined at the DO level and will be utilized to address growth and new work requirements. The Contractor agrees the number of man-hours included in its price proposal for each DO shall include only direct production man-hours.

For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blasting Boiler-making Brazing Burning Carpentry Diesel Mechanics Electrical Work Fire Watch General Labor Lagging Machinists (inside and outside) Painting Pipefitting Rigging Sheet-metal Work Ship-fitting Staging/scaffolding

20.2. Project planning, scoping, management & supervision, quality assurance, and other administrative requirements are to be included in the Contractor’s man-hour rate incorporated into each DO award.

20.3. Direct production man-hours will incorporate those functions (whether charged directly or indirectly by the Contractor’s accounting system) which are herein defined as support for production functions. These support functions are therefore considered to be included in the Contractor’s fully burdened rate for direct production man-hours. Examples of support functions include:

Testing

Planning and scoping Material handling and warehousing Surveying Transportation Lofting Management Supervision Quality assurance Cleaning (tank cleaning excepted) Security Administration Purchasing staff Other indirect support

20.4. Production function support shall include accounting for the cost of temporary restroom facilities for contractor personnel (prime and subcontractor) at each repair site. Unless otherwise advised in individual RFO packages, contractor personnel will not use the restroom facilities aboard MSC vessels.

20.4.1. Material/Other Direct costs will not be included in the direct production man-hour rate.

21.0 CONTRACTOR IDENTIFICATION

21.1. Contractor personnel working aboard Government property will wear company identification badges. Said badges will clearly identify the ship repair company and contain a photograph of the badge owner.

21.2. Contractor personnel, and their subcontractors, must identify themselves as Contractors during meetings, telephone conversations, in electronic messages, or correspondence related to this Contract.

22.0 PAPERLESS CONTRACT ADMINISTRATION

22.1. MSC utilizes the Microsoft Office suite of applications (i.e. Word, Excel, and Power Point) and

Adobe Acrobat to conduct contract administration. Contractors are required to utilize current versions the same.

22.2. Email is the primary method used to conduct ship repair administration.

22.3. The Government may utilize other platforms (e.g. DOD SAFE) to conduct contract administration and transmit large & multiple files due to email size constraints. DOD Safe is utilized to transmit files that exceed email size constraints, as well as documentation that contains personally identifiable information (PII).

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984 252.217-7005 Inspection and Manner of Doing Work JUL 2009 252.217-7006 Title DEC 1991 252.217-7013 Guarantees DEC 1991

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 15-JAN-2025 TO

14-JAN-2030

N/A N/A

0002 POP 15-JAN-2030 TO

14-JUL-2030

N/A N/A

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination JAN 1991

CLAUSES INCORPORATED BY FULL TEXT

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of (to be noted in respective Delivery Order) per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

(End of clause)

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

NOT APPLICABLE

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2-in-1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table

Field Name in WAWF Data to be entered in WAWF Contract Number (No Dashes) TBD

Vendor CAGE Code TBD Pay Official DoDAAC N50082

Issue Date TBD Issue By DoDAAC N40443

Admin DoDAAC N40443 Inspect By DoDAAC N62387 Ship To Code N62387

Ship From Code Leave Blank Mark For Code Leave Blank

Service Approver (DoDAAC) N62387 Service Acceptor (DoDAAC)) N62387

Accept at Other DoDAAC) Leave Blank

LPO DoDAAC N62387 DCAA Auditor DoDAAC Leave Blank

Other DoDAAC(s) Leave Blank

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

NOT APPLICABLE

(i) Contact the WAWF helpdesk at 866-618-5988 for assistance.

(2) MSC POC for confirming receipt of goods or completion of work for this contracting action is as follows:

TBD at time of Delivery Order issue.

SHIP & BASE ACCESS (DEC 2017)

Base/Repair Facility Access: Permit is required to access Navy facilities. Base/Repair Facility Access Request is desired seven days prior to ship check or performance start date. Submit forms per the document instruction and to the Port Engineer.

Defense Biometric Identification System (DBIDS) is being implemented for access to DoD facilities in CONUS, HI, Guam and Puerto Rico (replaces RapidGate). Vendor is responsible to acquire DBIDS credentials prior to performance start date. Delays that may result from inadequate planning are contractor responsibility. Vendor instructions and program information is available at https://www.cnic.navy.mil/om/dbids.html. DBIDS credentials require (in succession) (1) Present a letter or official document from the Government sponsoring organization that provides the purpose for your access, (2) Present valid identification, such as a passport or Real ID Act-compliant state driver's license, (3) Present a completed copy of the SECNAV 5512/1 form to obtain your background check,

(4) Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments, and

(5) After all of this is done, the contractor will be provided with the DBDIS credential. For vendors with existing Navy Commercial Access Control System (NCACS) cards, see https://www.cnic.navy.mil/om/dbids.html for instructions to obtain DBIDS credentials. Vendor is responsible to confirm that each employee held DBIDS credentials are active for the specific facility and performance period in accordance with DBIDS.

Additional access permissions may be required in the future.

Vehicle Access: Required for vehicle access to Navy facilities. Follow supplemental instructions on Base Access forms or base-specific vehicle access forms.

Ship Access List (Vendor-Provided): On company letterhead attachment via email, the vendor is required to provide the ship master (courtesy copy the Port Engineer) with an accurate, current list of performing personnel prior to being admitted aboard the vessel. Under no circumstances will a hand-delivered list be accepted.

T-AKE email address: MASTER@AKE#.NAVY.MIL (example: master@ake8.navy.mil, where “8” is the hull number).

All other hulls address: MASTER.SHIPNAME@MSC.NAVY.MIL (example: master.sioux@msc.navy.mil).

(End of Text)

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions)

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

(a) ORDERS IN EXCESS OF THE MICRO PURCHASE THRESHOLD (MPT). The following procedures and criteria will be utilized:

(1) GSR IDIQ MAC holders will be notified of ship repair requirements in writing through the issuance of a Request for Order (RFO). The RFO will provide the following information:

(i) Submission timelines including:

a. Ship check information (if offered)

b. Question submission due date

c. Due date and time that RFO submission must be received in the email account of the designated contracting POC(s).

(ii) SOW for each WI;

(iii) Applicable references, manuals, drawings, etc.

(iv) Required POP

(v) Lowest Price Technically Acceptable (LPTA) Proposal evaluation factors (technical, past performance, and price)

(vi) Confirmation of DO contract type (FFP)

(vii) RFO submission instructions; and

(viii) RFO submission content instructions

(2) RFO submissions will establish labor rates and markup ceilings rates at the DO level and for growth and new work.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .