Exhibit 1 - Patch Log.pdf
PDF 47 KB Posted
- Solicitation number
- RFP 591 260000002450 1
- Issued by
- Genesee County, Michigan
About this file
This is a Patch Log Exhibit for a road resurfacing and patching project involving mill and resurface work and skip patching operations. The project encompasses work on a mainline corridor from Saginaw to Maple, as well as sections on M-54 between Maple and Saginaw. The scope includes 2-inch mill and resurface work totaling 34,000 linear feet with a width of 3,740 feet, yielding 4,095 square yards of material. Additionally, 4-inch skip patching is specified at multiple locations including areas north of Saginaw Street, southbound and northbound right lanes near Maple, sections between Maple and Bristol, and right lanes at Bristol. The 4-inch patching work totals 1,355 linear feet across various segments, with quantities ranging from 50 to 1,850 linear feet depending on location and lane designation.
The total project requires 5,095 square yards of material with a 10-percent contingency bringing the total to 5,605 square yards. The patch log details specific segments with corresponding measurements in linear feet, width in feet, square yards, and tonnage requirements, with the largest single segment being the southbound right lane south of Maple at 1,850 linear feet requiring 2,467 square yards and 543 tons of material. This exhibit serves as the detailed breakdown of work quantities and locations necessary for bidders to develop accurate cost proposals and project scheduling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 260000002450 - M-54 joint & crack repair.docx | DOCX document | |
| Exhibit 2 - Special Provision for Maintaining Traffic.pdf | ||
| Schedule B - Pricing.xlsx | XLSX spreadsheet | |
| Attachment A - Prevailing Wage Information & Rates for Genesee County.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2" Mill & Resurface
Location Length Width SYD Tons
Mainline, Saginaw to Maple, 2 inch 34000 3740
4" Skip Patching
1100' N of Saginaw St, 4 inch 120 12 160 35
150 12 200 44
90 12 120 26
SB R Lane South of Maple 1850 12 2467 543
SB R Lane ~250' North of Maple 0 0
NB R Lane ~250' South of Maple 50 12 67 15
Between Maple and Bristol (Old Railroad) 180 44 880 194
NB R Lane ~150'- 410' South of Maple 260 12 347 76
SB Right Lane at Bristol 480 36 1920 422
Total 4" 1355
TOTALS 40160 5095
Total with 10% Contingency 5605
M-54, Maple to Saginaw
EXHIBT 1 - Patch Log
Sheet1
File details come from the government source that posted it. Updated .