Exhibit_1_Maps.pdf
PDF 6 MB Posted
- Attached to
- Gunnison Site Preparation Federal contract opportunity
- Solicitation number
- 1284LM21Q0049
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1449 Solicitation Site Prep.pdf | ||
| Exhibit_3_Road_Schematic_Plates.pdf | ||
| Exhibit_2_Photo Examples.docx | DOCX document | |
| Exhibit_4_Wage_Determination_03032021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021 Gunnison Site Preparation
Project Area
US Hwy 50 To Montrose
Gunnison
Lake City
US Hwy 50
Colo Hwy 114 Colo Hwy 149
CR 27
KK-14
NN-14
NN-14
794.2B
Map 1 Vicinity Map
2021 Gunnison Site Preparation
³ 0 5 102.5
Miles
A.L.H. 4/2/2021
") City
County Roads Main Highways
National Forest Project Area
Main Forest Roads
B91
B22
B92
Map 2 2021 Site Prep Cathedral Area
Groundhog Park
FR 790
FR 790
FR 865
Gate
Gate
³ 0 1,000 2,000500
Feet A.L.H. 4/2/2021
Based Image Is 2019 NAIP
7 Piles
10 Piles
16 Piles
19 Piles 17 Unconfirmed Piles
Road Status
Not Used Open
\\\Uncertain
2021 Treatment Units Open MVUM Road
Gated Road System Closed By Loggers
# Unconfirmed Ash Pits Bid Item 1 Ash Pits
Map 3 2021 Site Prep
Willow Mesa Area
Willow Park
FR 790
FR 790.1B
FR 692
FR 674
Gate
³ 0 1,000 2,000500
Feet A.L.H. 4/2/2021
Based Image Is 2019 NAIP
6 Piles
4 Piles
6 Piles
14 Piles
6 Piles
28 Piles 10 Unconfirmed Piles
Road Status
Not Used Open
\\\Uncertain
2021 Treatment Units Open MVUM Road
Gated Road System Closed By Loggers
# Unconfirmed Ash Pits Bid Item 1 Ash Pits
M ap
S ite P re p
C oo le r S al va ge A re a
W ill ow P ar k
FR
FR
.1
M
FR
.1
D
FR
G at e
³
1, 2, Fe et
A .L
.H
/2
/2
B as ed
Im ag e Is
N
A
IP
Pi le s
P ile s
Pi le s
Pi le s
P ile s
B ig
M ea do w s
Si ng le P ile
R oa d St at us
N ot
U se d O pe n
U nc er ta in
T re at m en t U ni ts
O pe n M
VU
M
R oa d
G at ed R oa d
Sy st em C lo se d By
L og ge rs
U nc on fir m ed A sh P its Bi d Ite m
A sh
P its
5 00
M ap
S ite P re p
B ig
M ea do w s A re a
FR
FR
FR
.2
B
FR
G at e
³
1, 2, Fe et
A .L
.H
/2
/2
B as ed
Im ag e Is
N
A
IP
P ile s
U pp er E nd S pu rs
Pi le s
P ile s
Pi le s
P ile s
B ig
M ea do w s
P ile s
R oa d St at us
N ot
U se d O pe n
U nc er ta in
T re at m en t U ni ts
O pe n M
VU
M
R oa d
G at ed R oa d
Sy st em C lo se d By
L og ge rs
U nc on fir m ed A sh P its Bi d Ite m
A sh
P its
FR
.2
B
Pi le s
P ile s
N ea r R oa d
Pi le s
A lo ng
Pi le s
Pi le s
FR
.1
A
Pi le s
G at e
Pi le s
U nc on fir m ed
P ile s
041 Map 6 2021 Site Prep
Nutras Salvage Area
FR 794
FR 827
FR 794.2B
FR 794.2H
Gate
³ 0 1,000 2,000500
Feet A.L.H. 4/2/2021
Based Image Is 2019 NAIP
Gate
Chavez Creek
Road Status
Not Used Open
\\\Uncertain
2021 Treatment Units Open MVUM Road
Gated Road System Closed By Loggers
# Unconfirmed Ash Pits Bid Item 1 Ash Pits
FR 794.2C
3 Piles
Nutras Creek
FR 794.2D
10 Piles
13 Piles 1 Unconfirmed Pile
B20
Map 7 2021 Site Prep
Still-Beetle Area
FR 790
³ 0 800 1,600400
Feet A.L.H. 4/2/2021
Based Image Is 2019 NAIP
Campsite At Top Of Grade
Road Status
Not Used Open
\\\Uncertain
2021 Treatment Units Open MVUM Road
Gated Road System Closed By Loggers
# Unconfirmed Ash Pits Bid Item 1 Ash Pits
FR 790
5 Piles
5 Unconfirmed Piles
File details come from the government source that posted it. Updated .