Exhibit 1 Gomez Peak PavingSOW.pdf

PDF 1 MB Posted

Attached to
Amended Gila National Forest Gomez Peak Paving
Solicitation number
127EAX24Q0042
Issued by

About this file

This document is a Statement of Work (SOW) for the Gomez Peak Paving project in the Gila National Forest, Silver City District, New Mexico. The SOW describes the requirement to resurface the existing 19,288 square foot paved driveway and parking area at the Gomez Peak location. The work includes all necessary preparatory tasks, materials, labor, and equipment to provide a durable, smooth driving surface that meets AASHTO standards.

The contractor is expected to be available to perform the field work within 7 days of the Notice to Proceed and complete all work within 15 calendar days. A pre-bid meeting will not be offered, but contractors are encouraged to visit the site and coordinate any questions during the solicitation period. The SOW identifies the Government's Contracting Officer's Representative and Project Inspector as the primary points of contact for the contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Gomez Peak Paving Silver City District

Gila National Forest

Project Scope: Work for Gomez Peak Paving shall include all prep work, cleaning, mobilization, labor, tools and equipment to re-surface the existing paved Gomez Peak driveway and parking area. Area is approximately 19,288 square feet.

Background: After years of use, pavement is in need of new over-layment to extend life.

Locations: Gomez Park is located up Little Walnut Highway, approximately 5 miles north of intersection of State Hwy 180 in Silver City, NM. 32d50'56.22” N -108d16'37.90" W

Gomez Peak Area

State Hwy

Silver City

TASKS

The (Contractor) shall provide all labor, materials, tools, equipment, services, testing, supervision and incidentals necessary to perform the work as described:

ASPHALT PAVING: Work shall include all cleaning and preparatory work in order to place an asphalt over layment over the existing Gomez Peak road / parking area. Total area is approximately 19,288 square feet. Contractor shall provide all materials, oils, aggregate, etc to provide for a durable smooth

Silver City

Little Walnut Road

Gomez Peak Area

Hwy 180

Little Walnut Road

Gomez Peak Area driving surface which meets all current AASHTO standards for road surfacing. Materials shall be a fines mix with hot asphalt. Upon completion, contractor shall ensure area is clean and driving surface is both smooth and aesthetically pleasing. Measures shall be taken to mitigate any environmental spills or issues.

PRE-BID AND PRE-WORK MEETING

A pre-bid meeting will not be offered. Interested contractors are encouraged to visit the site and research site locations on Google Earth™ or similar mapping applications to fully understand logistics and travel time to and from all sites. Contractor is also encouraged to visit the site to make any detailed measurements and familiarize with existing conditions. Any questions about the location and or logistics can be asked during the solicitation period.

CONTRACT TIME

Contractor will be expected to be available to perform field work within 7 days of Notice to Proceed.

This project requires the Contractor to finish all field work within 15 calendar days after commencing field work. Contractor shall procure all necessary construction items prior to commencing site work to minimize disruption to service.

All requirements and deliverables within the statement of work shall be completed within 15 calendar days of Notice to Proceed.

CONTACTS

The Contractor shall submit and/or coordinate all deliverables to the following Government representatives.

The Contractor shall contact the OSC/Project Inspector prior to commencing the project and also to schedule/coordinate pre-work site visits and field work.

OSC/Project Inspector (PI):

TBD

Title Gila National Forest Address Direct Phone # Email:

Contracting Officer’s Representative:

Harley Allsup Title: Facilities / Project Engineer Gila National Forest Address: 3005 E. Camino del Bosque, Silver City, NM

Direct Phone # 520-404-3728 Email: hallsup@fs.fed.us

File details come from the government source that posted it. Updated .