Exh B - Program of Requirements (POR) 05.24.23.pdf

PDF 736 KB Posted

Attached to
Request for Lease Proposals (RLP) 3CT0118 - Norwalk, Connecticut
Solicitation number
3CT0118
Issued by

About this file

This document contains a Program of Requirements (POR) for a Request for Lease Proposals (RLP) solicitation by the General Services Administration Public Buildings Service Central Office. The POR outlines space allocation and staffing requirements for a new leased facility in Norwalk, Connecticut to house the Consular Affairs/Passport and Citizenship division. Key requirements include over 22,000 square feet of usable office and support space, 83 staff positions, conference rooms, storage areas, public and staff amenities. The solicitation number is 3CT0118 with an initial offer due date of February 2, 2024. The POR provides a breakdown of necessary space by division including over 6,000 square feet for primary office space and 12,000 square feet for support areas. It specifies relevant details such as room sizes, quantities, and intended uses.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRAM OF REQUIREMENTS (POR): CA/PPT POR SUMMARY AND SPACE ALLOCATION

Space Type Legend:

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

Is this a GSA federal building? No Is this a leased building? Yes

MANAGEMENT (M) SERIES - STAFF SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

1 M.1 PO-1 Director 230 0 1 230 1 P

2 M.2 PO-1 Assistant Director 180 0 1 180 1 P

3 M.3 WS-2 Administrative Assistant 64 0 2 128 2 P

(Future) (Insert Title) 0 0 0 0 0

(Insert Space

Type)

Management Staff Space Subtotal 4 538 4

MANAGEMENT (M) SERIES - SUPPORT SPACE

Square Override Space Total Staff

Feet Count USF Count

4 M.4 Reception Seating 100 0 1 100 0 S

5 M.5 Meeting Room 250 0 1 250 0 C

6 M.6 Visitor's Office 120 0 1 120 0 P

7 M.7 Equipment File Room 130 0 1 130 0 S

8 M.8 Coat Closet 8 0 1 8 0 S

9 M.9 Management Entrance 0 0 0 0 0 P

0 0 0 0 0

(Insert Space

Type)

Management Support Space Subtotal 5 608 0

Space TitleFurn Tag

Space Title Item

No.

Space Tag

12 September, 2022

Item

No.

Room Data

Sheet

Date of Input:

CA/PPT/CT Relocation

Space Type

(Insert Description)

Project Team Notes

Project Team Notes

RLP Exhibit B

LESSOR______ / GOVERNMENT______

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

ADJUDICATION (A) SERIES - STAFF SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

1 A.1 PO-2 Adjudication Manager 130 0 1 130 1 P

2 A.2 PO-3 Adjudication Supervisor (Supervisory Passport Specialist) 120 0 5 600 5 P

3 A.3 WS-1 Adjudicator (Passport Specialist) 36 0 30 1080 30 P 23 Current, 24 Near-Term

4 A.7 PO-2 Fraud Program Manager 130 0 1 130 1 P

5 A.8 WS-4 Fraud Program Support Specialist 36 0 3 108 2 P

6 A.10 PO-2 Customer Service Manager 130 0 1 130 1 P

7 A.11 WS-8 Customer Service Support Specialist 40 0 9 360 8 P Includes Communications and CS

8 A.14 WS-4 Administrative Officer 54 0 1 54 1 P Place in Management or Fraud

9 A.15 WS-4 Intern 36 0 1 36 1 P

(Future) (Insert Title) 0 0 0 0 0

(Insert Space

Type)

Adjudication Staff Space Subtotal 52 2628 50

ADJUDICATION (A) SERIES - SUPPORT SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

11 A.4 Team Meeting Room 150 0 3 450 0 C

12 A.5 Batch Box Storage (per adjudicator) 5 7 30 210 0 ST

13 A.9 45 50 3 150 0 S

14 A.12 45 50 9 450 0 S Includes Communications and Customer Service

15 A.6 15 0 30 450 0 S

16 A.13 0 0 0 0 0

(Insert Space

Type)

Adjudication Support Space Subtotal 75 1710 0

Customer Service File and Equipment Area (per person)

Item

No.

Space Tag

Room Data

Sheet

Space Title Item

No.

Furn Tag

Adjudication File and Cart Area (per adjudicator)

Fraud Program Management File and Equipment Area (per person)

Keep Open for Future Use (Insert Description)

Space Title

Project Team Notes

Project Team Notes

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

PROCESSING (PR) SERIES - STAFF SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

1 PR.1 PO-3 Processing Supervisor/Assistant/Team Room 120 0 1 120 1 P

2 PR.2 WS-6 Assistant Processing Supervisor 36 0 3 108 3 P

3 PR.3 WS-6 Incoming Applications Staff 36 0 6 216 0 P

4 PR.4 WS-9 Mail Out Staff 48 0 5 240 5 P

(Future) (Insert Title) 0 0 0 0 0

(Insert Space

Type)

Processing Staff Space Subtotal 15 684 9

PROCESSING (PR) SERIES - SUPPORT SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

5 PR.5 250 0 1 250 3 P

6 PR.3a 45 0 6 270 0 S

7 PR.3b 36 0 4 144 0 S

8 PR.3c 120 0 1 120 0 S

9 PR.4a 36 0 5 180 0 S

10 PR.6 150 0 1 150 0 ST

11 PR.7 150 0 3 450 0 P

12 PR.8 200 0 1 200 0 ST

13 PR.9 160 0 1 160 0 S

14 PR.10 4 0 38 152 0 ST

0 0 0 0 0

(Insert Space

Type)

Processing Support Space Subtotal 61 2076 3

Item

No.

Furn Tag

Book Print Room (per book printer and card printer)

Contractor Lockers (per locker)

Scanning and Applications Batch Sorting Area (per table)

Room Data

Sheet

Item

No.

Cashier Office

(Insert Description)

Postage Machine Mail Room

Accession Storage

Book Storage

Space Title

Scanner

Incoming Applications File and Equipment Area (per workstation)

Mail Out File and Equipment Area (per workstation)

Space Tag Space Title Project Team Notes

Project Team Notes

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

PUBLIC (P) SERIES - STAFF SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

1 P.1 PO-4 Uniformed Protective Officer (UPO) Lead 150 0 1 150 1 P

2 P.2 WS-13 Counter Supervisor 96 0 2 192 1 P

3 P.10 WS-11 Uniformed Protective Officer (UPO) 48 0 9 432 9 P

(Future) (Insert Title) 0 0 0 0 0

(Insert Space

Type)

Public Staff Space Subtotal 12 774 11

PUBLIC (P) SERIES - SUPPORT SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

4 P.3 15 0 200 3000 0 S

5 P.4 7 0 150 1050 0 S

6 P.5 150 0 1 150 0 S

7 P.5a 150 0 1 150 0 S

8 P.5b 20 0 3 60 0 S

9 P.6 20 0 24 480 0 S

10 P.7 450 0 1 450 0 S

11 P.8 7 0 150 1050 0 S

12 P.9 Transaction Counter (per counter) 90 0 24 2160 0 S

13 P.11 Interview Room 120 0 1 120 0 S

14 P.12 UPO Men's Locker Room (per locker) 10 0 8 80 0 P

15 P.13 UPO Women's Locker Room (per locker) 30 0 2 60 0 P

16 P.14 150 0 1 150 0 S

17 P.15 150 0 1 150 0 S

18 P.16 Secure Public Exit 60 0 1 60 0 S

19 P.17 Privacy Room 60 0 1 60 0 S

(Insert Description) 0 0 0 0 0

(Insert Space

Type)

Public Support Space Subtotal 569 9230 0

Item

No.

Room Data

Sheet Furn Tag Space Title

Space Title Item

No.

Public Reception Area: Freestanding Information Writing Counter

Public Reception Area: Kiosks (per kiosk)

Space Tag

Public Screening Queuing Area (For Leased Buildings Only) (per person)

Public Screening Equipment Area (For Leased Buildings Only)

Public Reception Area: Women's Restroom (if Base Building Restrooms are not available)

Public Reception Area: Public Seating (per chair)

Public Reception Area: Queuing for Check-In Counter (per person)

Public Reception Area: Information Writing Counter

Public Reception Area: Applicant at Transaction Counter (per transaction counter)

Public Reception Area: Men's Restroom (if Base Building Restrooms are not available)

Project Team Notes

Project Team Notes

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

SHARED RESOURCES (SR) SERIES - STAFF SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

1 SR.1 PO-2 Headquarters (HQ) Senior Officer (Hoteling Office) 120 0 1 120 1 P

2 SR.2 PO-2 Branch Chief - Career Management Division (Hoteling Office) 0 0 0 0 0 P

3 SR.3 WS-4 Equipment Repair Technician 36 0 1 36 1 P

4 SR.4 PO-3/WS-6 Systems Administrator 156 0 2 312 2 P

5 SR.5 PO-3 Systems Security Officer (ISSO) (Hoteling Office) 0 0 0 0 0 P

6 SR.6 PO-2 Hoteling Office 120 0 1 120 0 P

7 SR.20 WS-4 Hoteling Workstation 36 0 1 36 1 P

8 SR.21 WS-4 Headquarters (HQ) Analyst (Hoteling Workstation) 36 0 0 0 0 P

9 SR.22 WS-4

Regional Training Coordinator (RTC) - Career Management Division

(Hoteling Workstation) 36 0 1 36 1 P

(Future) (Insert Title) 0 0 0 0 0

(Insert Space

Type)

Shared Resources Staff Space Subtotal 7 660 6

SHARED RESOURCES (SR) SERIES - SUPPORT SPACE

Square Override Space Total Staff Space

Feet Count USF Count Type

10 SR.7 Cell Phone Lockers 12 0 2 24 0 ST

11 SR.8 Communications Equipment Room (CER) 200 0 1 200 0 S

12 SR.9 Diplomatic Security (DS) Hub Room 140 0 1 140 0 S

13 SR.10 Staff Restroom (Men's) 160 0 1 160 0 S

14 SR.11 Staff Restroom (Women's) 160 0 1 160 0 S

15 SR.12 Training Room (per 2 person training table) 70 0 15 1050 0 C

16 SR.13 General Storage 800 0 1 800 0 ST

17 SR.14 Lactation Room 60 0 1 60 0 S

18 SR.15 Break Room (per chair) 25 0 30 750 0 S

19 SR.16 Staff Entry 0 0 0 0 0 P

20 SR.17 Staff Coat Hooks (per staff) 0.5 0 40 20 0 ST

21 SR.18 Equipment Area 100 0 0 0 0 S

22 SR.23 60 0 1 0 0 P

23 SR.24 64 0 0 0 0 P

24 SR.19 Base Building Mechanical/Electrical/Telecom Room/Restrooms (not shown) 0 0 0 0 0 S

0 0 0 0 0

(Insert Space

Type)

Shared Resources Support Space Subtotal 94 3364 0

Item

No.

Space Tag

Room Data

Sheet Furn Tag

Space Title

Badging

(Insert Description)

Recycling Areas

Space Title Item

No.

Project Team Notes

Project Team Notes

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

AREA SUMMARY (Total Staff and Shared Support Spaces)

Sub-Total Usable Square Footage (P = Primary Office Space) 6,244

Sub-Total Usable Square Footage (S = Office Support Area) + 12,722

Sub-Total Usable Square Footage (ST = General Storage) + 1,556

Sub-Total Usable Square Footage (C = Conference & Training) + 1,750

Sub-Total of Unselected Space Type (Insert Space Type) This row should be zero if all Space Type designations are assigned + 0

Sub-Total Usable Square Footage (Total Staff and Shared Support Spaces) 22,272

1.33 (Circulation is 24.81% of the Usable Space) + 7,350

Building Factor (add factor as a fraction). Ex: 0.02 0 + 0

Total Usable Square Footage (Total Staff and Shared Support Spaces, Circulation Factor, Building Factor ) 29,622

AREA AND STAFF COUNT SUMMARY (P = Primary Office Space)

Total Staff Count 83

Sub-Total Usable Square Footage (P = Primary Office Space) 6,244

1.33 (Circulation is 24.81% of the Usable Space) + 2,061

Building Factor (add factor as a fraction). Ex: 0.02 0 + 0

Total Usable Square Footage (Primary Office Space, Circulation Factor, Building Factor) 8,305

UTILIZATION RATE

Usable Square Feet per Person (P = Primary Office Space) only 8,305 ÷ 83= 100

ANTENNA

Does this project require an antenna? Yes No

PARKING

Does this project require PARKING Yes No

No. of Spaces

Surface

Structured with minimum clearance of 0'-0"

Unsecured

Secured

CA/PPT/I/MAC/WC Signature Date

Circulation Factor

Circulation Factor

Parking Type

Recoverable Signature

X Sarah F. Shaffer

Sarah Shaffer

Division Chief

Signed by: SARAH F SHAFFER

Project Code: P = Primary Office Space S = Office Support Area

ST = General Storage C = Conference & Training

Orange Text in Cells = Manual Input Required

12 September, 2022

Date of Input:

CA/PPT/CT Relocation

A/OPR/RPM Signature Date

File details come from the government source that posted it. Updated .