This document is an example budget for a fictitious EPA grant opportunity, the Columbia River Basin Restoration Funding Assistance Program: Science and Monitoring Competition (Solicitation Number: EPA-R10-OW-CRBRP-2024-01).
The example budget details a 6-year, $8.8 million project with $6.6 million in EPA funding and a $2.2 million cost share from the applicant. Key budget categories include personnel, fringe benefits, travel, supplies, contractual services, and subawards for pesticide reduction actions. The budget utilizes a 10% indirect cost rate. The grant is funded through the EPA's Geographic Programs - Columbia River Basin Restoration (CRBR) Program (CFDA 66.962), which supports ecosystem protection and restoration activities in the Columbia River Basin. The grant aims to improve understanding of toxics and their effects on water quality through monitoring projects in three priority areas.
Budget Example
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Example Budget Table
This fictitious sample budget detail/narrative is based on a hypothetical EPA assistance agreement supporting a pesticide reduction campaign and grant competition. The agreement requires a recipient cost share of 25% of total costs. This sample includes required budget information including an overall detailed budget table, budget narrative, and a detailed budget by year.
In this example the applicant is using the de minimus Indirect Cost Rate of 10%. If an applicant has an indirect cost rate they should attach its negotiated indirect cost rate agreement. For more information about indirect costs, refer to indirect cost policy, guidance, and training in
RAIN-2018-G02.
Please also reference the Interim General Budget Development Guidance for Applicants and Recipients of EPA Financial Assistance.
Budget Table Example
EPA Requested
Funding
Cost Share provided by applicant (25%) Total Personnel 1 Project Manager 1.0 FTE Full Time @ $92,501/year (6 years). $92,501 x 6 = $555,006 $277,503 $277,503 $555,006 1 Grant Administrator 0.5 FTE 50% Time @ $80,000/year (6 years). $80,000 x 6 x 0.5 = $240,000 $120,000 $120,000 $240,000 3 Scientists 3.0 Full Time FTE @ $100,033/year (6 years). $100,033 x 6 x 3 = $1,800,594 $900,297 $900,297 $1,800,594 2 Engineers 2.0 Full Time FTE @ $91,832/year (6 years). $91,832 x 6 x 2 = $1,101,984 $550,992 $550,992 $1,101,984 Total Personnel $1,848,792 $1,848,792 $3,697,584
Fringe Benefits Fringe rounded to nearest dollar ($3,697,584 x 36.7%) $1,357,013 $1,357,013 Total Fringe $1,357,013 $0 $1,357,013
Travel Lodging: $152/night x 18 nights x 3 staff = 8,208.
M&IE: $74 x 18 days x 3 staff = 3,996. Mileage: 925 mi/year @$0.655/mi x 6 years = $3,636 $15,840 $15,840 Total Travel $15,840 $0 $15,840
Equipment $0 None $0 https://www.epa.gov/grants/rain-2018-g02-r https://www.epa.gov/sites/default/files/2019-05/documents/applicant-budget-development-guidance.pdf https://www.epa.gov/sites/default/files/2019-05/documents/applicant-budget-development-guidance.pdf
Supplies Miscellaneous office supplies ($150/year x 6 years) $900 $900 Mailing supplies ($100/year x 6 years) $600 $600 Laptop computer (3 @ $1000) $3000 $3000 Monitoring supplies ($7500 total) $7500 $7500 Supplies Total $12,000 $0 $12,000
Contractual Lab Contract rate of $10,000 per year ($10,000 x 6 = 60,000) $60,000 $60,000 Total Contractual $60,000 $0 $60,000
Other Subawards for pesticide reduction competition, approximately $100,000 per award (100,000 x 30 = 3,000,000) $2,636,478 $363,522 $3,000,000 Other costs include communication services, software licenses, office lease and utilities, boat rental. See breakdown in narrative below. $201,360 $201,360 Total Other $2,837,838 $363,522 $3,201,360
Indirect Using Indirect Rate of 10% on salary and benefits ($3,697,584 + $1,357,013) x 10% $505,460 $505,460
Total Indirect $505,460 $0 $505,460
TOTAL FUNDING $6,636,943 $2,212,314 $8,849,257
EPA Requested
Funds Mandatory Cost
Share TOTAL COST
Sample Budget Narrative:
• Recipient cost share calculation (rounded to nearest dollar): $2,212,314 / $8,849,257 =
25%
• Personnel Costs: We will fund 1 Project Manager, 3 Scientists, and 2 Engineers at full time
FTEs per year of this program for a total of six years. We will fund 1 Grant Administrator at 50% of their FTE. Total salaries rounded to nearest dollar.
• Fringe Costs: Benefits are approximately 36.7% of salaries from agency standard based on FY23 actual costs. Includes Social Security, retirement, Medicare, workers compensation, and health insurance.
• Travel Costs: There is no international travel for this project. Travel consists of inspection visits, attendance at meetings and conferences, pollution prevention activities, and coordination with sub-recipients in the Portland Metro Area. This includes mileage, lodging and per diem as applicable for 3 staff. Travel budget is calculated at GSA standard rates and are charged when actual reimbursable expenses are incurred. Lodging estimated to be $152/night x 18 nights over 6 years x 3 staff = 8,208. MI&C at $74 x 18 days x 3 staff = 3,996. Mileage: 925 mi/year @$0.655 /mi x 6 years = $3,636. Total = $15,840
• Equipment Costs: There are no equipment costs for the proposed activities. Our equipment threshold is $5,000.
• Supply Costs: This includes miscellaneous office supplies such as paper, markers, hand sanitizer, etc. ($150 per year x 6 years = $900), mailing supplies such as poster paper and envelopes for fliers to promote subaward grant competition ($100 per year x 6 = $600), monitoring supplies such as sample bottles, bailers, pumps, etc. ($7500 based on previous monitoring project costs), 3 laptop computers (3 x $1000 = $3000).
• Contract Costs: Contracted laboratory services will include QAPP development for project implementation monitoring, and sampling to evaluate effectiveness of pesticide collection campaign. The estimated contract rate of $10,000 per year is based on previous similar contracts. ($10,000 x 6 = 60,000)
• Other Costs: This project will award approximately 30 small scale subawards which will support pesticide reduction actions. Subawards at approximately $100,000 per award (100,000 x 30 = 3,000,000). See our Project Narrative for how the subawards will be managed and awarded. Other costs include communication services (cell phone plan $1,300 x 6 years x 6 staff = $46,800), Wi-Fi $1200 x 6 years =$7,200), ArcGIS software ($350 x 3 laptops x 6 years = $6,300), Microsoft software ($150 x 3 laptops x 6 years= $2,700), office lease ($8,100 x 6 years = $48,600), utilities ($6,650 x 6 years = $39,900), boat rental for field sampling ($49,860). $46,800 + $7,200 + $6,300 + $2,700 + $48,600 + $39,900 + $49,860 = $201,360
• Indirect Cost Rate: We will the 10% de minimus for our Indirect Cost Rate.
[Applicant name] Detailed Budget by Year (Details provided in budget detail portion of project narrative)
Budget Categories Sept 2023 Sept 2024 Sept 2025 Sept 2026 Sept 2027 Sept 2028 Total
Personnel 616,264 616,264 616,264 616,264 616,264 616,264 $3,697,584 Fringe Benefits 226,169 226,169 226,169 226,169 226,169 226,168 $1,357,013
Travel 2,640 2,640 2,640 2,640 2,640 2,640 $15,840
Equipment $0
Supplies 2,000 2,000 2,000 2,000 2,000 2,000 $12,000
Construction $0
Contractual 0 12,000 12,000 12,000 12,000 12,000 $60,000
Other 533,560 533,560 533,560 533,560 533,560 533,560 $3,201,360 https://www.gsa.gov/travel/plan-book/per-diem-rates?gsaredirect=portalcontent104877
Total Direct Charges 1,380,633 1,392,633 1,392,633 1,392,633 1,392,633 1,392,632 $8,343,797 Indirect Charges $84,244 $84,244 $84,243 $84,243 $84,243 84,243 $505,460
Totals 1,464,877 $1,476,877 1,476,876 1,476,876 1,476,876 1,476,875 $8,849,257
EPA Funding amount must be included on the SF-424 in Section 18.a and on the SF-424A in:
Cell 5(e) under Section A – Budget Summary; and Column (1) under Section B – Budget Categories.
Total Project Cost must be included on the SF-424 in Section 18.g and on the SF-424A in: Cell 5(g) under Section A – Budget Summary; and Column (5), Row k under Section B – Budget Categories.
Other Leveraged Funds should NOT be included in the SF424 and SF424A.
Example Budget Table