U.S. GENERAL SERVICES ADMIN ISTRATION
SCOPE OF CONSTRUCTION PROJECT PAGE 1 OF 2
SCOPE OF WORK
7/17/2018
A. PROJECT IDENTIFICATION
1. PROJECT TITLE ...............................................CBP SECURITY MAINTENANCE PROJECT
2. BUILDING ..........................................................18300 E 71ST AVE, DENVER, CO
3. LOCATION ........................................................18300 E 71ST AVE, DENVER, CO
4. LEASE NUMBER ...............................................LCO14648
5. BUILDING NUMBER. ........................................CO2082ZZ
B. BACKGROUND
CBP wishes to perform maintenance on their security system in the leased space.
C. SCOPE OF SERVICES
Contractor shall provide and install all labor, supplies, materials, on-site supervision, and equipment to update security software and repair security items in the space. The period of performance is in FY2018. All work shall be done but not limited to the building standards and shall meet all code requirements.
1. GENERAL REQUIREMENTS
a. The Contractor shall provide and install a panic bar strike for the back door of the leased space.
b. The Contractor shall provide and install a color monitor for the video access system.
c. The Contractor shall update the Kantech security software to match current standards.
d. The Contractor shall upgrade the video software to match Government standards.
e. The Contractor shall develop a contract estimate to maintain the equipment on an annual basis separate from the repairs.
f. The Contractor shall provide a new computer for video monitoring and access updates.
g. The Contractor shall be in compliance with all local, state, and federal codes.
D. SPECIAL CONSIDERATIONS
1. REVISIONS
a. Any changes must be approved by the client POC and the GSA LCO prior to the commencement of the work.
The Contractor shall not implement the changes until written approval by the GSA LCO is given, with the exception of changes required immediately. Changes requiring verbal approval by the government shall be followed by written documentation of the changes and cost increases or decreases, in addition to the submission of revised document design plans.
U.S. GENERAL SERVICES ADMIN ISTRATION
SCOPE OF CONSTRUCTION PROJECT PAGE 2 OF 2
b. The government shall not be liable for any additional contractor costs due to changes or revisions in the requirements of this document which would increase the scope of services as originally negotiated and agreed to, unless such changes or revisions are authorized and approved by the Contracting Officer in writing. All requests for changes or revisions received by the contractor shall therefore be referred to the Contracting Officer for his or her approval.
c. Any damages to the space will be repaired by the Contractor at their own cost.
2. ACCEPTANCE AND PAYMENT
a. The Government will pay for all services rendered upon the completion of work after and only after a walk-through of the space with (or without) punch list items with all parties present.
END SCOPE OF WORK