About this file

This specification document outlines replacement HAM radio equipment requirements for the Cuyahoga County Emergency Operations Center (EOC) and City of Cleveland EOC. The procurement specifies six units each of the following items: 10-foot metal masts, non-penetrating roof mounts with 60-inch masts and approximately 3-foot square bases, roof mats with minimum 5/8-inch thickness accommodating the complete roof mount base, and ground kits with 300 feet of wire. The awarded vendor must deliver all equipment to the Cuyahoga County Emergency Operations Center, Office of Emergency Management, located at 9300 Quincy Avenue, Floor 1, Cleveland, Ohio 44106, no later than February 28, 2027. Any back-ordered equipment must be substituted with equal or better quality items to fulfill the purchase order at no additional cost to the stated purchase order value.

No pricing terms, set-asides, incumbent information, or funding sources are specified in this document. The specification allows flexibility in ground kit configuration, with the vendor permitted to provide either one 300-foot spool or separate 200-foot and 100-foot lengths based on the customer's site requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Event 7419 – revised 11.23.2026

Specifications for HAM Radio replacement equipment – Cuyahoga County EOC and City of Cleveland EOC

NOTE: All equipment listed must be received by the county no later than 2/28/2027.

Awarded vendor acknowledges any back-ordered equipment must be substituted with equal or better to fulfill the PO. Substitution will not incur any change in cost for the PO value.

Quantity 6: Mast, 10’ - metal

Quantity 6: Roof Mount, non-penetrating, with 60” mast and approx. 3 ft square base

Quantity 6: Roof mat, minimum 5/8th in thick, with minimum footprint accommodating complete roof mount base

Quantity 6: Ground Kit with 300 feet of wire; preferably cut by customer to meet two site’s needs. If one spool isn’t possible, need 200’ and 100’ lengths

Shipping: All equipment to be delivered to;

Cuyahoga County Emergency Operations Center c/o Cuyahoga County Office of Emergency Management

9300 Quincy Ave., Fl 1

Cleveland, OH 44106