This document provides details on the Electric Vehicle Charger Reliability and Accessibility Accelerator Notice of Funding Opportunity. The NOFO makes available up to $100 million in funding from the Bipartisan Infrastructure Law to repair or replace non-operational electric vehicle chargers listed as "temporarily unavailable" on the Department of Energy's Alternative Fuels Data Center. Eligible applicants include state departments of transportation and local governments, who must apply by November 13, 2023 through Grants.gov. Funding can cover up to 80% of costs to repair broken charger components or replace chargers to resume operations for 5 years in compliance with federal requirements. Selections will be based on charger eligibility, project plans, timelines, matching funds availability, and disadvantaged community impact.
Webinar Slides
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EVC_RAA_FAQS.11.7.2023 FINAL.pdf | ||
| Final List ADDENDUM_TMPU Stations_10.12.23.xlsx | XLSX spreadsheet | |
| Final List_TMPU Stations_10.11.23.xlsx | XLSX spreadsheet | |
| Links to Webinar Recording and Slides.docx | DOCX document | |
| alt_fuel_stations (Sep 11 2023)_Interim Eligibility.xlsx | XLSX spreadsheet | |
| alt_fuel_stations (Sep 11 2023)_TU_FHWA.xlsx | XLSX spreadsheet | |
| NOFO 693JJ324NF00001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electric Vehicle Charger Reliability and Accessibility
Accelerator
RAA-NEVI@dot.gov
Background Road Photo (Source: FHWA) mailto:RAA-NEVIgrant@dot.gov
Disclaimer
• Except for any statutes or regulations cited, the contents of this presentation do not have the force and effect of law and are not meant to bind the public in any way.
• This presentation is intended only to provide information to the public regarding existing requirements under the law or agency policies. However, compliance with applicable statutes or regulations cited in this document is required.
Background Road Photo (Source: FHWA) 2
Today’s Webinar
• Welcome
• Overview - Electric Vehicle Charger
Reliability and Accessibility Accelerator
• Overview – Alternative Fuels Data Center Station Locator
• Available Funding & Program Eligibility
• Application Overview
• Selection, ReviewandSubmission
Process Background Road Photo (Source: FHWA) 3
Overview – Electric Vehicle Charger Reliability and Accessibility Accelerator
Background Road Photo (Source: FHWA)
Overview
• The National Electric Vehicle Infrastructure (NEVI) Formula Program was established by the Bipartisan Infrastructure Law (BIL).*
• The $5 billion NEVI Formula Program contains a 10 percent set-aside for the Secretary “to make grants to States and localities that require additional assistance to strategically deploy electric vehicle charging infrastructure.”
• Reflecting the need to make our current EV charging network more reliable, the first round of funding made available in this set-aside from the NEVI Formula program will focus on repairing or replacing non-operational EV chargers.
* BIL - Enacted as the Infrastructure Investment and Jobs Act (IIJA) (Pub. L. No. 117-58, Nov. 15, 2021)
• Program is informed by data from the Department of Energy’s Alternative Fuels Data Center (AFDC) located at the National Renewable Energy Laboratory (NREL)
– https://afdc.energy.gov.
• Charging ports listed as “temporarily unavailable” on the AFDC will be the basis of the available funding.
• Charging providers have 4 weeks from the date of NOFO publication to update the AFDC information via a pre-existing Application Programming Interface (API) (anticipated date for AFDC updates is October 11, 2023).
• Manually submitted “temporarily unavailable” stations to the Station Locator team will not be accepted until after the NOFO closes.
https://afdc.energy.gov/
• A final list will be published 4 weeks after NOFO publication – eligibility will be limited to the broken/non-operational charging ports on this final list.
• The final list will be posted on grants.gov under “related documents” for this grant opportunity.
• 30 days for questions on the NOFO (by October 13, 2023). Submitted to RAA- NEVI@dot.gov.
• Applications due on November 13, 2023.
Overview - Alternative Fuels Data Center Station Locator
Background Road Photo (Source: FHWA) 8
Alternative Fuels Data Center (AFDC) Station Locator afdc.energy.gov/stations
• U.S. Department of Energy maintained database of alternative fueling station location data.
• Public and private station data on all alternative fueling types, including EV charging.
• Primary data source for federal funding programs (i.e., NEVI, community, and corridor grants).
Temporarily Unavailable in the Station Locator
Status codes used for every EV charger included in the Station Locator:
Available Planned Temporarily Unavailable
A charging port can be identified as “temporarily unavailable” for several reasons (e.g., routine maintenance, being non-operational, etc.).
Data is updated daily via charging network automatic data feeds The number of ports listed as “temporarily unavailable” fluctuates regularly
How to Find Temporarily Unavailable Stations afdc.energy.gov/stations/#/analyze?country=US&fuel=ELEC&status=T
Visit link OR Search advanced filters:
– Location = US
– Fuel = Electric
– Charger types = Level 2, DC Fast
– Connectors = All
– Networks = All
– Station = Public
– Status = Temporarily Unavailable
Download results
– Status = column J
– Station ID = column AB https://afdc.energy.gov/stations/#/analyze?country=US&fuel=ELEC&status=T
Available Funding & Program Eligibility
Background Road Photo (Source: FHWA) 12
Available Funding
• BIL authorized funding for FY22 through FY26 for this program ($470M total).
• FY22 and portion of FY23 funding is available for this NOFO - up to approximately $100M.
• Based on initial estimates of eligible chargers and the funding available, the FHWA anticipates that all eligible projects will likely be awarded under this
NOFO.
• Remainder of funding will be made available in future NOFO’s.
Use of Available Funding
• Funding can be used for both publicly and privately owned charging infrastructure.
• Funding can be used for both Direct Current Fast Charger (DCFC) and Level 2 (L2) infrastructure.
• Funded chargers under this NOFO should be operational within 12 months.
• Recipients are encouraged to start work on all chargers as soon as possible, and ensure that repairs for chargers in disadvantaged communities* are not delayed.
• NOTE: Chargers that receive funding under this NOFO will be subject to Title 23, Code of Federal Regulations (CFR), Part 680, including data sharing requirements regarding the charger’s operational status.
*https://www.transportation.gov/equity-Justice40 https://www.transportation.gov/equity-Justice40
Cost Share
• Maximum Federal Share
• The Federal share shall not exceed 80 percent of the total project cost.*
• Awardees must provide at least 20 percent of the total project cost (not 20 percent of the Federal share) as a matching share.
• Additional information on cost share can be found at:
• 2 CFR 200.306 -- Cost sharing or matching and FHWA’s guidance on Non-Federal
Matching Requirements - https://www.fhwa.dot.gov/legsregs/directives/policy/fedaid_guidance_nfmr.pdf
* 23 U.S.C. § 151(f)(10)(A) https://www.fhwa.dot.gov/legsregs/directives/policy/fedaid_guidance_nfmr.pdf
Eligible Applicants
• Eligible applicants include state departments of transportation* and local governments.†
• States and localities are encouraged to coordinate to the extent possible to address broken and non-operational chargers.
• Applicants are strongly encouraged to work directly with site hosts and current owners or operators to ensure viability of the project.
*The term “State” means any of the 50 States, the District of Columbia, or Puerto Rico 23 U.S.C. § 101 (a)(28)
†2 CFR 200.64
Definitions of Repair and Replace ReplaceProject Eligibility
* https://www.federalregister.gov/docume nts/2023/02/28/2023-03500/national-electric-vehicle-infrastructure-standards-and-requirements
Category Definition Examples Repair “Repair” projects can include hardware and labor costs up to, but not including, full replacement of EV chargers and intrinsically related equipment necessary to ensure that broken or non-operational chargers (i) resume a fully operational status for at least 5 years,
(ii) function as intended by the manufacturer, and (iii) comply with 23 CFR 680.*
• Repairing or replacing broken components or subcomponents (e.g., connector, screen, cord, payment terminals)
• Upgrading broken hardware or functional hardware as necessary to meet 23 CFR 680* (e.g., replacing a DCFC power module to provide at least 150kW per port)
• Repairing or replacing a broken connector port, and adding an additional port or ports as needed to comply with 23 CFR 680.*
Replace “Replace” projects can include hardware, permitting, service upgrade and labor costs necessary to remove broken or non-operational EV chargers from service and, at the same location, install new chargers that (i) remain operational for 5 years, (ii) function as intended by the manufacturer, and (iii) comply with
23 CFR 680.*
Broken or non-operational equipment replaced through this program cannot be redeployed through any other federally funded program and must be either recycled or scrapped.
• Fully replacing electric vehicle chargers
• Fully replacing related equipment (e.g., switchgear, utility distribution equipment, battery storage) that is intrinsically related to the Electric Vehicle Supply Equipment (EVSE) and solely dedicated to the operation of
EVSE.
• Upgrading hardware as necessary to meet 23 CFR 680* (e.g., replacing a DCFC power module to provide at least 150kW per port).
https://www.federalregister.gov/documents/2023/02/28/2023-03500/national-electric-vehicle-infrastructure-standards-and-requirements
Application Overview
Background Road Photo (Source: FHWA) 18
Content and Form of Application The application must include:
(1)the required Standard Forms listed in the NOFO; and (2)other content that addresses the following items.
i. Cover Page (including table with project summary information)
ii. Project Narrative (see NOFO for narrative requirements)
iii. Funding Description
iv. Organizational information
Note: All applications must be submitted electronically through Grants.gov.
http://www.grants.gov/
Selection, Review and Submission Process
Background Road Photo (Source: FHWA) 20
Selection Criteria
1. Does EV infrastructure require repair or replacement; and are the proposed activities eligible (see Section C.2).
2. Does the application include an adequate plan for ongoing ownership/stewardship?
3. Ability to meet 12-month timeline for charger to be operational.
4. Availability of 20 percent match.
Review Process
• The FHWA will establish a team to review each application.
• Each application will be reviewed against the eligibility criteria.
• When finished, the team will assign an overall rating of “Recommended” or “Not Recommended” to the application.
Recommended projects will include all projects that meet the criteria.
• The FHWA Administrator will determine which projects to advance to the Secretary. The Secretary makes final project selections.
Application Submission Process
• Applicants must submit their applications via www.grants.gov under the Notice of Funding Opportunity Number: 693JJ324NF00001
• Applications are due by November 13, 2023 by 11:59 PM (Eastern Time) through www.grants.gov
A registered Grants.gov account is required.
Obtaining an account can involve multiple steps and numerous days. Please see the NOFO and Grants.gov website for detailed instructions, training videos, an online user guide, and a help desk.
https://www.grants.gov/web/grants/view-opportunity.html?oppId=350190 https://www.grants.gov/web/grants/view-opportunity.html?oppId=350190
Questions
• Please submit questions in writing to the RAA-NEVI email inbox at:
RAA-NEVI@dot.gov mailto:RAA-NEVIgrants@dot.gov
Thank You for Attending Please direct all inquiries to:
RAA-NEVI@dot.gov
Background Road Photo (Source: FHWA) 25 mailto:RAA-NEVIgrants@dot.gov
| Electric Vehicle Charger Reliability and Accessibility Accelerator |
| Disclaimer |
| Today’s Webinar |
| Overview – Electric Vehicle Charger Reliability and Accessibility Accelerator |
| Overview |
| Overview |
| Overview |
| Overview - Alternative Fuels Data Center Station Locator |
| Alternative Fuels Data Center (AFDC) Station Locator |
| Temporarily Unavailable in the Station Locator |
| How to Find Temporarily Unavailable Stations |
| Available Funding & Program Eligibility |
| Available Funding |
| Use of Available Funding |
| Cost Share |
| Eligible Applicants |
| Definitions of Repair and Replace ReplaceProject Eligibility |
| Application Overview |
| Content and Form of Application |
| Selection, Review and Submission Process |
| Selection Criteria |
| Review Process |
| Application Submission Process |
| Questions |
| Thank You for Attending |