EvaluationCriteria_Additional_Specs_SitePrepContract_FY23.docx
DOCX document 17 KB Posted
- Attached to
- Pesticide application for site preparation on 79 acres in Chocktaw and Pontotoc Counties in Mississippi.
- Solicitation number
- 1125721
- Issued by
-
Department of Agriculture Forest Service
About this file
This document provides additional specifications for the evaluation criteria, other than lowest price, for a site preparation contract using specified herbicides on the Tombigbee National Forest. The contractor will furnish all herbicides, adjuvants, and optional dyes, as well as permits, labor, transportation, and equipment required to complete the work. The contractor must have appropriate applicator certifications and ensure all label requirements are met. The 79-acre contract area is located in Choctaw and Pontotoc Counties, Mississippi, and requires the application of a specific herbicide mixture at a rate of 10 gallons per acre. The contract is being solicited by the U.S. Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD-MS_1979-0150_64_revised12_26_23.pdf | ||
| (1) RFQ1125721 .docx | DOCX document | |
| LittleOwlNorth_SPPMap_2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL SPECIFICATIONS
FOR EVALUATION CRITERIA OTHER THAN LOWEST PRICE
TOMBIGBEE NATIONAL FOREST
SITE PREPERATION CONTRACT
USING SPECIFIED HERBICIDES
100 - ADDITIONAL SPECIFICATIONS
100.01 - Contractor –Furnished Items The contractor will furnish all herbicides, adjuvant, and (optional) dyes. Herbicide containers and labels will be inspected by the COR before use to ensure they have the equivalent active ingredients of the chemicals listed on the Schedule of Items (attached). Water for herbicide mixing will be available at the Ackerman Work Center only for the initial fill up. All alternate water sources that the contractor would like to use must be approved by the COR prior to use. Contractor must be able to refill equipment on site using their own equipment/resources (i.e. water tender or clean water tank as described in 100.01b).
The contractor will furnish all permits required by law, labor, transportation, supervision, materials, equipment, and personal protection equipment needed to complete the contract. This includes but is not limited to mixing containers and tanks, clean water source tanks, low pressure sprayers equipped with an applicator for direct foliar use.
100.01a - Storage tanks must be equipped with watertight lids, agitators, and must have a control valve attached directly to the outlet on the tank. Agitators must affix to the tank and be able to perform independently while tank lid is closed. This specification is intended to reduce worker exposure to herbicide and to reduce potential for accidental herbicide spills.
100.01b– Contractor will be expected to have a second storage tank on site that is used for clean water only. This tank is to provide water to herbicide storage tanks for mixing only the amount of herbicide solution expected to be used during that day.
100.02 - Permits and Responsibilities for the Work The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, certifications and permits, and for complying with any applicable Federal, State, and municipal laws, codes, and regulations in connection with the use of pesticides under this contract.
100.02b - Training and Certification Successful bidder will comply with all Federal and Mississippi State laws relating to the commercial, for-hire, application of pesticides. Successful bidder will be required to show proof of appropriate applicator certifications, licensing and bonding as required by those laws. Contractor will ensure that all label requirements are met by the crew during the performance of their work.