Evaluation Tool-Tower Services---Maintenance 12-7.xls

XLS spreadsheet 119 KB Posted

Attached to
Master Agreement AZ|CTR053007
Contract number
CTR053007
Issued by
Arizona

About this file

This document is an evaluation summary for a solicitation (No. BPM002972) for Tower Services Maintenance, involving four offerors: ADW Communications, Enertech Resources, NB Construction, and TEP Design and Build. The evaluation process assessed the companies across multiple criteria including methodology, written narrative, cost/pricing, experience and capacity, qualified personnel, training and certifications, maintenance and repair capabilities, emergency response, task order management, site service provision, and warranty processes.

The contract appears to be for telecommunications site maintenance services, with hourly rates ranging from $75-$95 for maintenance labor and $95-$125 for foreman rates. Emergency call-out fees varied between $187.50-$210.00. Material markup percentages differed among offerors, from 2-12%. ADW Communications achieved the highest total score of 851 points out of 1000, followed by Enertech Resources at 814 points, NB Construction at 801 points, and TEP Design at 696 points. The scoring considered technical capabilities, cost competitiveness, and overall service delivery potential for maintaining state-owned telecommunications infrastructure.

View the file

Other files

File Type Posted
CTR053007_COI_Valid_Thru_6-1-23.pdf PDF
Clarification Letter TEP 10-23.docx DOCX document
Clarification Response TEP 10-23-20.docx DOCX document
Exhibit II Task Order Scope of Work Request Example_WSB Ver II.pdf PDF
Part 3B UniformTerms Conditions Tower Services.pdf PDF
TEP_Certificate_of_Insurance_Valid_Thru_6-1-21.pdf PDF
Award Letter TEP Design for Maintenance and Repair Portion of Tower Services Solicitation.docx DOCX document
CTR053007_Amendment_05_Contract_Extension_to_12-8-25.pdf PDF
CTR053007_COI_Valid_Thru_6-1-26.pdf PDF
Exhibit I WSB State Owned Telecommunications Sites.pdf PDF
Exhibit III_Change Order_WSB Ver II.pdf PDF
Tower Services Executive Summary Mainteance and Repair.pdf PDF
1-BPM002972_TEP_Maintenance_Services_10-14-20.pdf PDF
CTR053007_Amendment_02_Travel_10-22.pdf PDF
CTR053007_Amendment_04_Contract_Extension_to_12-8-24.pdf PDF
CTR053007_COI_Valid_Thru_6-1-24.pdf PDF
Clarification Letter TEP 11-17.docx DOCX document
Clarification Response TEP 10-26.pdf PDF
Clarification Response TEP 11-9.pdf PDF
Part 1 Tower Services Instructions and Attatchments Ver IV- MG.pdf PDF
Tower Service Legal Add.pdf PDF
CTR053007_Amendment_03_Contract_Extension_to_12-8-23.pdf PDF
CTR053007_Amendment_06_Contract_Extension_to_4-8-26.pdf PDF
Clarification Letter TEP 11-5.docx DOCX document
Listing of Suppliers from APP.docx DOCX document
Part 2 Technical and Commerical Tower Services.pdf PDF
Part 3A Special Terms and Conditions Tower Services.pdf PDF
Part_2_Technical_and_Commerical_Tower_Services_Revision_10-22.pdf PDF
Part_3A_Special_Terms_and_Conditions_Tower_Services_Revised_10-22.pdf PDF
Tower Services NDA's.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Summary

EVALUATION
Solicitation No. BPM002972 Tower Services-----MaintenanceADW CommunicationsEnertech ResourcesNB ConstructionTEP Design and Build
1000Combined Total Score850813800696
125Methodology Total8888880
125Written NarrativeMeets88Meets88Meets88Does Not Meet0
Offeror to provide sufficient information on how they will perform the construction, engineering services, maintenance, installation, repair and parts availability as outlined in the Scope. Please respond to the service/services that the Offeror will be providing.Does not meet: Does not provide enough detail of the services provided for maintance and repair.
350Cost/Pricing Total350313345328
525Experience and Capacity Total413413368368
75Qualified Personnel, labor, servicesMeets53Meets53Meets53Meets53
Please provide details on your company’s ability to provide all qualified personnel, labor, services, safety and general use equipment, tools, all materials (including civil construction and equipment installation materials), insurance, certifications, transportation, applicable taxes and all other items of expense required for execution and completion of the work in a quality manner for the price(s) offered/awarded in the Task Order. (Scope 2.2)
75Training and CertificationsMeets53Exceeds75Meets53Meets53
Please describe the process that your company will be utilizing to ensure that training and certificates are completed and available as required. As an Example: Personnel assigned to climb must have current tower climbing and rescue certifications that meet the requirements of ANSI/OSHA standards and regulations for wireless communication sites. (Scope 2)Exceeds: Comprehensive and all areas are covered. Clearly a priority with this company
0Exceeds0Exceeds0Exceeds0Exceeds0
75Maintenance & RepairExceeds75Exceeds75Meets53Meets53
If providing maintenance and repair services, please describe your company’s ability and experience (Scope 3.4) Provide in detail: experience in the Telecommunications industry, the jobs that your company has completed in the last 1-3 years that are similar to the Scope items listed in 3.4, details of the preventative maintenance tower requirement your company has performed, the size of your company, current capacity and ability to perform concurrent multiple jobs. (Scope 3.4)Exceeds: Demonstrated experience with DPS sites and procedures.Exceeds: Provided clear understanding and examples of multiple requirements for maintenance and repair situations
75Emergency RequestsMeets53Meets53Meets53Meets53
Please describe the process your company has in place for responding to emergency requests for on call and onsite maintenance support within the timeframes specified. (Scope 3.5)
75Task OrdersMeets53Meets53Meets53Meets53
Please describe your company’s ability to respond and adhere to the requirements of a Task Order. Provide several detail/examples of: final invoices vs estimates. (Scope 4.0)
75Providing materials/services to all sitesExceeds75Meets53Meets53Meets53
Please describe your company’s ability to provide materials/service to “all” state owned telecommunications sites. Provide details for rugged terrain site access and large equipment transportation. (Scope 5.0)Exceeds: Multiple availability of equipment to get materials and personnel to all sites. Have an excellent understanding of what will be required for each site.
75WarrantyMeets53Meets53Meets53Meets53
Please describe your company’s warranty process for both labor and materials/equipment. (Scope 6.0)
Meets0Meets0Meets0Meets0
Meets0Meets0Meets0Meets0
Meets0Meets0Meets0Meets0
Financial Stability0000
Exceeds = The response fully addresses the requirement(s) of the RFP but also provides superior experience, a creative/innovative approach, or an exceptional solution.
Meets = The response meets the requirement(s) outlined in the RFP.
Does Not Meet = The response fails to address the requirement(s) of the RFP or fails to provide any experience related to the requirement(s) of the RFP or elements of the proposal are unacceptable to the state.
Exceeds
Meets
No Adm Actions
One Adm Issue
Two Adm Issues
Three Adm Issues
Four Issues or Term.
No Referral Reassigned
<2 Referrals Reassigned
>2 Referrals Reassigned

Rates

Bids
OfferorsMaintenance Hrly Rate LaborMaintenance Hrly Rate FormanEmergency Call Out FeeTotal CostTotal Points
ADW Communications$75.00$112.50$187.50350
Enertech Resources$85.00$125.00$210.00313
NB Construction$95.00$95.00$190.00345
TEP Design$75.00$125.00$200.00328
Percent Discount off of Materials
ADW CommunicationsMark up of 12%
Enertech Resources4%
NB Construction2%
TEP Design5%
Lowest Bid
Scoring Formula = Lowest Bid/Proposed Bid x 350

Total Score

OfferorMethodCostExperienceTotal Score
Possible Points1253505251000
ADW Communications88350413851
Enertech Resources88313413814
NB Construction88345368801
TEP Design0328368696
Note:

File details come from the government source that posted it. Updated .