EVALUATION CRITERIA.pdf
PDF 52 KB Posted
- Attached to
- EL MALPAIS VAULT TOILET PUMPING
- Solicitation number
- 140L2221Q0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L2221Q0005_Amd_0001.pdf | ||
| El_Malpais_NCAToiletPumping_SOW.docx | DOCX document | |
| Bid_Schedule__El_Malpais_Toilet_Pumping.docx | DOCX document | |
| El_MalpaisNCA_location.pdf | ||
| Sol_140L2221Q0005.pdf | ||
| beta.SAM.gov _ Search.pdf | ||
| El_MalpaisNCA_VaultToiletSites.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION FACTORS
El Malpais NCA Vault Toilet Pumping
A technical Evaluation Panel consisting of no less than three members will conduct the initial evaluation.
Upon completion of the evaluation period, the panel will review each proposal and make their final award recommendation to the Contracting Officer. Provide your bid in two separate volumes: Volume 1 –
Pricing. Volume 2 – Non-pricing, which includes information of evaluation factors.
All evaluation factors other than price, when combined will be weighted equally. The evaluation factors listed below will be used to select the contractor that offers the BLM the LPTA offer.
Evaluation Factor 1: Contractor Technical Capability
Quote should include (1) a statement demonstrating capability to complete all vault toilet pumping services (pumping, waste disposal, water hauling and water treatment) based on the BLM provided
Statement of Work (SOW). (2) if applicable, define the work you intend to subcontract and provide subcontractor’s company name, address telephone and email address.
File details come from the government source that posted it. Updated .