ESL21-001.pdf
PDF 193 KB Posted
- Attached to
- ESL21-001 Ultra Low Air Hoist
- Solicitation number
- N4044621Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED SYNOPSIS SOLICITATION.docx | DOCX document | |
| COMBINED SYNOPSIS SOLICITATION.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USS EMORY S LND
( AS 39 )
SPONSOR RELATED CONTRACT NO. N40446-21-R-XXXX
ITEM NO. 0701 CATEGORY "A" 2021-04-08
Repair Ultra Low Air Hoist Riodique, Angelito
0701 - 1
1.0 ABSTRACT
1.1 This work item describes the requirements to repair, test and preserve Ultra Low
Air Hoist.
2.0 REFERENCE/ENCLOSURE
2.1 Reference: None
3.0 ITEM LOCATION/DESCRIPTION/QUANTITY:
3.1 Ingersoll Rand Hoist ULA050P/99054
3.2 Gardner Denver Tractor TATA04-1172
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None
5.0 NOTES:
5.1 The contractor and all subcontractors regardless of tier are advised to review and other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work
Item 001.
7.0 STATEMENT OF WORK REQUIRED
7.1 Contractor to provide labor and materials to disassemble, repair, assemble and test the equipment identified in 3.1
7.1.1 Contractor to procure and provide the following Contractor Furnished
Materials to repair the equipment identified in 3.1 and 3.2:
ITEM DESCRIPTION QUANTITY
Ingersoll Rand Breather, Norgen MV002A
Ingersoll Rand Bundle Hose-4 BTN 20
Ingersoll Rand Fitting Aeroquip #2021-8-8S
Ingersoll Rand Fitting, Nipple 0.75 NPT Close
Ingersoll
SPONSOR RELATED CONTRACT NO. N40446-21-R-XXXX
0701 - 2
Rand
Gasket
IR7G
Ingersoll Rand Gasket IR8G
Ingersoll Rand Muffler IR9M
Ingersoll Rand Cylinder
IR10C
Gear Case Gasket HLK-31
Vane Packet IR12VP
Brake Service Kit MLK-ABK1
Chain Link HLK, Zinc Plated
70 Feet
MLK Hoist Overhaul Kit
Hoist Testing Mount
Hoist Crate
16 Limit Switch 1
17 Air Distribution Block 1
18 Fittings 1
19 Chain Bag 1
20 Tractor Parts 1
21 Misc Parts MPT Fabrication 1
22 Filter Regulator Lubricator 1
7.2.4 Upon completion of repair, load test equipment and provide load testing certificate.
7.3 Equipment identified in 3.1 and 3.2 shall be prepared to SSPC-SP 10 Near White
Blast Cleaning. All areas that are not normally painted shall be protected from blasting operation.
7.4 Coatings Application
7.4.1 Ensure surfaces are clean, dry and free of oil, grease or residue from abrasive blasting.
SPONSOR RELATED CONTRACT NO. N40446-21-R-XXXX
0701 - 3
7.4.2 All coatings shall be prepared and applied in accordance with the manufacturers requirements outlined in the Product Data Sheets.
7.5 Reports
7.5.1 Upon completion of all repairs, inspections, and tests the contractor shall prepare & submit a report to include testing. They shall be typewritten reports documenting the examination of the system and final “as released” conditions. Submit three (3) typewritten copies of the report to the MSCREP.
7.6 Upon completion of repair and test, crate the equipment and shipped to:
MSC SSU GUAM
BLDG 3110/K1
US NAVAL BASE GUAM
SANTA RITA GUAM 96915
ATTN: ESL CHIEF ENGINEER/PORT ENGINEER
8.0 GENERAL REQUIREMENTS: Known Source
8.1 International Air Tool and Industrial
Supply Company
3574 Hanock Street
San Diego CA. 92110
Phone: 619-795-7955
FAX: 619-599-8880
E-Mail: info@intlairtool.com
8.2 Period of Performance: 15MAY-15JUN 2020
mailto:info@intlairtool.com
File details come from the government source that posted it. Updated .